Revised Request for Information for NRC License Renewal Inspection Inspection Report 05000461/2025011
ML25058A260
Person / Time
Site: Clinton Constellation icon.png
Issue date: 02/27/2025
From: Matthew Domke
NRC/RGN-III/DORS/ERPB
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
References
IR 2025011
Download: ML25058A260 (1)


See also: IR 05000461/2025011

Text

David Rhoades

Senior Vice President

Constellation Energy Generation, LLC

President and Chief Nuclear Officer (CNO)

Constellation Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT:

CLINTON POWER STATION - REVISED REQUEST FOR INFORMATION

FOR NRC LICENSE RENEWAL INSPECTION: INSPECTION REPORT

05000461/2025011

Dear David Rhoades:

On April 1, 2024, the U.S. Nuclear Regulatory Commission issued a request for information letter

to support the performance of NRC Inspection Procedure 71002, License Renewal Inspection, at

Clinton Nuclear Power Plant. The inspection was originally scheduled to begin on

October 21, 2024. The NRC has, after discussion with your staff, rescheduled the inspection to

begin on June 9, 2025. This letter contains a revised request for information to support the

schedule change.

The inspection will evaluate Clintons initial license renewal program plans and implementation

to ensure they are consistent with the requirements of Title 10 of the Code of Federal

Regulations (10 CFR), Part 54, Requirements for the Renewal of Operating Licenses for

Nuclear Power Plants, and Clintons license renewal application. The inspection will include an

evaluation of aging management programs that are planned or in place. The inspection will also

include a review of information and documentation required by 10 CFR 54.

The inspection will include 2 onsite weeks and will consist of 5 NRC inspectors (including the

lead inspector). The current inspection schedule is as follows:

Preparation week:

June 2 - 6, 2025

Onsite weeks:

Week 1: June 9 - 13, 2025

Week 2: June 23 - 27, 2025

Experience with previous baseline inspections of similar depth and length has shown that this

type of inspection is extremely resource intensive, both for the NRC inspectors and the licensee

staff. To minimize the inspection impact on the site and to ensure a productive inspection for

both parties, we have enclosed a request for information.

It is important that all these documents are up-to-date and complete to minimize the number of

additional documents requested during the preparation and/or the onsite portions of the

February 27, 2025

D. Rhoades

2

inspection. Insofar as possible, this information should be provided electronically to the lead

inspector. The information request has been divided into three groups:

The first group of documents requested are those items needed to support our

in-office preparation activities. This set of documents should be provided to the lead

inspector by May 12, 2025. During the in-office preparation activities, the team may

identify additional information needed to support the inspection.

The second group includes supporting information to be provided throughout the onsite

inspection. Specifically, corrective action documents and answers to questions

developed during the inspection are requested to be provided as the documents are

generated.

In addition, the enclosure includes information and requests addressing inspection logistics.

The lead inspector for this inspection is Matthew Domke. We understand that our point of

contact for this inspection is Lydia Dworakowski of your organization. If there are any questions

about the inspection or the material requested in the enclosure, please contact the lead

inspector at (630)829-9562 or via email at Matthew.Domke@NRC.gov.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control

Number.

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

Matthew Domke

Senior Reactor Inspector

Engineering Reactor Projects Branch

Division of Operating Reactor Safety

Docket No. 05000461

License No. NPF-62

Enclosure:

License Renewal Inspection

Revised Request for Information

cc w/ encl: Distribution via LISTSERV

Signed by Domke, Matthew

on 02/27/25

D. Rhoades

3

Letter to David Rhoades from Matthew Domke dated February 27, 2025.

SUBJECT:

CLINTON POWER STATION - REVISED REQUEST FOR INFORMATION

FOR NRC LICENSE RENEWAL INSPECTION: INSPECTION REPORT

05000461/2025011

DISTRIBUTION:

Alejandro Alen Arias

RidsNrrDorlLpl3

RidsNrrPMClinton Resource

RidsNrrDroIrib Resource

Jack Giessner

Mohammed Shuaibi

Diana Betancourt-Roldan

Harral Logaras

David Curtis

Jared Heck

R3-DORS

ADAMS Accession Number: ML25058A260

Publicly Available

Non-Publicly Available

Sensitive

Non-Sensitive

OFFICE

RIII

NAME

MDomke:gmp

DATE

02/27//2025

OFFICIAL RECORD COPY

Enclosure

LICENSE RENEWAL INSPECTION

REVISED REQUEST FOR INFORMATION

I.

ADMINISTRATIVE INSPECTION INFORMATION

Inspection Report Number:

05000461/2025011

Onsite Inspection Dates:

June 9 - 13, 2025 and June 23 - 27, 2025

Inspection Procedure:

IP 71002, License Renewal Inspection

Lead Inspector:

Matthew Domke, Senior Reactor Inspector,

R3/DORS/EPRB

(630)829-9562

Matthew.Domke@nrc.gov

Inspectors:

Kevin Fay, Senior Reactor Inspector, R3/DORS/EB2

Joon Park, Reactor Inspector, R3/DORS/EPRB

Muzammil Siddiqui, Reactor Inspector, R3/DORS/EB1

Eric Magnuson, Reactor Inspector, R3/DORS/EPRB

II.

INSPECTION LOGISTICS

Email the following inspection logistics to the lead inspector by May 12, 2025, or

sooner:

1.

Inspection room name/number, directions from the main access facility, and

phone number;

2.

Interview room name/number;

3.

Response team contact information (names and phone numbers) and team roles

(e.g., management sponsor, lead, inspector counterpart);

4.

Any site access/badging and dosimetry actions needed for each inspector;

5.

Entrance meeting time and location;

6.

Confirmation that the team will have access to a licensee computer

with a nearby printer;

7.

Confirmation that the team will have Wi-Fi access;

8.

Cafeteria location and hours;

9.

Inspection response team normal working hours;

10. Any potential resource conflicts during the inspection (e.g., emergency

drills and all-staff meetings); and

11. Current management and engineering organizational chart.

2

INFORMATION REQUEST

Contact the lead inspector as soon as possible if you have any questions

regarding this information request. Provide the information electronically in pdf

files, Excel, or other searchable formats, preferably via an electronic sharing

service (CERTREC, ShareFile, Box, etc.). Specific Excel formats for various

enclosure items may be requested to assist in inspection sample selection. If you

do not have access to any of these services or similar, we can provide you

access to Box, which can be used to upload/download and share documents.

The files should contain descriptive names and be indexed and hyperlinked to

facilitate ease of use. Information in lists should contain enough information to

be easily understood by someone who has knowledge of light water reactor

technology.

1. Information Requested for In-Office Preparation Activities

The following information is requested by May 12, 2025.

1.1.

The original License Renewal (LR) application and all amendments to

the application.

1.2.

All responses to NRC Requests for Information.

1.3.

LR application development instructions (scoping and screening,

aging management reviews, operating experience reviews, etc.).

1.4.

LR process instructions (developing aging management review report,

developing the aging management programs, working with the

database, etc.).

1.5.

Listing of plant systems noting if the system has been screened

in-scope or out of scope for LR.

1.6.

For each Aging Management Program (AMP) and in-scope structure,

system, or component (SSC) provide:

1.6.1

LR scoping/boundary drawing(s);

1.6.2

program basis documents;

1.6.3

references specified in the AMP;

1.6.4

existing procedures (including draft procedures) implementing

the AMP;

1.6.5

a minimum of 10 years of operating experience related to the

AMP;

3

1.6.6

and identify the industry operating experience data bases (e.g.,

INPO, NRC generic communications, vendor notifications, etc.)

searched, and how these searches were conducted to identify

aging effects managed by the AMP.

1.7.

Risk-Ranking of the top 500 components from your site-specific

probabilistic safety analysis (PSA) sorted by Birnbaum Worth. Include

values for Risk Achievement Worth, Risk-Reduction Worth, and

Fussell-Vesely. Please provide the ranking in an excel spreadsheet

that contains the importance measures and the description of the

basic event (e.g., not just the basic event designator).

1.8.

Risk-ranking of the top 500 components (i.e., Large Early Release

Frequency (LERF)) from your site-specific PSA similar to the request in

item 1.5. (Provide in excel format.)

1.9.

Electronic copies of Updated Final Safety Analysis Report, Technical

Specifications, Technical Specifications Bases, and Technical

Requirements Manual.

1.10. Plant system piping and instrumentation diagrams (P&IDs).

1.11. Electronic copies of simplified plant drawings (if available). Note: these

may be uncontrolled documents such as big notes, training diagrams,

etc.

1.12. Any internal/external self-assessments and associated corrective

action documents generated in preparation for the inspection.

1.13. Provide a list of contact information of individuals responsible for each AMP.

2.

Information Requested to be Provided Throughout the Inspection:

2.1.

Any corrective action documents generated as a result of the teams

questions during this inspection as the documents are generated.

2.2.

List of questions and/or document requests submitted by the team and

their status (e.g., open, closed) sorted by inspector. Provide daily by

2:00 p.m. to each inspector. It is recommended to provide the lead

inspector with a master list sorted by inspector and each inspector with

a list containing only the items originated by that inspector.

If you have questions regarding the information requested, please contact the lead inspector.