ML25023A098

From kanterella
Jump to navigation Jump to search
Rev 0 Periodic Review Concurrence Memo
ML25023A098
Person / Time
Issue date: 02/04/2025
From: Shana Helton
Division of Fuel Management
To: Christian Araguas
NRC/RES/DE
Shared Package
ML25023A097 List:
References
Download: ML25023A098 (2)


Text

.

MEMORANDUM TO:

Christian Araguas, Director Division of Engineering Office of Nuclear Regulatory Research FROM:

Shana Helton, Director Division of Fuel Management Office of Nuclear Material Safety and Safeguards

SUBJECT:

RESULTS OF PERIODIC REVIEW OF REGULATORY GUIDE (RG) 3.10, LIQUID WASTE TREATMENT SYSTEM DESIGN GUIDE FOR PLUTONIUM PROCESSING AND FUEL FABRICATION PLANTS This memorandum documents the US Nuclear Regulatory Commission (NRC) periodic review of regulatory guide (RG) 3.10, Revision 0, Liquid Waste Treatment System Design Guide for Plutonium Processing and Fuel Fabrication Plants, issued in 1973. As discussed in Management Directive 6.6, Regulatory Guides, the NRC staff reviews RGs approximately every 10 years to ensure that the RGs continue to provide useful guidance. Documentation of the NRC staff review is enclosed.

The staff performed a periodic review for this RG in March 2024 and recommended that the RG should be revised to address technical and administrative issues. However, since no application is expected for a plutonium processing and fuel fabrication plant within the next several years the staff has updated the periodic review in January 2025 identifying issues that need to be considered in the future. Therefore, this RG should not be withdrawn and could be revised in the future as needed.

Enclosure:

1. Periodic Review for RG 3.10 Revision 0 CONTACT: Nicole Cortes, NMSS/DFM 301-415-7331 February 4, 2025 Signed by Helton, Shana on 02/04/25

Package: ML25023A097; Memo: ML25023A098; Periodic Review:

RG 3.10 Rev 0: ML25023A107 OFFICE NMSS/DFM/CTCFB NMSS/DFM/CTCFB RES/DE/RGPMB SUNSI Review NAME N. Cortes T. Govan H. Karagiannis H. Karagiannis DATE 01/27/2025 01/29/2025 01/30/2025 01/30/2025 OFFICE RES/DE/RGPMB RES/DE/RGPMB NMSS/DFM NAME T. Walker Webb M. Rahimi S. Helton DATE 01/30/2025 02/3/2025 02/04/2025