Summary of Public Meeting with Florida Power & Light Company for LAR - 10 CFR 50.69 - Turkey Point Nuclear Generating Unit Nos. 3 and 4 (EPID L-2025-LRM-0029)
ML25098A307
Person / Time
Site: Turkey Point  
Issue date: 04/10/2025
From: Blake Purnell
NRC/NRR/DORL/LPL2-2
To:
Florida Power & Light Co
Purnell B, NRR/DORL/LPL2-2
References
EPID L-2025-LRM-0029
Download: ML25098A307 (1)


Text

April 10, 2025 LICENSEE:

FLORIDA POWER & LIGHT COMPANY FACILITIES: TURKEY POINT NUCLEAR GENERATING UNIT NOS. 3 AND 4

SUBJECT:

SUMMARY

OF APRIL 8, 2025, PUBLIC MEETING WITH FLORIDA POWER &

LIGHT COMPANY REPRESENTATIVES REGARDING A PLANNED LICENSE AMENDMENT REQUEST TO IMPLEMENT 10 CFR 50.69 AT TURKEY POINT NUCLEAR GENERATING UNIT NOS. 3 AND 4 (EPID L-2025-LRM-0029)

On April 8, 2025, a public preapplication meeting was held between the U.S. Nuclear Regulatory Commission staff and representatives of Florida Power & Light Company (the licensee), which is a subsidiary of NextEra Energy, Inc. The purpose of the meeting was for the licensee to discuss the status of activities to support a planned license amendment request (LAR) for Turkey Point Nuclear Generating Unit Nos. 3 and 4 (Turkey Point). The planned amendments would allow the licensee to implement Title 10 of the Code of Federal Regulations Section 50.69, Risk-informed categorization and treatment of structures, systems and components for nuclear power reactors. The meeting notice and agenda are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML25080A080. A list of attendees is enclosed.

The licensees presentation slides (ML25092A069) provide the details of the information discussed. The licensee provided background information and discussed the planned approach to seismic risks. The licensee stated that the LAR would provide a comparison of the ground motion response spectrum to the safe shutdown earthquake (see slide 9). The licensee noted that the planned reactor coolant pump seal replacement at Turkey Point has not happened yet.

The licensee plans to submit the LAR in the second quarter of 2025. The licensee stated that it will request approval within 1 year of acceptance but there are no current activities planned that would rely upon the approval by a specific date.

Please direct any inquiries to me at 301-415-1380 or Blake.Purnell@nrc.gov.

/RA/

Blake Purnell, Senior Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-250 and 50-251

Enclosures:

List of Attendees cc: Listserv

ML25098A307

  • e-Concurrence NRC-001 OFFICE NRR/DORL/LPL2-2/PM NRR/DORL/LPL2-2/LAiT NRR/DORL/LPL2-2/BC NAME BPurnell CAdams (SL)

DWrona DATE 4/9/2025 4/9/2025 4/10/2025 OFFICE NRR/DORL/LPL2-2/PM NAME BPurnell DATE 4/10/2025

Enclosure LIST OF ATTENDEES APRIL 8, 2025, MEETING WITH FLORIDA POWER & LIGHT COMPANY Name Affiliation Blake Purnell U.S. Nuclear Regulatory Commission (NRC)

Derek Scully NRC Jay Robinson NRC Sheila Ray NRC Drew Childs NRC Ellery Coffman NRC Fred Forsaty NRC Jason English NRC Jeff Circle NRC Stephen Cumblidge NRC Steven Alferink NRC Dan Widrevitz NRC Ming Li NRC Ed Miller NRC Vladimiir Graizer NRC Rosalynn Wang NRC Gurjendra Bedi NRC Nate Jordan NRC Jerry Phillabaum Florida Power & Light Company (FPL)

Joseph Stringfellow FPL David Stoia FPL Keith Vincent FPL Rob Burg Engineering Planning and Management, Inc. (EPM)

Chico Pellizzari EPM Justin Wheat Wheat Consulting LLC