ML25030A114

From kanterella
Jump to navigation Jump to search
IMC 2694 Appendix a, Fuel Facility Construction Inspection Program--Construction and Pre-Operational Inspection Procedures
ML25030A114
Person / Time
Issue date: 06/24/2025
From: Jeannette Arce
NRC/NMSS/DFM/IOB
To:
Shared Package
ML25030A113 List:
References
CN 25-020
Download: ML25030A114 (1)


Text

Issue Date: 06/24/25 1

2694 App A NRC INSPECTION MANUAL NMSS/DFM INSPECTION MANUAL CHAPTER 2694 APPENDIX A FUEL FACILITY CONSTRUCTION INSPECTION PROGRAM CONSTRUCTION AND PRE-OPERATIONAL INSPECTION PROCEDURES Effective Date: 06/24/2025 See Inspection Manual Chapter (IMC) 2683, "Material Control and Accounting Inspection of Fuel Cycle Facilities," for a complete list of material control and accounting inspection procedures (IPs).

See appropriate IMCs for a list of physical security and information security IPs.

See IMC 2600, Appendix B, NRC Core Inspection Requirements, Tables 1, 2, and 3, for pre-operational procedures.

IPs may be added or deleted as required. Portions of these IPs will not apply to the fuel cycle facility being constructed and the applicable sections should be specified in the inspection plan.

Construction Inspection Procedures IP 88200, Inspections of Safety Significant Items and Services During Construction of Fuel Cycle Facilities Appendix A:

Foundations and Buildings Appendix B:

Structural Concrete Appendix C:

Structural Steel and Supports Appendix D:

Piping Systems Appendix E:

Pipe Support and Restraints Appendix F:

Mechanical Components Appendix G:

Electrical Cable Appendix H:

Electrical Components and Systems Appendix I:

Ventilation and Confinement Systems Appendix J:

Instrumentation and Control Systems Appendix K:

Welding Appendix L:

Fire Protection Systems Appendix M:

Inspection of Digital Instrumentation and Control System/Software Design Management Measures Inspection Procedures IP 88201, Inspections of Management Measures During Construction of Fuel Cycle Facilities Appendix A: Configuration Management (CM)

Appendix B: Maintenance Appendix C: Training and Qualification Appendix D: Procedures

Issue Date: 06/24/25 2

2694 App A Appendix E: Audits and Assessments Appendix F: Incident Investigations Appendix G: Records Management Appendix H: Other Quality Assurance (QA) Elements (1-18) (as applicable)

Pre-Operational Inspection Procedures IP 88202: Inspections of Operational Readiness During Construction of Fuel Cycle Facilities Inspection procedures listed in IMC 2600 Appendix B: NRC Core Inspection Requirements, Tables 1, 2, and 3. These include IPs for:

SAFETY OPERATIONS (e.g., criticality safety)

SAFEGUARDS (e.g., material control and accounting, physical security, classified material and information security also known as INFOSEC)

RADIOLOGICAL CONTROLS (e.g., radiation protection, environmental protection)

FACILITY SUPPORT (e.g., emergency preparedness, plant modifications)

As Needed Inspection Procedures END List of Attachments: : Revision History for IMC 2694 Appendix A

Issue Date: 06/24/25 Att1-1 2694 App A : Revision History for IMC 2694 Appendix A Commitment Tracking Number Accession Number Issue Date Change Notice Description of Change Description of Training Required and Completion Date Comment Resolution and Closed Feedback Form Accession Number (Pre-Decisional Non-Public Information)

N/A ML25030A114 06/24/25 CN 25-020 Construction Inspection Update: Major revision, including at-risk construction, use of Open Items, new Appendix C: Principal Inspection Plan (PIP) Creation, and reference to three new construction inspection procedures: IP 88200, IP 88201, and IP 88202.

Updates also made for RII reorganization.

N/A N/A