David Rhoades
Senior Vice President
Constellation Energy Generation, LLC
President and Chief Nuclear Officer (CNO)
Constellation Nuclear
4300 Winfield Road
Warrenville, IL 60555
SUBJECT:
CLINTON POWER STATION - REVISED REQUEST FOR INFORMATION
FOR NRC LICENSE RENEWAL INSPECTION: INSPECTION REPORT
Dear David Rhoades:
On April 1, 2024, the U.S. Nuclear Regulatory Commission issued a request for information letter
to support the performance of NRC Inspection Procedure 71002, License Renewal Inspection, at
Clinton Nuclear Power Plant. The inspection was originally scheduled to begin on
October 21, 2024. The NRC has, after discussion with your staff, rescheduled the inspection to
begin on June 9, 2025. This letter contains a revised request for information to support the
schedule change.
The inspection will evaluate Clintons initial license renewal program plans and implementation
to ensure they are consistent with the requirements of Title 10 of the Code of Federal
Regulations (10 CFR), Part 54, Requirements for the Renewal of Operating Licenses for
Nuclear Power Plants, and Clintons license renewal application. The inspection will include an
evaluation of aging management programs that are planned or in place. The inspection will also
include a review of information and documentation required by 10 CFR 54.
The inspection will include 2 onsite weeks and will consist of 5 NRC inspectors (including the
lead inspector). The current inspection schedule is as follows:
Preparation week:
June 2 - 6, 2025
Onsite weeks:
Week 1: June 9 - 13, 2025
Week 2: June 23 - 27, 2025
Experience with previous baseline inspections of similar depth and length has shown that this
type of inspection is extremely resource intensive, both for the NRC inspectors and the licensee
staff. To minimize the inspection impact on the site and to ensure a productive inspection for
both parties, we have enclosed a request for information.
It is important that all these documents are up-to-date and complete to minimize the number of
additional documents requested during the preparation and/or the onsite portions of the
February 27, 2025
D. Rhoades
2
inspection. Insofar as possible, this information should be provided electronically to the lead
inspector. The information request has been divided into three groups:
The first group of documents requested are those items needed to support our
in-office preparation activities. This set of documents should be provided to the lead
inspector by May 12, 2025. During the in-office preparation activities, the team may
identify additional information needed to support the inspection.
The second group includes supporting information to be provided throughout the onsite
inspection. Specifically, corrective action documents and answers to questions
developed during the inspection are requested to be provided as the documents are
generated.
In addition, the enclosure includes information and requests addressing inspection logistics.
The lead inspector for this inspection is Matthew Domke. We understand that our point of
contact for this inspection is Lydia Dworakowski of your organization. If there are any questions
about the inspection or the material requested in the enclosure, please contact the lead
inspector at (630)829-9562 or via email at Matthew.Domke@NRC.gov.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, Control
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget Control
Number.
This letter and its enclosure will be made available for public inspection and copying at
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
Senior Reactor Inspector
Engineering Reactor Projects Branch
Division of Operating Reactor Safety
Docket No. 05000461
License No. NPF-62
Enclosure:
License Renewal Inspection
Revised Request for Information
cc w/ encl: Distribution via LISTSERV
Signed by Domke, Matthew
on 02/27/25
D. Rhoades
3
Letter to David Rhoades from Matthew Domke dated February 27, 2025.
SUBJECT:
CLINTON POWER STATION - REVISED REQUEST FOR INFORMATION
FOR NRC LICENSE RENEWAL INSPECTION: INSPECTION REPORT
DISTRIBUTION:
Alejandro Alen Arias
RidsNrrDorlLpl3
RidsNrrPMClinton Resource
RidsNrrDroIrib Resource
R3-DORS
ADAMS Accession Number: ML25058A260
Publicly Available
Non-Publicly Available
Sensitive
Non-Sensitive
OFFICE
RIII
NAME
MDomke:gmp
DATE
02/27//2025
OFFICIAL RECORD COPY
Enclosure
LICENSE RENEWAL INSPECTION
REVISED REQUEST FOR INFORMATION
I.
ADMINISTRATIVE INSPECTION INFORMATION
Inspection Report Number:
Onsite Inspection Dates:
June 9 - 13, 2025 and June 23 - 27, 2025
Inspection Procedure:
IP 71002, License Renewal Inspection
Lead Inspector:
Matthew Domke, Senior Reactor Inspector,
R3/DORS/EPRB
(630)829-9562
Matthew.Domke@nrc.gov
Inspectors:
Kevin Fay, Senior Reactor Inspector, R3/DORS/EB2
Joon Park, Reactor Inspector, R3/DORS/EPRB
Muzammil Siddiqui, Reactor Inspector, R3/DORS/EB1
Eric Magnuson, Reactor Inspector, R3/DORS/EPRB
II.
INSPECTION LOGISTICS
Email the following inspection logistics to the lead inspector by May 12, 2025, or
sooner:
1.
Inspection room name/number, directions from the main access facility, and
phone number;
2.
Interview room name/number;
3.
Response team contact information (names and phone numbers) and team roles
(e.g., management sponsor, lead, inspector counterpart);
4.
Any site access/badging and dosimetry actions needed for each inspector;
5.
Entrance meeting time and location;
6.
Confirmation that the team will have access to a licensee computer
with a nearby printer;
7.
Confirmation that the team will have Wi-Fi access;
8.
Cafeteria location and hours;
9.
Inspection response team normal working hours;
10. Any potential resource conflicts during the inspection (e.g., emergency
drills and all-staff meetings); and
11. Current management and engineering organizational chart.
2
INFORMATION REQUEST
Contact the lead inspector as soon as possible if you have any questions
regarding this information request. Provide the information electronically in pdf
files, Excel, or other searchable formats, preferably via an electronic sharing
service (CERTREC, ShareFile, Box, etc.). Specific Excel formats for various
enclosure items may be requested to assist in inspection sample selection. If you
do not have access to any of these services or similar, we can provide you
access to Box, which can be used to upload/download and share documents.
The files should contain descriptive names and be indexed and hyperlinked to
facilitate ease of use. Information in lists should contain enough information to
be easily understood by someone who has knowledge of light water reactor
technology.
1. Information Requested for In-Office Preparation Activities
The following information is requested by May 12, 2025.
1.1.
The original License Renewal (LR) application and all amendments to
the application.
1.2.
All responses to NRC Requests for Information.
1.3.
LR application development instructions (scoping and screening,
aging management reviews, operating experience reviews, etc.).
1.4.
LR process instructions (developing aging management review report,
developing the aging management programs, working with the
database, etc.).
1.5.
Listing of plant systems noting if the system has been screened
in-scope or out of scope for LR.
1.6.
For each Aging Management Program (AMP) and in-scope structure,
system, or component (SSC) provide:
1.6.1
LR scoping/boundary drawing(s);
1.6.2
program basis documents;
1.6.3
references specified in the AMP;
1.6.4
existing procedures (including draft procedures) implementing
the AMP;
1.6.5
a minimum of 10 years of operating experience related to the
AMP;
3
1.6.6
and identify the industry operating experience data bases (e.g.,
INPO, NRC generic communications, vendor notifications, etc.)
searched, and how these searches were conducted to identify
aging effects managed by the AMP.
1.7.
Risk-Ranking of the top 500 components from your site-specific
probabilistic safety analysis (PSA) sorted by Birnbaum Worth. Include
values for Risk Achievement Worth, Risk-Reduction Worth, and
Fussell-Vesely. Please provide the ranking in an excel spreadsheet
that contains the importance measures and the description of the
basic event (e.g., not just the basic event designator).
1.8.
Risk-ranking of the top 500 components (i.e., Large Early Release
Frequency (LERF)) from your site-specific PSA similar to the request in
item 1.5. (Provide in excel format.)
1.9.
Electronic copies of Updated Final Safety Analysis Report, Technical
Specifications, Technical Specifications Bases, and Technical
Requirements Manual.
1.10. Plant system piping and instrumentation diagrams (P&IDs).
1.11. Electronic copies of simplified plant drawings (if available). Note: these
may be uncontrolled documents such as big notes, training diagrams,
etc.
1.12. Any internal/external self-assessments and associated corrective
action documents generated in preparation for the inspection.
1.13. Provide a list of contact information of individuals responsible for each AMP.
2.
Information Requested to be Provided Throughout the Inspection:
2.1.
Any corrective action documents generated as a result of the teams
questions during this inspection as the documents are generated.
2.2.
List of questions and/or document requests submitted by the team and
their status (e.g., open, closed) sorted by inspector. Provide daily by
2:00 p.m. to each inspector. It is recommended to provide the lead
inspector with a master list sorted by inspector and each inspector with
a list containing only the items originated by that inspector.
If you have questions regarding the information requested, please contact the lead inspector.