ML25055A225
| ML25055A225 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 02/24/2025 |
| From: | Lom P NRC/OGC |
| To: | Atomic Safety and Licensing Board Panel |
| SECY RAS | |
| References | |
| RAS 57294, 50-255-LA-3, ASLBP 24-986-01-LA-BD01 | |
| Download: ML25055A225 (0) | |
Text
February 24, 2025 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of HOLTEC DECOMMISSIONING INTERNATIONAL, LLC, AND HOLTEC PALISADES, LLC (Palisades Nuclear Plant)
Docket No. 50-255-LA-3 JOINT MOTION FOR CORRECTION OF TRANSCRIPT OF INITIAL PREHEARING CONFERENCE HELD ON FEBRUARY 12, 2025 Pursuant to 10 C.F.R. § 2.323(a) and consistent with 10 C.F.R. § 2.327(d), the U.S.
Nuclear Regulatory Commission (NRC) staff (Staff), on behalf of itself and the other participants1 (collectively, Participants), hereby requests that the Atomic Safety and Licensing Board (Board) issue an Order correcting the official transcript of the Initial Prehearing Conference held on February 12, 2025, as set forth in the errata listed in Attachment 1 hereto.
In accordance with 10 C.F.R. § 2.323(b), the NRC Staff consulted with the Joint Petitioners, the Petitioning Organizations, and the Applicant to identify necessary corrections to 1 The other participants joining this motion are Alan Blind, Jody Flynn, Tom Flynn, Bruce Davis, Karen Davis, Christian Moevs, Mary Huffman, Chuck Huffman, Diane Ebert (Joint Petitioners); Beyond Nuclear, Dont Waste Michigan, Michigan Safe Energy Future, Three Mile Island Alert, and Nuclear Energy Information Service (Petitioning Organizations); and Holtec Decommissioning International, LLC and Holtec Palisades, LLC (Applicant).
the transcript. The Participants request that the transcript be revised to incorporate the corrections identified in Attachment 1 hereto.
Respectfully submitted,
/Signed (electronically) by/
Peter L. Lom Counsel for NRC Staff Mail Stop: O14-A44 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Telephone: (301) 415-1100 Email: Peter.Lom@nrc.gov Dated February 24, 2025
ATTACHMENT 1 - TABLE OF TRANSCRIPT CORRECTIONS Page Line Now Reads Should Read Speaker 6
10 drat draft Chair Krause 11 14 its its Taylor 11 20-21 purpose of need purpose and need Taylor 17 15 that that that Taylor 21 24 and is and Blind 23 17 improve approve Blind 29 7
presented proposed Blind 29 24 there their Blind 34 4
pressurized relief tank pressurizer relief tank Blind 39 3
dispute in dispute Blanton 39 11 opinion opening Blanton 39 23 license licensee Blanton 40 5-7 petitioners contentions. There are four LARs within the scope of this proceeding, nothing more. ¶ This proceeding does not concern any petitioners contentions. ¶ There are four LARs within the scope of this proceeding, nothing more. This proceeding does not concern any Blanton 40 15 The LARs These LARs Blanton 41 13 the that Blanton 41 21 permit premise Blanton 41 22 of to Blanton 41 25 on of Blanton 42 11 these the Blanton 42 17 requirement requirements Blanton 44 9
impertinent part in pertinent part Judge Arnold 46 14 environment environmental Blanton 46 23 RA RAI Blanton 49 1
defuel defueled Blanton 49 19 would wouldnt Blanton 49 21 defuel defueled Blanton 50 6
the them Chair Krause 50 17 amendment amendments Blanton 50 18 plan restoring plan, restoring Blanton 52 9
permanent permanently Blanton 54 22 preceding proceeding Spencer 55 1
the that Spencer 57 17 petitioners petitioners Spencer 57 20 contingents contentions Spencer 58 19-20 license are -- if granted, license amendments are
-- would if granted, Spencer 60 2
CRF CFR Ghosh Naber 60 17 inextricable inextricably Ghosh Naber 63 22 in on Spencer
Page Line Now Reads Should Read Speaker 64 15 really continued relevance really of continued relevance Spencer 67 13 at our answer in our answer Spencer 68 15-16 contention in the stability regulation contention admissibility regulation Lom 68 17 request requested Lom 70 3
before licensed four license Lom 70 20 request requests Lom 70 22 little literal Lom 72 6
And this And our Ghosh Naber 72 21 of more of, are more Ghosh Naber 72 22 and disability admissibility Ghosh Naber 73 9
that would really that wouldnt really Spencer 73 14 or have
, where were going to have Spencer 79 8
saw say Blind 80 3
its particularly in particular Blind 81 5
what why Blind 83 1
who which Blanton 83 22 restore restores Blanton 84 3
theres question theres no question Blanton 84 24 case is cases Blanton 86 6
do they sufficient factual support do they have sufficient factual support Spencer 87 7
and their reply in their reply Spencer 87 15 and the SRM in the SRM Spencer 87 17 of in Spencer 88 4
the un-mooting
-- the -- on mooting Spencer 88 13-14 used to be met. Its whether it used to meet the requirements used to be met -- it's --
whether it used to meet the requirements, Spencer 88 18 current currently Spencer 90 18 day date Lodge 90 23 licensed license Lodge 91 11 2562 Inspection Manual 2562 Blind
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of HOLTEC DECOMMISSIONING INTERNATIONAL, LLC, AND HOLTEC PALISADES, LLC (Palisades Nuclear Plant)
Docket No. 50-255-LA-3 CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. § 2.305, I hereby certify that the Joint Motion for Correction of Transcript of Initial Prehearing Conference Held on February 12, 2025, has been filed through the NRCs E-Filing System this 24th day of February 2025.
/Signed (electronically) by/
Peter L. Lom Counsel for NRC Staff Mail Stop: O14-A44 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Telephone: (301) 415-1100 Email: Peter.Lom@nrc.gov Dated February 24, 2025