Enclosure 2 - ER Submittal Section Status Page 1 of 19
Chapter Number Change in January 2025 ER Submittal Change in March 2025 ER Submittal No Change Comments Chapter 1 1.0 Editorial change 1.1 Updated Xe-100 customers 1.2 1.3 Updated key dates and target production capacity for 2 process buildings, added uranyl nitrate 1.3.1, 1.3.1.1, 1.3.1.2 1.3.1.3 Editorial change 1.3.2 1.3.2.1 Updated target production capacity for 2 process buildings, added uranyl nitrate Figure 1.3-1 Figure 1.3-2 Figure 1.3-3 Updated to reflect 2 process buildings and current site plan 1.4 Table 1.4-1 Chapter 1 RAI-10, updated status entries to current Table 1.4-2 Updated status entries to current, clarified TRISO-X informal consultations versus NRC formal consultations Appendix 1A Added regulatory correspondence after Sept. 2022 Chapter 2 Acronyms /
Abbreviations 2.1 2.1.1 Editorial changes 2.1.2 2.1.2.1 2.1.2.1.1
- ER Submittal Section Status Page 2 of 19
Chapter Number Change in January 2025 ER Submittal Change in March 2025 ER Submittal No Change Comments 2.1.2.1.1.1 2.1.2.1.1.2 Updated to reflect 2 process buildings 2.1.2.1.1.3 Updated to current design 2.1.2.1.1.4 2.1.2.1.1.4.1 Updated to current design 2.1.2.1.1.4.2 2.1.2.1.1.5 2.1.2.1.1.6.1 2.1.2.1.1.6 Editorial change 2.1.2.1.1.6.2 Editorial change 2.1.2.1.1.6.2.1 2.1.2.1.1.6.2.2 2.1.2.1.1.7 2.1.2.1.1.7.1 2.1.2.1.1.7.1.1 2.1.2.1.1.7.1.1 Editorial Change in January submittal.
Update to current design in March submittal.
2.1.2.1.1.7.1.2 Update to current design 2.1.2.1.1.7.2 Update to current design 2.1.2.1.1.8 RAI ER-WM-3 2.1.2.1.1.8.1 2.1.2.1.1.8.2 2.1.2.1.1.8.3 2.1.2.1.1.9 (including all subsections) 2.1.2.1.1.10 (including all subsections) 2.1.2.1.1.11 RAI ER-WM-4 2.1.2.1.2 2.1.2.1.2 Updated to reflect 2 process buildings in January submittal.
Editorial change in March submittal.
2.1.2.1.3 Updated to reflect 2 process buildings 2.1.2.1.3.1 Added uranyl nitrate receipt and processing
- ER Submittal Section Status Page 3 of 19
Chapter Number Change in January 2025 ER Submittal Change in March 2025 ER Submittal No Change Comments 2.1.2.1.3.2 Added uranium oxide receipt and storage 2.1.2.1.3.3 2.1.2.1.3.4 2.1.2.1.3.5 2.1.2.1.3.6 2.1.2.1.3.7 2.1.2.1.3.8 2.1.2.1.3.9 Updated to current design 2.1.2.1.3.10 2.1.2.1.3.11 Updated to current design 2.1.2.1.3.12 2.1.2.1.3.13 2.1.2.1.3.14 Added uranyl nitrate 2.1.2.1.3.15 2.1.2.1.4 2.1.2.2 2.1.3 2.1.3.1 Updated to reflect business drivers for 2 process buildings Tables 2.1-1a through 1e Table 2.1-2 RAI 3 ER-WM-1, updated to reflect 2 process buildings Table 2.1-3 Updated to reflect 2 process buildings Table 2.1-4 Table 2.1-5 Figure 2.1-1 Updated to reflect 2 process buildings and current site plan Figure 2.1-2 Updated to reflect 2 process buildings and to current design 2.2.1 RAI 2-1 ER-ALT-1 2.2.2 Table 2.2-1 RAI 2-1 ER-ALT-1 2.3 (including all subsections)
Clarification, and updates for other actions nearby
- ER Submittal Section Status Page 4 of 19
Chapter Number Change in January 2025 ER Submittal Change in March 2025 ER Submittal No Change Comments Table 2.3-1 Updates for other actions nearby Figure 2.3-1 2.4 Editorial change Table 2.4-1 Chapter 3 Acronyms and Abbreviations Table 3.1 3.1.1 through 3.1.7 3.1.8 Updated to reflect completion of rezoning Table 3.1-1 Table 3.1-2 Figures 3.1-1 through 8 3.2 3.2.1 3.2.2 RAI 2-1 ER-TR-1 Table 3.2-1 Editorial change Figures 3.2-1 through 3 3.3 3.3.1 (including all subsections) 3.3.2 Hydrology RAI-1 3.3.3 3.3.3.1 3.3.3.2 Hydrology RAI-1 3.3.3.3 3.3.4 3.3.4.1 3.3.4.2 Geotech RAI-4 3.3.5 Figures 3.3.1-1 through 3.3.1-3 Figures 3.3.3-1 through 4 Obs. ER-GW-1 RAI 2-1 ER-GS-1 RAI 2-1 ER-GS-2 Figure 3.3.3-5 3.4 3.4.1 3.4.1.1.2 3.4.1.1 (including all subsections)
Editorial change 3.4.1.2 3.4.1.2.1 Hydrology RAI-1 3.4.1.2.1.1 Hydrology RAI-6
- ER Submittal Section Status Page 5 of 19
Chapter Number Change in January 2025 ER Submittal Change in March 2025 ER Submittal No Change Comments 3.4.1.2.1.2 3.4.1.2.1.3 3.4.1.2.1.4 3.4.2.3.1 3.4.2 (including all subsections)
Editorial change 3.4.3 3.4.4 Tables 3.4.1-1 through 7 Tables 3.4.2-1 through 7 Table 3.4.4-1 Figures 3.4.2-1 through 4 Figures 3.4.1-5 and 6 Hydrology RAI-6 Figures 3.4.2-1 through 3 Figures 3.4.3-1 through 3 Figures 3.4.4-1 and 2 3.5 (including all subsections)
Tables 3.5.2-1 through 5 Tables 3.5.3-1 and 2 Tables 3.5.5-1 and 2 Figures 3.5-1 and 2
Figure 3.5.4-1 3.6 3.6.1 3.6.1.1 through 3.6.1.3 3.6.1.4 3.6.1.4.1 through 3.6.1.4.7 3.6.1.4.7.1 Editorial change 3.6.1.4.7.2 3.6.1.5 (including all subsections) 3.6.2 (including all subsections)
Table 3.6-1 Editorial change Tables 3.6-2 through 52 Table 3.6-21
- ER Submittal Section Status Page 6 of 19
Chapter Number Change in January 2025 ER Submittal Change in March 2025 ER Submittal No Change Comments Figures 3.6-1 through 20 3.7 (including all subsections)
Table 3.7.1-1 Figure 3.7.1-1 3.8 3.8.1 through 3.8.4 3.8.5 Updated to current status Figure 3.8-1 3.9 3.9.1 through 3.9.7 3.9.8 Updated to reflect completion of rezoning 3.9.9 Updated to current status Table 3.9.10-1 Figure 3.9.1-1 Figure 3.9.3-1 and 2
3.10 3.10.1 through 3.10.2 3.10.3.1 3.10.3.2 Chapter 1 RAI-5 3.10.3.3 through 5 3.10.3.6 Updated to current status Tables 3.10-1 through 5 Tables 3.10.2-1 through 6 Table 3.10.2-7 Editorial change Tables 3.10.3-1 through 7 Figures 3.10.1-1 through 4 Figure 3.10.3-1 Chapter 1 RAI-5 3.11 (including all subsections)
Tables 3.11-1 through 3 3.12 (including all subsections)
Chapter 4
- ER Submittal Section Status Page 7 of 19
Chapter Number Change in January 2025 ER Submittal Change in March 2025 ER Submittal No Change Comments Acronyms and Abbreviations Table 4.1 4.1.1 4.1.2 4.1.2.1 Updated to reflect completion of rezoning 4.1.2.2 4.1.2.3 Editorial change 4.1.2.4 through 4.1.2.8 4.1.2.9 Updated expected construction timing 4.1.3 Updated other actions nearby 4.2 Editorial change 4.2.1 4.2.2 4.2.2.1 Editorial change 4.2.2.2 4.2.2.3 Editorial change 4.2.2.4 4.2.2.4 Updated expected construction timing and to reflect 2 process buildings 4.2.2.5 4.2.2.5 Updated to reflect 2 process buildings 4.2.2.6 Updated to reflect 2 process buildings 4.2.3 4.2.3.1 Added low enriched uranium and uranyl nitrate 4.2.3.2 Updated transportation related locations 4.2.3.3 4.2.3.3 Updated to current design and added uranyl nitrate in January submittal.
Updated shipments of LEU and HALEU oxide and fabricated fuel in March submittal.
4.2.3.4 Updated incident free transportation
- ER Submittal Section Status Page 8 of 19
Chapter Number Change in January 2025 ER Submittal Change in March 2025 ER Submittal No Change Comments dose transportation 4.2.4 4.2.4 Updated other actions nearby in January submittal.
Updated incident free transportation doses in March submittal.
Table 4.2.2-1 Updated to reflect 2 process buildings Table 4.2.2-2 Updated to reflect 2 process buildings Table 4.2.3-1 Updated incident free transportation doses 4.3 4.3.1 4.3.1.1 4.3.1.2 Updated to reflect current site plan 4.3.1.2.1 Editorial change 4.3.1.2.2 4.3.1.2.3 4.3.1.3 4.3.1.4 Updated other actions nearby 4.3.2 4.3.2.1 4.3.2.2 4.3.2.2.1 Hydrology RAI-1 4.3.2.2.2 4.3.2.2.2.1 Editorial change 4.3.2.2.3 4.3.2.3 4.3.2.4 Updated other actions nearby 4.4 4.4.1 4.4.1.1 4.4.1.2 4.4.1.2.1 RAI ER-TES-6 4.4.1.2.2 RAI ER-TES-6 4.4.1.2.3 4.4.1.3 4.4.1.4 Updated other actions nearby 4.4.2 4.4.2.1
- ER Submittal Section Status Page 9 of 19
Chapter Number Change in January 2025 ER Submittal Change in March 2025 ER Submittal No Change Comments 4.4.2.2 4.4.2.2.1 4.4.2.2.1.1 Updated to reflect 2 process buildings and the current site plan 4.4.2.2.1.2 Updated to current design 4.4.2.2.1.3 4.4.2.2.1.4 Updated other actions nearby 4.4.2.2.2 4.4.2.2.3 4.4.2.2.3.1 RAI ER-TES-6 4.4.2.2.3.2 RAI ER-TES-6 Hydrology RAI-4 4.4.2.2.3.3 4.4.2.2.3.4 4.4.2.2.3.5 Updated other actions nearby 4.4.3 4.4.3.1 4.4.3.2 Editorial change 4.4.3.2.1 Updated other actions nearby 4.4.4 4.4.4.1 Editorial change 4.4.4.2 (including all subsections) 4.4.4.3 4.4.4.4 Updated other actions nearby Table 4.4.2-1 Updated to current design Table 4.4.2-2 Updated to current design 4.5.1 4.5.2.1 4.5.2.2.1 Updated to current design 4.5.2.2.2 and 4.5.2.2.3 4.5.2.3 through 4.5.2.5 4.5.3 and 4.5.4 4.5.5 Updated other actions nearby 4.6 RAI 2-1 ER-AIR-1 4.6.1 Editorial change 4.6.2 Editorial change 4.6.3
- ER Submittal Section Status Page 10 of 19
Chapter Number Change in January 2025 ER Submittal Change in March 2025 ER Submittal No Change Comments 4.6.4 Updated to reflect 2 process buildings 4.6.4.1 Updated to reflect 2 process buildings 4.6.4.2 4.6.4.2 Updated to reflect 2 process buildings in January submittal.
Editorial change in March submittal.
4.6.4.2.1 Editorial change 4.6.4.2.2 4.6.4.2.2 Editorial change in January submittal.
Refer to TX-1 and TX-2 in March submittal.
4.6.4.2.3 4.6.4.2.3 Editorial change in January submittal.
Refer to TX-1 and TX-2 in March submittal.
4.6.4.2.4 4.6.4.3 4.6.4.4 4.6.4.4.1 4.6.4.4.2 Editorial change 4.6.4.4.3 4.6.4.4.4 4.6.5 4.6.5 Updated other actions nearby in January submittal.
Revised wording about cumulative impact of proposed action in March submittal.
Table 4.6-1 Updated to reflect 2 process buildings Table 4.6-2 Updated to reflect 2 process buildings Table 4.6-3 Update of annual emissions to current design and to reflect 2 process buildings Figure 4.6-1 Updated to reflect current site plan
- ER Submittal Section Status Page 11 of 19
Chapter Number Change in January 2025 ER Submittal Change in March 2025 ER Submittal No Change Comments and 2 process buildings 4.7 4.7.1 4.7.2 4.7.2.1 4.7.2.1 Updated to reflect 2 process buildings in January submittal.
Editorial updates in March submittal.
4.7.2.1.1 4.7.2.1.2 Updated to reflect current site plan 4.7.2.1.3 4.7.2.2 4.7.2.2.1 4.7.2.2.1 Editorial change in January submittal.
Update of noise sources for TX-1 and TX-2 for March submittal.
4.7.2.2.2 Update of community impact of noise sources.
4.7.2.2.3 Update for backup generator testing eliminating loss of power scenario.
4.7.2.3 4.7.2.4 Table 4.7.2-1 Table 4.7.2-2 through 4 Update for noise sources and levels. Table 4.7.2.2-4 deleted for elimination of loss of power scenario.
Figure 4.7.2-1 Figure 4.7.2-1 Updated to reflect 2 process buildings and current site plan 4.7.3 4.7.3 Updated other actions nearby for January submittal.
Editorial changes for March submittal.
4.8 4.8 Added NRC formal consultation result for January
- ER Submittal Section Status Page 12 of 19
Chapter Number Change in January 2025 ER Submittal Change in March 2025 ER Submittal No Change Comments submittal. Editorial change for March submittal.
4.8.1 4.8.2 Editorial change 4.8.2.1 Editorial change 4.8.2.2 4.8.2.3 4.8.2.4 Clarification 4.8.2.5 Figure 4.8.2-1 4.9 4.9.1 Editorial change 4.9.2 Updated to reflect 2 process buildings 4.9.2.1 4.9.2.2 4.9.2.2.1 Updated to reflect 2 process buildings visual impacts.
4.9.2.2.1.1 Updated to reflect 2 process buildings visual impacts.
4.9.2.2.1.2 4.9.2.2.1.2 Deleted the meteorological tower because its height is bounded by the HVAC vent stacks in January submittal. Editorial change in March submittal.
4.9.2.2.1.3 Updated other actions nearby 4.9.2.2.1.4 4.9.2.2.1.5 4.9.2.2.1.6 Updated to reflect completion of rezoning 4.9.2.2.2 4.9.2.2.3 4.9.2.2.4 4.9.2.3 4.9.3 4.9.4 4.9.4 Updated other actions nearby for January submittal.
Editorial change
- ER Submittal Section Status Page 13 of 19
Chapter Number Change in January 2025 ER Submittal Change in March 2025 ER Submittal No Change Comments for March submittal.
Figure 4.9.2-1 Updated to reflect 2 process buildings and current site plan Figure 4.9.2-2 (Sheets 1 to 4)
Updated to reflect 2 process buildings Figure 4.9.2-3 Figure 4.9.2-3 Updated to reflect 2 process buildings and current site plan for January submittal. Update of number of vent stacks for March submittal.
4.10 4.10.1 4.10.2 Updated to reflect 2 process buildings 4.10.2.1 Updated to reflect 2 process buildings 4.10.2.1.1 Updated to reflect 2 process buildings 4.10.2.1.2 Updated to reflect 2 process buildings 4.10.2.1.3 Updated to reflect 2 process buildings 4.10.2.2 Updated to reflect 2 process buildings 4.10.2.2.1 Updated to reflect 2 process buildings 4.10.2.2.2 Updated to reflect 2 process buildings 4.10.2.2.3 4.10.2.2.3.1 Updated to reflect 2 process buildings 4.10.2.2.3.2 Updated to reflect 2 process buildings
- ER Submittal Section Status Page 14 of 19
Chapter Number Change in January 2025 ER Submittal Change in March 2025 ER Submittal No Change Comments 4.10.2.2.3.3 Updated to reflect 2 process buildings 4.10.2.2.3.4 Updated to reflect 2 process buildings 4.10.2.2.3.5 Update to reflect 2 process buildings water demand and waste discharge.
4.10.2.2.3.6 Updated to reflect 2 process buildings 4.10.2.3 Updated timing of decommissioning 4.10.2.3.1 4.10.2.3.2 Updated cost estimate based on Decommissioning Funding Plan revision 4.10.2.3.3 4.10.3 Updated other actions nearby Tables 4.10.2-1 through 4.10.2-7 Updated to reflect 2 process buildings Table 4.10.3-1 Updated to reflect 2 process buildings 4.11 4.11.1 4.11.2 4.11.2.1 Updated timing of decommissioning 4.11.2.2 (including all subsections)
Updated to reflect 2 process buildings 4.11.3 4.11.4 Updated other actions nearby 4.12 4.12.1 4.12.2 4.12.2.1 4.12.2.1.1 Chapter 1 RAI-5 4.12.2.1.2 4.12.2.1.2.1 4.12.2.1.2.2 Updated to reflect 2 process buildings 4.12.2.1.3
- ER Submittal Section Status Page 15 of 19
Chapter Number Change in January 2025 ER Submittal Change in March 2025 ER Submittal No Change Comments 4.12.2.1.3.1 4.12.2.1.3.2 Updated to reflect 2 process buildings 4.12.2.1.4 4.12.2.1.5 4.12.2.1.6 4.12.2.1.6.1 Updated other actions nearby 4.12.2.1.6.2 4.12.2.2 4.12.2.2.1 4.12.2.2.1 Chapter 9 RAI-1 in January submittal.
Editorial change in March submittal.
4.12.2.2.2 4.12.2.2.2.1 4.12.2.2.2.1 Chapter 9 RAI-1 Work force for construction worker dose revised to annual average and collective dose.
4.12.2.2.2.2 Chapter 9 RAI-1 4.12.2.2.2.3 4.12.2.2.3 4.12.2.3 Editorial change 4.12.2.3.1 Updated to current design and ISA results 4.12.2.3.2 Updated to current design and ISA results 4.12.2.3.2.1 4.12.2.3.2.2 Updated to current design and ISA results 4.12.2.3.3 Updated to current design and ISA results 4.12.2.3.3.1 Updated to current design and ISA results 4.12.2.3.3.2 Tables 4.12.2-1 through 3 Updated to current design, Chapter 9
RAI-2
Tables 4.12.2-4 through 7 Table 4.12.2-8 through 11 Updated to reflect 2 process buildings
- ER Submittal Section Status Page 16 of 19
Chapter Number Change in January 2025 ER Submittal Change in March 2025 ER Submittal No Change Comments Table 4.12.2-12 Figure 4.12.2-1 Chapter 1 RAI-5 4.13 (including all subsections)
RAI ER-WM-1 RAI ER-WM-2 RAI ER-WM-4 Table 4.13-1 through 3 RAI ER-WM-2 RAI 3 ER-WM-1 Chapter 5 Acronyms and Abbreviations Table 5.0 5.1 Editorial change 5.2 RAI 2-1 ER-TR-1 5.3 Editorial change 5.4 5.4.1 Editorial change 5.4.2 5.4.3 Clarification 5.4.4 5.4.5 5.5 5.6 5.6 Clarification and editorial change for January submittal.
Update for greenhouse gas emissions.
5.7 Updated to add backup generator testing and removal of loss of power; 5.8 5.9 5.10 5.11 5.12 (including all subsections) 5.13 Editorial, RAI ER-WM-4 Chapter 6 6.1 6.1.1 Chapter 9 RAI-1 6.1.1.1 Updated to reflect 2 process buildings
- ER Submittal Section Status Page 17 of 19
Chapter Number Change in January 2025 ER Submittal Change in March 2025 ER Submittal No Change Comments 6.1.1.2 Updated to reflect 2 process buildings 6.1.2 Chapter 9 RAI-1 Table 6.1.2-1 Chapter 9 RAI-1 Figure 6.1.2-1 Chapter 9 RAI-1 6.2 6.2.1 6.2.1.1 Chapter 9 RAI-4, updated to current site plan 6.2.1.1.1 6.2.1.1.2 6.2.1.2 Table 6.2.2-1 Deleted well from sampling program due to lack of water Table 6.2.2-2 Updated surface water sampling locations to coincide with the 3 permitted outfalls from the site during operations 6.2.2 6.2.2.1 6.2.2.2 Clarification 6.2.2.2.1 6.2.2.2.2 Clarification 6.2.2.3 Editorial 6.2.2.3.1 through 6.2.2.3.2 6.2.2.3.3 Updated surface water sampling locations to coincide with the 3 permitted outfalls from the site during operations 6.3 (including all subsections) 6.4 (including all subsections)
Chapter 7 7.0 Updated to reflect 2 process buildings 7.1 Updated to reflect 2 process buildings 7.1.1
- ER Submittal Section Status Page 18 of 19
Chapter Number Change in January 2025 ER Submittal Change in March 2025 ER Submittal No Change Comments 7.1.1.1 Editorial change 7.1.1.2 through 7.1.1.8 Updated to reflect 2 process buildings 7.1.1.9 and 7.1.1.10 7.1.1.11 Updated to reflect 2 process buildings 7.1.1.12 and 7.1.1.13 7.1.1.14 and 7.1.1.5 Updated to reflect 2 process buildings 7.1.2 Updated to reflect 2 process buildings 7.1.3 Table 7.1-1 Updated to reflect 2 process buildings 7.2 and 7.2.1 Editorial change 7.2.2, 7.2.3, 7.2.3.1 7.2.3.2 Updated to reflect 2 process buildings 7.2.3.3 7.2.4 Editorial change Chapter 8 8.0 8.1 8.2 8.2.1 8.2.2 Updated to current design 8.3 8.4 Editorial change Chapter 9 9.1 9.2 9.2.1 9.2.2 9.2.3 Updated other actions nearby 9.2.4 9.3 9.3.1 Editorial change
- ER Submittal Section Status Page 19 of 19
Chapter Number Change in January 2025 ER Submittal Change in March 2025 ER Submittal No Change Comments 9.3.2 through 9.3.8 9.3.9 Updated version of reference 9.3.10 through 9.3.12 9.4 9.4.1 9.4.2 Added RADTRAN reference 9.4.3 through 9.4.8 9.4.9 Updated other actions nearby 9.4.10 through 9.4.11 9.4.12 Updated to current design 9.5 (including all subsections) 9.6 (including all subsections) 9.7 (including all subsections) 9.8.1 9.8.2 9.8.3 Added reference 9.8.4 Chapter 10 Acronyms and Abbreviations Table 10.1 Updated company name change and editorial changes Table 10.1-1 Table 10.1-1 Updated contributors and editorial changes for January submittal.
Updated contributors for March submittal.