KP-NRC-2504-002 Kairos Power LLC www.kairospower.com 707 W Tower Ave, Suite A 5201 Hawking Dr SE 2101 Rexford Rd, Suite 300E Alameda, CA 94501 Albuquerque, NM 87106 Charlotte, NC 28211 April 9, 2025 Docket No. 50-7513 Docket No. 50-611 Docket No. 50-612 US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Kairos Power LLC Presentation Materials for Public Meeting Regarding Applicability of 10 CFR Part 21 and 10 CFR 50.55(e) to Hermes Non-Power Reactors
References:
- 1. Letter, Nuclear Regulatory Commission (NRC) to Kairos Power LLC, U.S. Nuclear Regulatory Commission Staff Feedback Regarding Kairos Power LLC White Paper, Basic Component Definition for the Hermes Non-Power Test Reactors, February 27, 2025 (ML24250A128)
- 2. Letter, Kairos Power LLC to U.S. Nuclear Regulatory Commission, Kairos Power LLC Application of the 10 CFR Part 21 and 10 CFR 50.55(e) Basic Component Definition to Hermes and Hermes 2 Non-Power Test Reactors, April 1, 2024 (ML24092A389)
This letter transmits the presentation slides for the April 18, 2025 public meeting regarding the applicability of 10 CFR Part 21 and 10 CFR 50.55(e) to the Hermes non-power reactors. During the April 18 public meeting, participants will discuss an approach to comply with 10 CFR Part 21 and 10 CFR 50.55(e) for the Hermes non-power reactors. This approach incorporates Nuclear Regulatory Commission staff feedback provided by letter dated February 27, 2025 (Reference 1) on Kairos Power white paper Basic Component Definition for the Hermes Non-Power Test Reactors submitted April 1, 2024 (Reference 2).
The slides are provided in the enclosure to this letter. Kairos Power authorizes the Nuclear Regulatory Commission to reproduce and distribute the submitted content, as necessary, to support the conduct of their regulatory responsibilities.
If you have any questions or need any additional information, please contact Michael Ellett at ellettmic@kairospower.com or (704) 247-6310 or Drew Peebles at peebles@kairospower.com or (704) 275-5388.
Sincerely, Peter Hastings, PE Vice President, Regulatory Affairs and Quality
KP-NRC-2504-002 Page 2
Enclosure:
Presentation slides for the April 18, 2025 public meeting regarding the applicability of 10 CFR Part 21 and 10 CFR 50.55(e) to the Hermes non-power reactors (Non-Proprietary) xc (w/enclosure):
Joshua Borromeo, Chief, NRR Advanced Reactor Licensing Branch Edward Helvenston, Project Manager, NRR Advanced Reactor and Licensing Branch Samuel Cuadrado de Jesus, Project Manager, NRR Advanced Reactor Licensing Branch Matthew Hiser, Project Manager, NRR Advanced Reactor Licensing Branch Cayetano Santos Jr., Project Manager, NRR Advanced Reactor Licensing Branch