Text

VIRGINIA ELECTRIC AND POWER COMPANY RlCHMOND, VIRGINIA 23261 March 10, 2025 Mark Miller, Acting Regional Administrator United States Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 Serial No.25-049 NAPS/RAP Docket Nos.

50-338 50-339 License Nos.

NPF-4 NPF-7 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION ENERGY VIRGINIA)

NORTH ANNA POWER STATION UNITS 1 AND 2 SUBMITTAL OF OPERATING TEST OUTLINE AND SUPPORTING REFERENCE MATERIALS

Dear Mr. Miller,

NRC letter dated January 15, 2025, North Anna Power Station - Notification of Licensed Operator Initial Examination, requested transmittal of the operating test outline and supporting reference materials identified on Form 2.1-1 (Examination Preparation Checklist) in section ES-2.1 by 03/07/2025. The proposed written and operating examinations, along with the supporting reference material will be due by 05/21/2025. The timely submittal will support the initial senior reactor operator test scheduled to be administered during the week of 08/03/2025. The written examination is scheduled to be administered on 08/13/2025.

This letter is to inform you that the initial license operating test outlines and Forms 1.3-1, 2.3-1, 3.2-1, 3.2-2, 3.3-1, 3.4-1 along with a draft operating test administrative schedule were transmitted to and received by Mr. Michael Donithan, NRC Chief Examiner, on 02/20/2025.

We request that the materials submitted to the NRC be withheld from public disclosure for 2 years after the operator examinations have been administered.

If you have any questions or require additional information, please contact Mr. Andrew Lee Brust at (540)-894-2413.

Lisa Hilbert Site Vice President Commitments:

None cc:

Mr. Matthew F. Endress - Chief, Region II Document Control Desk Senior Resident Inspector - North Anna Power Station