SNC Presentation - Pre-Submittal Meeting on December 16, 2024 - Proposed Vogtle 1 and 2 MRP-227
ML24345A004
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 12/16/2024
From:
Southern Nuclear Operating Co
To: John Lamb
NRC/NRR/DORL/LPL2-1
Shared Package
ML24345A003 List:
References
EPID L-2024-LRM-0142
Download: ML24345A004 (1)


Text

Proposed Vogtle Submittal License Renewal Commitment Reactor Internals Inspection Plan Presubmittal Meeting: December 16, 2025

Agenda Description History Schedule Discussion

Vogtle License Renewal Commitment Description

  • Commitment item no. 20 of NURE-1920, Safety Evaluation Report Related to the License Renewal of VEGP Units 1 and 2, requires submission of an inspection plan for the reactor internals for review and approval
  • Due 24 months prior to entering the periods of extended operation

- Unit 1 PEO begins January 16, 2027

- Unit 2 PEO begins February 8, 2029

- VEGP 1&2 submittal is planned for January 15, 2025 3

Vogtle Unit 1 and 2 Reactor Internals Inspection Plan History

  • NRC adopted generic strategy in EPRI Material Reliability Program (MRP)

- MRP-227 Rev 1-A NRC approved

- MRP-227 Rev 2 is currently under NRC review

  • Vogtle current inspection plans are compliant with MRP-227 Revision 1-A

- Appendix B requires an applicability assessment to ensure that the plant has operated within the specific operational requirements post 30-years of operation

  • Vogtle meets the conditions in Appendix B
  • Commitment Specifies to address thermal sleeve and core support lug aging:

- Thermal sleeve aging management is in compliance with materials initiative requirements in PWROG-16003, Rev. 2, Appendix A.

- Core support lugs are inspected in accordance with ASME Section XI 10-year B-N visual examinations 4

Vogtle Unit 1 and 2 Reactor Internals Inspection Plan Southern Nuclear Operating Company (SNC) believes that there is not a need for additional staff review and approval of the technical details and/or basis for the VEGP Units 1 and 2 plant specific inspection plans because the technical basis for the scope, periodicity, nondestructive examination requirements, and acceptance criteria are all now generically approved through MRP-227 Revision 1-A.

MRP-227 Revision 2 is currently under review by the NRC. Once approved, Vogtle will update to this revision as outlined in the schedule provided by the EPRI MRP.

Licensing action items associated with Revision 1-A will not be evaluated due to these no longer being required with the expected approval of MRP-227 Revision 2.

SNC intends to outline the above details to satisfy license renewal commitment item no. 20 of NUREG 1920 5

Conclusion The planned submittal fulfills the intent of commitment item 20 from NUREG-1920 When MRP-227 Rev 2 is approved, Vogtle will update its Vogtle Reactor Internals Strategic Plan in accordance with the schedule provided by the EPRI MRP.

If guidance is not implemented in accordance with MRP-227 Rev 2, SNC will submit a deviation in accordance with NEI 03-08.

6

Actions Remaining Actions and Schedule

  • Submittal to NRC 1/15/2025 7

Discussion / Feedback 8