Submittal of Owners Activity Report (OAR-1) for D3R28
ML25078A202
Person / Time
Site: Dresden Constellation icon.png
Issue date: 03/18/2025
From: Joseph C
Constellation Energy Generation
To:
Office of Nuclear Reactor Regulation, Document Control Desk
Shared Package
ML25078A201 List:
References
SVPLTR 25-0018
Download: ML25078A202 (1)


Text

Constellation SVPL TR: #25-0018 March 18, 2025 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Dresden Nuclear Power Station, Unit 3 Renewed Facility Operating License No. DPR-25 NRC Docket No. 50-249 Dresden Nuclear Power Station 6500 North Dresden Road Morris, IL 60450

Subject:

Dresden Nuclear Power Station Unit 3 Owner's Activity Report (OAR-1) for D3R28 The Dresden Nuclear Power Station (DNPS) Unit 3 OAR-1 for D3R28 (Attachment 1) is submitted in accordance with the provisions in the 2019 Edition of the ASME Section XI, which has been incorporated by reference in 10 CGR 50.55a(a) and was approved by NRC staff for CEG implementation by letter No. ML23114A252. In accordance with the conditions set forth above, this OAR-1 form is being submitted within 120 days of the completion of the refueling outage.

This is the first refueling outage of the First Period of the Sixth 10-Year Interval lnservice Inspection (ISi) Program for DNPS Unit 3. Also, this is the first refueling outage conducted in the First Inspection Period of the Fourth 10-Year Interval Containment lnservice Inspection (GISI) Program for DNPS Unit 3.

Should you have any questions concerning this letter, please contact Daniel J. Murphy, Regulatory Assurance Manager, at (779) 231-7 443.

Respectfully,

~~ h__Q__

I(. Pci+e.(

PiCJM}

/1kv1tt~r-

.f(y e. J o.!,~ 4 Carolyne Joseph Site Vice President Dresden Nuclear Power Station