ML25055A221
| ML25055A221 | |
| Person / Time | |
|---|---|
| Site: | Vallecitos Nuclear Center |
| Issue date: | 02/24/2025 |
| From: | Michelle Catts GE-Hitachi Nuclear Energy Americas |
| To: | Office of Nuclear Reactor Regulation, Document Control Desk |
| References | |
| M2500066, EA-NRR-2025-0013 | |
| Download: ML25055A221 (1) | |
Text
M2500066 February 24, 2025 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555-001
Subject:
GEH Response to NRC Order EA-NRR-2025-0013
References:
- 1) NRC License R-33, Docket 0500073, General Electric Hitachi (GEH) Nuclear Test Reactor (NTR)
- 2)
Order EA-NRR-2025-0013 Modifying Licenses and Establishing Initial Final Safety Analysis Report Update Due Dates Consistent with the Non-Power Production or Utilization Facility License Renewal Rule (EPID L-2024-NFC-0000)
In accordance with NRC Order EA-NRR-2025-0013 (Reference 2), GE Hitachi Nuclear Energy Americas LLC (GEH) hereby acknowledges its consent to the Order and initial final safety analysis report (FSAR) update due date of January 18, 2030.
Please contact me at (910) 200-9836 or Phillip Ollis at (910) 616-4018 if you have any questions regarding this response.
I declare under penalty of perjury that the foregoing is true and correct.
Sincerely, Michelle P. Catts Senior Vice President of GEHA Regulatory Affairs GE Hitachi Nuclear Energy Americas, LLC cc: NRC Region IV Administrator D. Hardesty, USNRC/NRR J. D. Parrott, USNRC/NMSS