ML25104A230

From kanterella
Jump to navigation Jump to search
U.S. Geological Survey Triga Reactor - Reactor Supervisor Change
ML25104A230
Person / Time
Site: U.S. Geological Survey
Issue date: 04/14/2025
From: Wallick J
US Dept of Interior, Geological Survey (USGS), US Dept of Interior, Rocky Mountain Region, Denver Federal Center
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
Download: ML25104A230 (1)


Text

U.S. GEOLOGICAL SURVEY Rocky Mountain Region Box 25046 M.S. 974 Denver Federal Center Denver, Colorado 80225 USGS - Facility License R-113 - Docket Number 50-274 Page 1 of 1 Document Date: 2025-04-14 DATE:

Monday, April 14, 2025 TO:

Attn: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 FROM:

Jonathan Wallick, Reactor Director

SUBJECT:

U.S. Geological Survey TRIGA Reactor - Reactor Supervisor Change PURPOSE By way of this letter, the U.S. Geological Survey TRIGA Reactor (GSTR) is informing the U. S. Nuclear Regulatory Commission of a change of the person assigned the roles of Reactor Supervisor/Director (Level 2) for the GSTR.

BACKGROUND In accordance with the USGS Technical Specifications part 6.7.2, upon permanent changes in facility organization involving Level 1 or Level 2 personnel, it is required of the licensee to officially notify the U. S. NRC within 30 days via written report.

DISCUSSION On the departure of Reactor Supervisor/Director Jonathan Wallick as of April 18th, 2025, facility Health Physicist Clayton Manning has been named interim acting Reactor Supervisor/Director. Clayton holds a masters degree in nuclear engineering and is in his tenth year of service at the GSTR, holding a reactor operator license starting in February of 2016, which was upgraded to a senior reactor operator license in February of 2017.

CONTACT If you have any questions regarding this matter, please contact me at (303) 236-4726.

I declare under penalty of perjury that the foregoing is true and correct.

Sincerely, Jonathan Wallick, Reactor Director (Outgoing)

Copied to:

Shannon Mahan, Reactor Administrator, USGS Brooke Gallagher, Project Manager, US NRC Juan Arellano, Inspector, US NRC Attachments: None.

JONATHAN WALLICK 2025.04.14 12:51:41

-06'00'