And Surry Power Station Units 1 and 2 and Associated Independent Spent Fuel Storage Installations Revision to Emergency Action Level Technical Bases Document Report of Change
ML25097A189
Person / Time
Site: Surry, North Anna, 07200002, 07200055  Dominion icon.png
Issue date: 04/01/2025
From: James Holloway
Virginia Electric & Power Co (VEPCO)
To:
Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation, Document Control Desk
References
Download: ML25097A189 (1)


Text

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 April 1, 2025 Serial No.:

NRA/AF:

Docket Nos.:

25-102 RO 50-280/281 50-338/339 72-2/55 72-16/56 License Nos.:

DPR-32/37 SNM-2501 NPF-4/7 SNM-2507 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION ENERGY VIRGINIA}.

NORTH ANNA AND SURRY POWER STATION UNITS 1 AND 2 AND ASSOCIATED INDEPENDENT SPENT FUEL STORAGE INSTALLATIONS REVISION TO EMERGENCY ACTION LEVEL TECHNICAL BASES DOCUMENT -

REPORT OF CHANGE Pursuant to 10 GFR 50.54(q)(5) and 10 CFR 72.44{f), a summary of the change analysis for Revision 12 of the North Anna Power Station (NAPS) Emergency Action Level Technical Bases Document (NEAL TBD) and Revision 9 to the Surry Power Station (SPS)

Emergency Action Level Technical Bases Document (SEAL TBD) is provided in and Attachment 2, respectively.

Revision 12 of the NEAL TBD made editorial changes to the security reportability reference from 10 GFR 73.71 to 10 GFR 73.1200. The changes to the NEAL TBD went into effect on March 6, 2025. The changes incorporated in the revision did not require prior NRG approval and do not implement actions that reduce the effectiveness of the NAPS Emergency Plan or Emergency Action Levels. The NAPS Emergency Plan and Emergency Action Levels continue to meet the standards of 10 GFR 50.47(b) and Appendix E.

Revision 9 of the SEAL TBD made editorial changes to the security reportability reference from 10 GFR 73.71 to 10 GFR 73.1200 and replaced references to site specific procedures with fleet procedures. The changes to the SEAL TBD went into effect on March 18, 2025. The changes incorporated in the revision did not require prior NRG approval and do not implement actions that reduce the effectiveness of the SPS Emergency Plan or Emergency Action Levels. The SPS Emergency Plan and Emergency Action Levels continue to meet the standards of 10 GFR 50.47(b) and Appendix E.

Serial No.: 25-102 Docket Nos.: 50-280/281, 72-2/55 50-338/339, 72-16/56 Page 2 of3 10 CFR 50.54(q)(5) requires licensees report changes made to the emergency plan not requiring prior NRG approval within 30 days after the change is put into effect If you have any questions or require additional information, please contact Allen Fulmer, Corporate Nuclear Regulatory Affairs, at 804-273-2268.

Sincerely, ~JP1/2 James E. Holloway Vice President - Nuclear Engineering & Fleet Support Commitments made by this letter: None Attachments:

1. North Anna Power Station Emergency Action Level Technical Basis Document Change, 10 CFR 50.54(q)(5) Summary
2. Surry Power Station Emergency Action Level Technical Basis Document Change, 10 CFR 50.54(q)(5) Summary

cc:

Regional Administrator, Region II U. S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Avenue, NE., Suite 1200 Atlanta, GA 30303-1257 Mr. L. John Klos NRC Senior Project Manager-Surry Power Station U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 09 E-33 11555 Rockville Pike Rockville, Maryland 20852-2738 Mr. G. Edward Miller Serial No.: 25-102 Docket Nos.: 50-280/281, 72-2/55 50-338/339, 72-16/56 Page 3 of3 NRC Senior Project Manager - North Anna Power Station U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 09 E-33 11555 Rockville Pike Rockville, Maryland 20852-2738 NRC Senior Resident Inspector North Anna Power Station NRC Senior Resident Inspector Surry Power Station State Health Commissioner Virginia Department of Health James Madison Building - 7th Floor 109 Governor Street, Suite 730 Richmond, Virginia 23219 Ms. Yen-Ju J. Chen NRC Senior Project Manager - ISFSls U. S. Nuclear Regulatory Commission Mail Stop 4B34 Two White Flint North 11545 Rockville Pike Rockville, Maryland 20852-2738 Old Dominion Electric Cooperative R-North-Anna-Correspondence@odec.com

ATTACHMENT 1 Serial No.: 25-102 Docket Nos.: 50-338/339 72-16/56 North Anna Power Station Emergency Action Level Technical Basis Document Change 10 CFR 50.54(g)(5} Summary DOMINION ENERGY VIRGINIA (VIRGINIA ELECTRIC AND POWER COMPANY)

NORTH ANNA POWER STATION UNITS 1 AND 2 NORTH ANNA INDEPENDENT SPENT FUEL STORAGE INSTALLATION

Serial No.: 25-102 Docket Nos.: 50-338/339 72-16/56 Page 1 of 1 North Anna Power Station Emergency Plan Change, 10 CFR 50.54(g)(5) Summary On March 6, 2025, the North Anna Power Station Emergency Action Level Technical Bases Document (NEAL TBD), Revision 12, was implemented, incorporating changes authorized 10 CFR 50.54(q) as described below.

The NRC revised the requirements for physical security event notifications and added two new notification requirements associated with imminent or actual hostile acts and possession of enhanced weapons. The new regulation replaces 10 CFR 73.71 with requirements moved to 10 CFR 73.1200 that simplify and reorganize existing physical security event notification requirements into several timeliness categories (e.g., 15-minute, 1-hour, 4-hour, and 8-hour notifications). NAPS Emergency Action Levels HU1.1, HA 1.1, and HS1.1 are unaffected by this regulation change.

The reference to the regulation contained in the NEAL TBD for HU1.1, HA1.1 and HS1.1 was changed from 10 CFR 73.71 to 10 CFR 73.1200. This is an administrative change to update the Technical Bases Document references to the new regulatory requirement section. This change does not require prior NRC approval and does not decrease the effectiveness of the Emergency Plan and the Emergency Action Level Technical Bases.

ATTACHMENT 2 Serial No.: 25-102 Docket Nos.: 50-280/281 72-2/55 Surry Power Station Emergency Action Level Technical Basis Document Change 10 CFR 50.54(q)(5) Summary DOMINION ENERGY VIRGINIA (VIRGINIA ELECTRIC AND POWER COMPANY)

SURRY POWER STATION UNITS 1 AND 2 SURRY INDEPENDENT SPENT FUEL STORAGE INSTALLATION

Serial No.: 25-102 Docket Nos.: 50-280/281 72-2/55 Page 1 of 1 Surry Power Station Emergency Plan Change, 10 CFR 50.54(g)(5) Summary On March 18, 2025, the Surry Emergency Action Level Technical Bases Document (SEAL TBD) Revision 9 was implemented, incorporating changes authorized under 10 GFR 50.54(q), as described below.

These changes are editorial to update the SEAL TBD references to the new security regulatory requirement number and Emergency Plan Implementing Procedures (EPIPs) that were superseded by Controlled Supporting Documents (GSDs). These administrative changes do not require prior NRG approval and do not decrease the effectiveness of the Emergency Plan and the Emergency Action Level Technical Bases.

o The NRC revised the requirements for physical security event notifications and added two new notification requirements associated with imminent or actual hostile acts and possession of enhanced weapons. The new regulation replaces 10 GFR 73.71 with requirements moved to 10 GFR 73.1200 that simplify and reorganize existing physical security event notification requirements into several timeliness categories (e.g., 15-minute, 1-hour, 4-hour, and 8-hour notifications).

Surry Emergency Action Levels HU1.1, HA1.1, and HS1.1 are unaffected by this regulation change. The reference to the regulation contained in the SEAL TBD for HU1.1, HA1.1 and HS1.1 was changed from 10 GFR 73.71 to 10 CFR 73.1200.

This administrative change does not require prior NRG approval and does not decrease the effectiveness of the Emergency Plan and the Emergency Action Level Technical Bases.

o The SEAL TBD was revised to replace references to site specific EPIPs with references to fleet GSDs. References to EPIP-4.03 and EPIP-4.34 on pages 38, 42, 46, 47, 48, 52 and 53 of the SEAL TBD have been changed to EP-AA-GSD-403 and EP-AA-GSD-434. This administrative change does not require prior NRG approval and does not decrease the effectiveness of the Emergency Plan and the Emergency Action Level Technical Bases.