ML25044A066

From kanterella
Jump to navigation Jump to search
Us Dept of Interior, Geological Survey (Usgs), Response to Order EA-NRR-2025-0013
ML25044A066
Person / Time
Site: U.S. Geological Survey
Issue date: 02/13/2025
From: Wallick J
US Dept of Interior, Geological Survey (USGS)
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
EA-NRR-2025-0013
Download: ML25044A066 (1)


Text

U.S. GEOLOGICAL SURVEY Rocky Mountain Region Box 25046 M.S. 974 Denver Federal Center Denver, Colorado 80225 USGS - Facility License R-113 - Docket Number 50-274 Page 1 of 1 Document Date: 2025-02-13 DATE:

Thursday, February 13, 2025 TO:

Attn: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 FROM:

Jonathan Wallick, Reactor Director

SUBJECT:

Response to Order EA-NRR-2025-0013 DISCUSSION In accordance with the NRC Order EA-NRR-2025-0013, the U.S. Geological Survey TRIGA Reactor (GSTR) is submitting an answer to the Order, affirming consent to the Order. The GSTR intends to fully comply with the Order in all prescribed measures, including submission of an updated Final Safety Analysis Report (FSAR) by the due date of 2027-09-27 as listed in the Order Attachment.

CONTACT If you have any questions regarding this matter, please contact me at (303) 236-4726.

I declare under penalty of perjury that the foregoing is true and correct.

Sincerely, Jonathan Wallick, Reactor Director Copied to:

Shannon Mahan, Reactor Administrator, USGS Brooke Gallagher, Project Manager, US NRC Kevin Roche, Inspector, US NRC Juan Arellano, Inspector, US NRC Attachments: None.

JONATHAN WALLICK 2025.02.13 07:15:59

-07'00'