ML25072A033
| ML25072A033 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 03/11/2025 |
| From: | Casey Smith Constellation Energy Generation |
| To: | Office of Nuclear Reactor Regulation, Document Control Desk |
| Shared Package | |
| ML25072A032 | List: |
| References | |
| TS 5.6.5 | |
| Download: ML25072A033 (1) | |
Text
Constellation~
Christopher J. Smith Plant Manager Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby. MD 20657 410-495-5205 Office 815*931 5902 Mobile Christopher sm1t1w, constellat1on.com March 11, 2025 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop Pl-37 One White Flint North 11555 Rockville Pike Rockville MD 20852-2738
Subject:
Calvert Cliffs Nuclear Power Plant, Unit No. 2 Renewed Facility Operating License No. DPR-69 NRC Docket No. 50-318 Core Operating Limits Report for Unit 2, Cycle 26, Revision 0 TS 5.6.5 Pursuant to Calvert Cliffs Nuclear Power Plant Technical Specification 5.6.5, the attached Core Operating Limits Report for Unit 2, Cycle 26, Revision 0 (Attachment 1), is provided for your records.
Please replace the Unit 2 Core Operating Limits Report in its entirety, with the attached Revision 0.
There are no regulatory commitments contained in this correspondence.
Should you have questions regarding this matter, please contact Mr. Larry D. Smith at (667) 313-6503.
Respectfully, Christopher J. Smith Plant Manager PFM/LDS/jj
Attachment:
(1)
Core Operating Limits Report for Unit 2, Cycle 26, Revision 0 cc:
(With Attachment)
NRC Project Manager, Calvert Cliffs NRC Regional Administrator, Region Sr. Resident Inspector, NRC S. Seaman, MD-DNR