Text
U.S. GEOLOGICAL SURVEY Rocky Mountain Region Box 25046 M.S. 974 Denver Federal Center Denver, Colorado 80225 USGS - Facility License R-113 - Docket Number 50-274 Page 1 of 1 Document Date: 2025-04-14 DATE:
Monday, April 14, 2025 TO:
Attn: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 FROM:
Jonathan Wallick, Reactor Director
SUBJECT:
U.S. Geological Survey TRIGA Reactor - Reactor Supervisor Change PURPOSE By way of this letter, the U.S. Geological Survey TRIGA Reactor (GSTR) is informing the U. S. Nuclear Regulatory Commission of a change of the person assigned the roles of Reactor Supervisor/Director (Level 2) for the GSTR.
BACKGROUND In accordance with the USGS Technical Specifications part 6.7.2, upon permanent changes in facility organization involving Level 1 or Level 2 personnel, it is required of the licensee to officially notify the U. S. NRC within 30 days via written report.
DISCUSSION On the departure of Reactor Supervisor/Director Jonathan Wallick as of April 18th, 2025, facility Health Physicist Clayton Manning has been named interim acting Reactor Supervisor/Director. Clayton holds a masters degree in nuclear engineering and is in his tenth year of service at the GSTR, holding a reactor operator license starting in February of 2016, which was upgraded to a senior reactor operator license in February of 2017.
CONTACT If you have any questions regarding this matter, please contact me at (303) 236-4726.
I declare under penalty of perjury that the foregoing is true and correct.
Sincerely, Jonathan Wallick, Reactor Director (Outgoing)
Copied to:
Shannon Mahan, Reactor Administrator, USGS Brooke Gallagher, Project Manager, US NRC Juan Arellano, Inspector, US NRC Attachments: None.
JONATHAN WALLICK 2025.04.14 12:51:41
-06'00'