ML24347A014
| ML24347A014 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 12/12/2024 |
| From: | Komm D Tennessee Valley Authority |
| To: | Office of Nuclear Material Safety and Safeguards, Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML24347A014 (1) | |
Text
Post Office Box 2000, Decatur, Alabama 35609-2000 December 12, 2024 10 CFR 50.54(q) 10 CFR 50, Appendix E 10 CFR 72.44(f)
ATTN: Document Control Desk Director, Division of Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Browns Ferry Nuclear Plant, Units 1, 2, and 3 Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, 50-296, and 72-052
Subject:
Browns Ferry Nuclear Plant - Site Emergency Plan Implementing Procedure Revision In accordance with the requirements of Title 10 of the Code of Federal Regulations (10 CFR) 50.54(q); 10 CFR 50, Appendix E; and 10 CFR 72.44(f), the Tennessee Valley Authority (TVA) is submitting a description of changes to the Browns Ferry Nuclear Plant (BFN) Radiological Emergency Plan (REP). The affected documents are the BFN Emergency Plan Implementing Procedures (EPIPs) named below.
EPIP Revision Title Effective Date EPIP-6 0050 Activation and Operation of the Technical Support Center (TSC) 11/12/2024 EPIP-10 0041 Medical Emergency Procedure 11/12/2024 Description of Changes and Summary of Analysis EPIP-6 includes an updated SED Turnover Data Sheet (Attachment 22) to ensure that the information on the sheet is the most appropriate data for directing the response to the emergency.
This change was determined to be a change to the radiological emergency plan that was not editorial or typographical in nature. This change was determined to not conform to activities that had prior NRC approval. Since no Planning Standard or site-specific Emergency Plan (EP) commitment was impacted, it was concluded that this activity could be implemented without performing a 50.54(q) reduction in effectiveness evaluation. Therefore, the change was allowed to be implemented without prior NRC approval.
1\\14 TENNESSEE VALLEY AUTHORITY
U.S. Nuclear Regulatory Commission Page 2 December 12, 2024 Also, space was added on the form to include information for all three units. These changes were determined to be changes to the REP that were editorial or typographical in nature. The changes did not involve a site-specific EP commitment; therefore, these changes were allowed to be implemented without performing a 50.54(q) reduction in effectiveness evaluation.
A column was added to EPIP-10, Attachment 2 to include the victims age to the victim information portion of the form. These changes were determined to be changes to the REP that were editorial or typographical in nature. The changes did not involve a site-specific EP commitment; therefore, these changes were allowed to be implemented without performing a 50.54(q) reduction in effectiveness evaluation.
There are no new regulatory commitments in this letter. If you have any questions regarding this submittal, please contact E. J. Cole at (256) 729-4742.
Respectfully, Daniel A. Komm Site Vice President cc:
NRC Regional Administrator - Region II NRC Senior Resident Inspector - Browns Ferry Nuclear Plant NRR Project Manager - Browns Ferry Nuclear Plant