20250114 NRC-TVA Public Meeting Summary
ML25024A063
Person / Time
Site: 99902056
Issue date: 01/14/2025
From: Allen Fetter
NRC/NRR/DNRL/NLIB
To:
References
Download: ML25024A063 (2)


Text

1 U.S. Nuclear Regulatory Commission Public Meeting Summary Meeting

Title:

Meeting between the U.S. Nuclear Regulatory Commission and Tennessee Valley Authority (TVA) regarding TVAs request for clarification and alignment on the acceptability of TVA's approach to mapping of geology and geologic features during excavation activities at the Clinch River Nuclear Site (Docket No. 99902056)

Meeting Identifier: 20241534, Agencywide Document Access Management System Accession No.: ML24358A167 Date of Meeting: Tuesday, January 14, 2025 Location: Teams Meeting/Teleconference Type of Meeting: Observation meeting Purpose of the Meeting:

The purpose of this meeting was to have technical discussions between Nuclear Regulatory Commission and Tennessee Valley Authority staff to clarify the scope of the Clinch River Nuclear Site early site permit (ESP-006, ML19352D868) Permit Conditions 3 and 4 with respect to mapping of geology and geologic features in the planned excavation for the reactor building (proposed Seismic Category I) and surrounding foundation support structures (proposed Seismic Category II) for the BWRX-300 nuclear power plant at the Clinch River Nuclear site.

Summary of Meeting The NRC staff started the observation meeting with opening remarks, sharing of the topics for discussion document (ML25013A167) discussion of logistics and process and introductions of the lead participants. Tennessee Valley Authority shared their own presentation (ML25023A182) to elicit feedback from the NRC staff. NRC staff clarified that the detailed geologic mapping required by Permit Condition 3 applies only to excavations for safety-related engineered structures. Regarding the Permit Condition 4 requirement to perform additional geotechnical investigations at the final excavation level of safety-related engineered structures, for the reactor building proposed as Seismic Category I, such investigations would only be necessary if any geologic features potentially adverse to subsurface stability of subsurface materials and foundations are observed at the base of the reactor building excavations.

There were no questions or comments from the public.

Slides/

References:

There were no slides prepared in advance of the meeting, but slides shared by TVA are now in ADAMS under ML25023A182. The NRC staff also showed a figure (Figure 1) from a publicly available document (ML23335A100) to facilitate discussions.

Action Items/Next Steps: None. The technical discussions ensured NRC-TVA alignment on the scope of ESP-006 permit conditions.

2 NRC attendees/participants: Luissette Candelario-Quintana, Jenise Thompson, Zuhan Xi, Allen Fetter and Billy Gleaves TVA attendees/participants: Ray Schiele, Michele Moorrees, Kelvin Montague and Andrew

Dewhurst, Public attendees: CJ Fong, Andrew Brenner, Darrell Gardner, Addison Hall, Marty Bryan, Mory Diane, Steven Mitchell, John Cupp, and Spencer Toohill