ML25099A116

From kanterella
Jump to navigation Jump to search
Notice of Public Meeting - Annual Assessment Meeting for Millstone Power Station
ML25099A116
Person / Time
Site: Millstone  
Issue date: 04/09/2025
From: Matt Young
Division of Operating Reactors
To:
References
Download: ML25099A116 (1)


Text

U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING April 9, 2025 Licensee:

Dominion Energy Nuclear Connecticut, Inc.

Facility:

Millstone Power Station, Units 2 and 3 Docket Nos:

50-336 and 50-423 Date/ Time:

Wednesday, April 30, 2025 6:00 p.m.

Location:

Waterford Town Hall 15 Rope Ferry Road Waterford, CT 06385

Purpose:

The Nuclear Regulatory Commission staff will host a public meeting with the Connecticut Nuclear Energy Advisory Council (NEAC) to discuss the NRCs assessment of safety performance at the Millstone Power Station for 2024, as described in the March 11, 2025, annual assessment letter.

Following the meeting, the NRC will respond to questions from members of the public and NEAC members on specific performance issues at the plant and our role in ensuring safe plant operations.

NRC Attendees:

M. Young, Chief, Projects Branch 2, Division of Operating Reactor Safety J. Fuller, Senior Resident Inspector E. Bousquet, Resident Inspector D. Antonangeli, Resident Inspector NEAC Attendees:

NEAC Committee Membership Public Participation: This is an Information Meeting with a question-and-answer session.

Public attendance at NEAC meetings is permitted and encouraged in accordance with its charter. The meeting will begin with a presentation by NRC staff on the NRCs assessment of 2024 performance at Millstone.

Following the presentation, NEAC members and the public will have the opportunity to ask questions specific to plant safety performance and the NRCs role in ensuring safe plant operations. Questions may be submitted in advance to Matt.Young@nrc.gov.

Meeting

Contact:

Matt R. Young, Projects Branch 2 (610) 337-5205 Email: Matt.Young@nrc.gov

2 The NRCs annual assessment letter regarding Millstones performance during 2024 can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) at Accession Number ML25069A533. ADAMS is accessible from the NRCs website at:

www.nrc.gov/reading-rm/adams.html. Additional information on the NRCs annual assessment process and the safety performance at Millstone can be found on the NRCs website at:

https://www.nrc.gov/reactors/operating/oversight.html.

The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective March 19, 2021, applies to this meeting. The policy statement may be found on the NRC website, https://www.govinfo.gov/content/pkg/FR-2021-03-19/pdf/2021-05787.pdf.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting or need the meeting notice or other information from the meeting in another format (e.g., Braille, large print), or if you require translation services, please notify the NRCs meeting contact.

Determinations on requests will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests to the NRC meeting contact no later than April 28 - two business days prior to the April 30, 2025, meeting.

Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances.

Please confirm the meeting schedule on the NRC website (www.NRC.gov) under public meetings.

Approved by:

Matt R. Young, Chief Projects Branch 2 Division of Operating Reactor Safety cc: Distribution via ListServ MATTHEW YOUNG Digitally signed by MATTHEW YOUNG Date: 2025.04.09 10:35:41 -04'00'

ML25099A116 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DORS RI/PAO RI/DORS NAME NMentzer DScrenci MYoung DATE 4/8/2025 4/8/2025 4/8/2025