Notification of 10 CFR 50.69 Risk Informed Categorization and Treatment of Sscs for Nuclear Power Reactors Inspection 05000282/2025012 05000306/2025012
ML25022A156
Person / Time
Site: Prairie Island  
Issue date: 01/22/2025
From: James Park
NRC/RGN-III/DORS/ERPB
To: Conboy T
Northern States Power Company, Minnesota
References
IR 2025012
Download: ML25022A156 (1)


See also: IR 05000282/2025012

Text

Thomas A. Conboy

Site Vice President

Prairie Island Nuclear Generating Plant

Northern States Power Company, Minnesota

1717 Wakonade Drive East

Welch, MN 55089-9642

SUBJECT:

PRAIRIE ISLAND NUCLEAR GENERATING PLANT - NOTIFICATION OF

TITLE 10 OF THE CODE OF FEDERAL REGULATIONS 50.69,

RISK-INFORMED CATEGORIZATION AND TREATMENT OF

STRUCTURES, SYSTEMS, AND COMPONENTS FOR NUCLEAR POWER

REACTORS, INSPECTION (INSPECTION REPORT 05000282/2025012;

05000306/2025012) AND REQUEST FOR INFORMATION (RFI)

Dear Thomas A. Conboy:

The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC)

staff will conduct a Title 10 of the Code of Federal Regulations (10 CFR) 50.69 program

inspection at Prairie Island Nuclear Generating Plant, Units 1 and 2, in April 2025. The

inspection team will be composed of personnel from the Region III Office and led by

Joon S. Park. The inspection will be conducted in accordance with Inspection Procedure

37060, the NRC's special and infrequently performed inspection procedure. The inspection is

being performed because the requirements of 10 CFR 50.69 have been implemented at

Prairie Island Nuclear Generating Plant Nuclear Plant, Units 1 and 2.

The schedule for the inspection is as follows:

Information Gathering Trip

March 10-14, 2025

Preparation week:

April 21-25, 2025

Onsite weeks:

April 28-May 2, 2025, and May 12-16, 2025

An initial list of the documents that the team will review during the conduct of the inspection are

listed in the Enclosure. The team leader will contact you with any additional specific document

requests prior to the start of the inspection. Your cooperation and support during this inspection

will be appreciated.

If you have questions concerning this inspection, or the inspection teams information request

or logistical needs, please contact Joon S. Park, Team Leader at (630) 829-9715 or via email

at joon.park@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the

January 22, 2025

T. Conboy

2

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control Number

3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget Control Number.

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

Joon S. Park

Reactor Inspector

Engineering Reactor and Projects Branch

Division of Operating Reactor Safety

Docket Nos. 50-282; 50-306

License Nos. DPR-42; DPR-66

Enclosure:

10 CFR 50.69 Program Supporting

Documentation Request for Information

cc: Distribution via LISTSERV

Signed by Park, Joon

on 01/22/25

ML25022A156

SUNSI Review

Non-Sensitive

Sensitive

Publicly Available

Non-Publicly Available

OFFICE

RIII

NAME

JPark:gmp

DATE

01/22/2025

Enclosure

10 CFR 50.69 Program Supporting

Documentation

Contact the lead inspector as soon as possible if you have any questions regarding this

information request. Provide the information electronically in pdf files, Excel, or other

searchable formats, preferably via an electronic sharing service (CERTREC, ShareFile,

Box, etc.). Specific Excel formats for various enclosure items may be requested to assist in

inspection sample selection. If you do not have access to any of these services or similar,

we can provide you access to Box, which can be used to upload/download and share

documents. The files should contain descriptive names and be indexed and hyperlinked to

facilitate ease of use. Information in lists should contain enough information to be easily

understood by someone who has knowledge of light water reactor technology.

This document request is based on typical documents that a generic plant might have. As

such, this generic document request is not meant to imply that any specific plant is

required to have all of the listed documents. It is recognized that some documents listed

below may not be available for your plant. In addition, the document titles listed below are

based on typical industry document names; your plant specific document titles may vary.

I.

LOGISTICS

Email the following inspection logistics to the lead inspector by April 16, 2025, or

sooner:

1.

Entrance meeting time and location.

2.

Inspection room name/number, directions from the main access facility, and phone

number.

3.

Current management and engineering organizational chart.

4.

Response team contact information (names and phone numbers) and team

roles (e.g., management sponsor, lead, inspector counterpart).

5.

Any potential resource conflicts during the inspection (e.g., emergency drills

and all-staff meetings).

II. INFORMATION REQUEST

The following information is requested by March 7, 2025, or sooner:

Note: If you are unable to provide the following items, please reach out to the lead

inspector as soon as possible.

1.

Licensing bases documents:

a.

Prairie Island 10 CFR 50.69 License Amendment Request (LAR)

b.

Responses to Requests for Additional Information (RAI) regarding the Prairie

Island 10 CFR 50.69 LAR

c.

U.S. NRC Safety Evaluation Report and approval of 10 CFR 50.69 LAR

2

d.

Updated Final Safety Analysis changes associated with the implementation of

10 CFR 50.69 at Prairie Island

e.

NEI 00-04

f.

Units 1 and 2 Facility Operating License

2.

Copy (latest revision) of 10 CFR 50.69 program procedures

3.

10 CFR 50.69 categorization documents for all systems which have completed

system categorization

4.

Probabilistic Risk Assessment (PRA) system notebooks for systems that have

completed system categorization

5.

List of Risk-Informed Safety Class (RISC)-1, RISC-2, and RISC-3 component

failures (issue report designator and title will be acceptable) since implementing the

program requirements on associated systems. If applicable, provide any

performance indicators utilized to monitor performance of RISC-1, RISC-2, and

RISC-3 SSCs consistent with categorization process assumptions and in the

PRA model

6.

Administrative procedures that are utilized to implement alternative treatment of

regulatory requirements under 10 CFR 50.69 (example: changes to In-service

Testing Program procedures, Maintenance Rule Program procedures, Reportability

Manual, etc.)

7.

Meeting Minutes for all Integrated Decision-Making Panel (IDP) meetings to date

8.

List of Corporate and Prairie Island issue reports (designator and title) associated

with the implementation of the 10 CFR 50.69 process at Prairie Island. Do not

include issue reports only associated with the submittal and approval of the

10 CFR 50.69 license amendment.

9.

Audits and self-assessments of the Prairie Island/Corporate 10 CFR 50.69 Program

since the issuance of the 10 CFR 50.69 license amendment (November 12, 2019)

10. List of all changes or upgrades made to the PRA model of record utilized for

10 CFR 50.69 Program since the issuance of the 10 CFR 50.69 license amendment

on November 12, 2019

11. Applicable credentials of IDP members

12. Provide program requirements that implement the requirement for feedback and

process adjustments per 10 CFR 50.69(e). Provide a summary of updates, if

applicable, to the categorization or treatment processes as a result of changes to

the plant, operational practices, operating experience, or as a result of the

performance issues of RISC-1, 2, or 3 SSCs.

13. License event reports associated with any reportable events per 10 CFR 50.69(g)

since implementation of the program at Prairie Island

14. PRA model information (e.g., Excel spreadsheet) providing a listing of all basic

3

events with all available importance measures (e.g., Birnbaum, F-V, RAW and

RRW) and an associated list of cutsets. This information shall be taken from the

PRA model of record used in the 10 CFR 50.69 categorization process

15. System drawings identifying the RISC category or passive system components for

systems that have completed the categorization process

16. If a seismic PRA was not used for passive risk categorization, please provide the

Safe Shutdown Equipment List (used for Seismic Margins Analysis)

17. The plants Individual Plant Examination of External Events

If you have questions regarding the information requested, please contact the lead inspector.