ML25097A062
| ML25097A062 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 04/07/2025 |
| From: | Marshall T Tennessee Valley Authority |
| To: | Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML25097A062 (1) | |
Text
Sequoyah Nuclear Plant, Post Office Box 2000, Soddy Daisy, Tennessee 37384 April 7, 2025 10 CFR 50.54(q) 10 CFR 72.44(f)
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Sequoyah Nuclear Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327, 50-328, and 72-034
Subject:
Emergency Plan Implementing Procedure Revisions In accordance with the requirements of 10 CFR 50.54(q) and 10 CFR 72.44(f), the Tennessee Valley Authority is submitting a description of changes to the Sequoyah Nuclear Plant (SQN)
Radiological Emergency Plan. The affected documents, and current revision level, are the SQN Emergency Plan Implementing Procedures (EPIPs) listed below.
EPIP Revision Title Effective Date(s) 2 44 Notification of Unusual Event March 17, 2025 3
46 Alert March 17, 2025 4
48 Site Area Emergency March 17, 2025 5
61 General Emergency March 17, 2025 The above referenced revisions were evaluated in accordance with 10 CFR 50.54(q)(3) and 10 CFR 72.44(f). It was determined that the changes do not reduce the effectiveness of the Emergency Plan. Details of the revisions are included in the enclosure.
There are no new regulatory commitments contained in this letter. Should you have any questions concerning this submittal, please contact Mr. Paul Gain, Site Emergency Preparedness Manager, at (423) 843-7088.
Respectfully, Thomas B. Marshall Site Vice President Sequoyah Nuclear Plant
U.S. Nuclear Regulatory Commission Page 2 April 7, 2025
Enclosure:
SQN Units 1 & 2 Description of Revision/Change cc:
NRC Regional Administrator +/- Region II NRC Senior Resident Inspector +/- Sequoyah Nuclear Plant NRC Director +/- Division of Fuel Management, NMSS
ENCLOSURE: SQN UNITS 1 & 2 DESCRIPTION OF REVISION/CHANGE EPIP-2, Revision 44 Updated references from Vaporstream to Electronic Notifications System to align with the Radiological Emergency Plan (REP) Generic.
Removed Attachment 10, Vaporstream Guide, and any references to the guide.
EPIP-3, Revision 46 Updated references from Vaporstream to Electronic Notifications System.
Removed Attachment 9, Vaporstream Guide.
EPIP-4, Revision 48 Updated references from Vaporstream to Electronic Notifications System to align with the REP Generic.
Removed Attachment 9, Vaporstream Guide.
EPIP-5, Revision 61 Updated references from Vaporstream to Electronic Notifications System to align with the REP Generic.
Removed Attachment 11, Vaporstream Guide.