Form 2.1-1 Examination Preparation Checklist Facility: ____ James A. FitzPatrick ____________
Date of Examination: __02/17/2025___
Developed by: Written:
Facility NRC
//
Operating:
Facility NRC Target Date*
Task Description Chief Examiners Initials
-240 1.
Examination administration date confirmed (A.1-5). For NRC-prepared examinations, arrangements are made for the facility licensee to submit reference materials (B.4, C.4.g and F).
MPP
-210 2.
NRC examiners and facility licensee contact assigned (B.1 and C.1-3).
MPP
-210 3.
Facility licensee contact briefed on examination security and other requirements (D.4). As applicable, the facility licensee contact submits to the NRC any prescreened K/As for elimination from the written examination outline, with a description of the facility licensees prescreening process (ES-4.1 A.1.a and ES-4.1 B.2).
MPP
-210 4.
Reference material due for NRC-prepared examinations (F).
N/A
-210 5.
Examination kick-off call held (C.4). The NRC sends the corporate notification letter (A.5).
MPP
-195 6.
Written examination outline developed by the NRC and sent to the facility licensee contact (must be on the examination security agreement) (B.2, ES-4.1 A.1.b and ES-4.1 A.2.a).
MPP
-150 7.
Operating test outlines and checklists due: Forms 1.3-1, 2.3-1, 3.2-1, 3.2-2, 3.3-1, and 3.4-1, as applicable (B.6). Facility licensee provides a draft operating test administration schedule to the NRC (B.18).
MPP
-136 8.
Operating test outlines reviewed by the NRC and feedback provided to the facility licensee (ES-2.3).
MPP
-100 9.
NRC-prepared examinations approved by the NRC supervisor and forwarded for facility licensee review (ES-2.3).
MPP
-75
- 10. Proposed examinations (written, JPMs, and scenarios, as applicable) and outline forms; quality checklists and supporting documentation (including Forms 2.3-2 and 2.3-4 and any Form 2.3-1, 1.3-1, and 3.4-1 updates); and reference materials due.
MPP
-60
- 11. Preliminary waiver/excusal requests due (ES-2.2 E.1).
MPP
-50
- 12. Written examination and operating test reviews completed (ES-2.3). The NRC supervisors authorization to proceed with the facility review granted (ES-2.3 D).
MPP
-50
- 13. Examination review results discussed between the NRC and the facility licensee (B.14).
MPP
-35
- 14. Examination preparatory week conducted by the NRC and the facility licensee (I).
MPP
-30
- 15. Preliminary license applications, including any waiver/excusal requests, due (ES-2-2 C.1).
MPP
-14
- 16. Final license applications, including any waiver/excusal requests, due and Form 2.2-1 prepared (ES-2.2 C and E).
MPP
-7
- 17. Written examinations and operating tests approved by the NRC supervisor (C.9)
MPP
-7
- 18. Facility licensee management feedback on the examination requested by the NRC supervisor (C.10).
MPP
-7
- 19. Final applications reviewed; 10% of applications audited to confirm qualifications/eligibility (ES-2.2 G); and examination approval letter (Letter 2.3-1) and waiver/excusal letters sent.
MPP
-7
- 20. Written examination administration guidelines reviewed with the facility licensee (D.14).
MPP
-7
- 21. Approved scenarios and job performance measures distributed to NRC examiners (D.12).
MPP
- Target dates are based on facility licensee-prepared examinations and the examination date identified in the corporate notification letter. These dates are for planning purposes and may be adjusted in coordination with the facility licensee.
Form 3.4-1 Events and Evolutions Checklist Facility: Fitzpatrick Date of Exam: Feb 2025 Operating Test No.: 23-1 A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios 1
2 3
T O
T A
L M
I N
I M
U M(*)
CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
R I
U I1 RX 0
1 1
0 NOR 1
1 2
1 1
1 I/C 4,5,6,8, 9
4,5,6 8
4 4
2 MAJ 7
7 2
2 2
1 Man. Ctrl 5,7 2
1 1
0 TS 3,5 2
0 2
2 I2/I4 RX 2
1 1
1 0
NOR 1
1 1
1 1
I/C 4,5,6,9 3,4,5,6
,8,9 10 4
4 2
MAJ 7
7 2
2 2
1 Man Ctrl 7
1 1
1 0
TS 4,5 2
0 2
2 I3 RX 0
1 1
0 NOR 1
1 1
3 1
1 1
I/C 4,5,6,8, 9
4,5,6 3,4,5,6, 7,9 14 4
4 2
MAJ 7
7 8
3 2
2 1
Man Ctrl 5,7 2
1 1
0 TS 3,5 3,5 4
0 2
2 I5 RX 2
1 1
1 0
NOR 1
1 2
1 1
1 I/C 4,5,6,8, 9
3,4,5,6
,8,9 3,6,7 14 4
4 2
MAJ 7
7 8
3 2
2 1
Man Ctrl 6
1 1
1 0
TS 3,5 4,5 4
0 2
2
A P
P L
I C
A N
T E
V E
N T
T Y
P E
Scenarios 1
2 3
T O
T A
L M
I N
I M
U M(*)
CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
R I
U R1/R2 RX 2
1 1
1 0
NOR 1
1 1
1 1
I/C 4,5,6,8 3,6,8,9 8
4 4
2 MAJ 7
7 2
2 2
1 Man Ctrl 8
8,9 3
1 1
0 TS 0
0 2
2 R3 RX 2
1 1
1 0
NOR 1
1 1
1 1
I/C 4,5,6,9 4,5,6 7
4 4
2 MAJ 7
7 2
2 2
1 Man. Ctrl 7
5,7 3
1 1
0 TS 0
0 2
2 R4 RX 2
1 1
1 0
NOR 1
1 2
1 1
1 I/C 4,5,6,8 3,6,8,9 4,5,6,7,9 13 4
4 2
MAJ 7
7 8
3 2
2 1
Man Ctrl 8
8,9 4,5,9 6
1 1
0 TS 0
0 2
2 Form 3.4-1 Instructions for the Events and Evolutions Checklist
- 1.
Mark the applicant license level for each simulator operating test number.
- 2.
For the set of scenario columns, fill in the associated event number from Form 3.3-1, Scenario Outline, to show the specific event types being used for the applicant while in the assigned crew position for that scenario.
- Minimums are subject to the instructions in Section C.2, License Level Criteria.
KEY: RX = Reactivity Manipulation; NOR = Normal Evolution; I/C = Instrument/Component Failure; MAJ = Major Transient; Man. Ctrl = Manual Control of Automatic Function; TS = Technical Specification Evaluation; RO = Reactor Operator; SRO-I or I = Instant Senior Reactor Operator; SRO-U or U = Upgrade Senior Reactor Operator; SRO = Senior Reactor Operator; ATC = At the Controls; and BOP = Balance of Plan
A P
P L
I C
A N
T E
V E
N T
T Y
P E
Scenarios 4 (spare)
T O
T A
L M
I N
I M
U M(*)
CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
R I
U N/A RX 2
1 1
0 NOR 1
1 1
1 1
I/C 3,4,5,6, 8,9 3,6,8 4,5,6,8, 9
4 4
2 MAJ 7
7 7
2 2
1 Man Ctrl 4,5 1
1 0
TS 3,5 0
2 2