ML25076A145
| ML25076A145 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 03/17/2025 |
| From: | Sam Graves NRC/RGN-IV/DORS/EB2 |
| To: | Hansett P Entergy Operations |
| References | |
| IR 2025012 | |
| Download: ML25076A145 (5) | |
See also: IR 05000458/2025012
Text
March 17, 2025
Phil Hansett, Site Vice President
Entergy Operations, Inc.
River Bend Station
5485 U.S. Highway 61N
St. Francisville, LA 70775
SUBJECT:
RIVER BEND STATION - NOTIFICATION OF POST-APPROVAL SITE
INSPECTION FOR LICENSE RENEWAL AND REQUEST FOR INFORMATION
Dear Phil Hansett:
During the weeks of May 5, 2025, and May 19, 2025, the U.S. Nuclear Regulatory Commission
(NRC) will begin a Post-Approval Site Inspection, Phase 2, for License Renewal for your facility.
Four inspectors will perform this two-week inspection in accordance with NRC Inspection
Procedure 71003. This inspection focuses on activities associated with license renewal:
implementation of aging management programs, regulatory commitments, as well as any tests
or inspections of structures, systems, or components.
To minimize the inspection impact on the site and to ensure a productive inspection for both
parties, we have enclosed a request for information needed for the inspection. It is important
that all these documents are up to date and complete to minimize the number of additional
documents requested during the preparation and/or the on-site portions of the inspection. This
information should be made available either in an online repository (preferred) or digital media
(CD/DVD) and delivered/available to the regional office no later than the dates shown below.
The information request has two groups:
The first group lists information necessary for our initial inspection scoping and in-office
preparation activities. During the in-office preparation activities, the team will identify as
much as possible the information and activities to be reviewed during the inspection.
This information should be provided to the lead inspector by April 14, 2025.
The second group includes additional information required for the team to review the
selected activities. This information should be available to the team on May 5, 2025. It is
also requested that corrective action documents and/or questions developed during the
inspection be provided to the lead inspector as the documents are generated. If using an
online document repository to communicate with the team it is recommended to create
two separate folders, one for corrective action documents created in response to the
teams questions and one for corrective action documents requested by the team.
P. Hansett
2
The schedule for the inspection is as follows:
Onsite Inspection Weeks: May 5 - 9, 2025, and
May 19 - 23, 2025
Paperwork Reduction Act Statement
This letter contains mandatory information collections that are subject to the Paperwork
Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB)
approved these information collections (approval number 3150-0011). Send comments
regarding this information collection to the Information Services Branch, Office of the Chief
Information Officer, Mail Stop: T6 A10M, U.S. Nuclear Regulatory Commission, Washington, DC
20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of
Information and Regulatory Affairs, NEOB-10202, (3150-0011) Office of Management and
Budget, Washington, DC 20503.
Public Protection Notification
The NRC may not conduct nor sponsor, and a person is not required to respond to, a request
for information or an information collection requirement unless the requesting document
displays a currently valid OMB control number.
This letter, its enclosure, and your response (if any) will be made available for public inspection
and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document
Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public
Inspections, Exemptions, Requests for Withholding.
Sincerely,
Sam Graves, Senior Reactor Inspector
Engineering Branch 2
Division of Operating Reactor Safety
Docket No. 05000458
License No. NPF-47
Enclosure:
1.
License Renewal Phase 2 Document Request
cc w/ encl: Distribution via LISTSERV
Signed by Graves, Samuel
on 03/17/25
SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword:
By: STG Yes No
Publicly Available Sensitive NRC-002
OFFICE
SRI:DORS:EB2
NAME
SGraves
SIGNATURE
/RA/
DATE
03/17/25
Enclosure
Enclosure 1
License Renewal Phase 2 Document Requests
Inspection Report: 05000458/2025012
Onsite Inspection Dates:
May 5 - 9, 2025 and
May 19 - 23, 2025
Inspection Procedure:
IP 71003 Post-Approval Site Inspection for License
Renewal Phase 2
The documents and information requested below should generally be made available to the
inspection team for the team's use both on-site and off-site. Electronic format is the preferred
media, preferably in a searchable format. Electronic media should contain descriptive names
and be indexed and hyperlinked to facilitate ease of use. Information in lists should contain
enough information to be easily understood by someone who has knowledge of light water
reactor technology. If electronic media is made available via an internet based remote document
management system, then the remote document access must allow inspectors to download,
save, and print the documents in the NRC's office. Electronic media on compact disc or paper
records (hard copy) are acceptable. At the end of the inspection, the documents in the team's
possession will not be retained.
This document request is based on typical documents that a generic plant might have. As such,
this document request is not meant to imply that any specific plant is required to have all of the
listed documents. In addition, your plant specific document titles may vary from the document
titles listed below. We also request that the information provided be sorted by the list below.
A.
Documents requested by April 14, 2025 (prior to on-site inspection)
1.
Provide an excel spreadsheet list of your license renewal commitments. Include the
completion status of each. For those not yet complete, please provide an estimated
completion date. If a commitment is not associated with an aging management program,
please leave that field blank.
2.
Provide an excel spreadsheet list of your aging management programs. Include the
completion status of each. For incomplete programs, please provide an estimated
completion date. For ongoing/recurring programs, please provide the most recent
inspection results.
3.
Provide copies of the program basis document for each aging management program,
and a listing with status of the tracking items for each. This information should contain
your license renewal commitments, associated aging management programs, closure
documentation, implementing documents/procedures, and any corrective action
documents (CRs). For those activities not yet complete, please provide an estimated
completion date.
4.
Provide current electronic copies of Appendix A of the Updated Final Safety Analysis
Report, technical specifications, technical specifications bases, and licensee-controlled
specifications/technical requirements manual (TRM).
2
5.
Provide copies of any internal/external self-assessments, gap analyses, and
associated corrective action documents generated in preparation for the inspection.
6.
A list of FSAR updates performed since the last license renewal inspection.
7.
A list of License Amendment Requests (LARs) submitted since the last license renewal
inspection.
8.
A list of license renewal commitment changes since the last license renewal inspection.
9.
A list of any documents associated with 10 CFR 54.37(b), if unique from requests #3 -
- 5 above.
B.
Documents requested for on-site inspection (May 5, 2025)
Contact information for selected inspection samples to facilitate inspector observations
and questions.
C.
Documents requested throughout the inspection
1.
Copies of any corrective action documents generated because of the teams questions
or queries during this inspection.
2.
Copies of the list of questions submitted by the team members and the status/resolution
of the information requested (provide daily during the inspection to each team member).
If you have questions regarding the information requested, please contact the lead inspector,
Shiattin Makor at 817-200-1507 or Shiattin.Makor@nrc.gov.
Inspector Contact Information:
Senior Reactor Inspector
817-200-1507
Shiattin.Makor@nrc.gov
Senior Reactor Inspector
817-200-1102
Samuel.Graves@nrc.gov
Andrew Saunders, P.E.
Reactor Inspector
817-200-1275
Andrew.Saunders@nrc.gov
Senior Reactor Systems Engineer
301-415-3353
Stephen.Campbell@nrc.gov
Mailing Address:
U.S. NRC, Region IV
Attn: First Last Name
1600 East Lamar Blvd.
Arlington, TX 76011-4511