Rod Penfield Site Vice President Vistra Operations Company, LLC Perry Nuclear Power Plant 10 Center Road, P.O. Box 97 Perry, OH 44081
SUBJECT:
PERRY NUCLEAR POWER PLANT UNIT 1 - REQUEST FOR INFORMATION FOR AN NRC SITE INSPECTION FOR PLANTS WITH A TIMELY RENEWAL APPLICATION INSPECTION REPORT 05000440/2025010
Dear Rod Penfield:
On March 25, 2025, the U.S. Nuclear Regulatory Commission (NRC) will begin a Site Inspection for License Renewal Phase 1 at Perry Nuclear Power Plant (NPP) Unit 1. This inspection will be performed in accordance with NRC Inspection Procedure (IP) 71013. This inspection will focus on outage related activities to verify a sample of license renewal commitments have been implemented.
To minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for information needed for the inspection. It is important that all these documents are up to date and complete to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection.
This information should be provided electronically to the inspector. The information request has been divided into two groups:
The first group lists information necessary for our initial inspection scoping and in-office preparation activities. During the in-office preparation activities, the inspector will identify as much as possible the information and activities to be reviewed during the inspection.
This information should be provided to the inspector by February 24, 2025.
The second group includes the additional information required for the inspector to review the selected activities. This information should be available to the inspector March 10, 2025.
The lead inspector for this license renewal inspection is Mr. Matthew Domke. We understand that our primary contact for this inspection is Mr. George Dujanovic of your organization. If there are any questions about the inspection or the material requested in the enclosure, please contact the inspector at (630) 829-9562 or via email at Matthew.Domke@nrc.gov.
December 9, 2024
R. Penfield 2
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS), accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely, Matthew Domke, Senior Reactor Inspector Engineering Reactor Projects Branch Division of Operating Reactor Safety Docket No. 05000440 License No. NPF-58
Enclosure:
Document Request for Site Inspection for Plants with a Timely Renewal Application cc w/encl: Distribution via LISTSERV Signed by Domke, Matthew on 12/09/24
R. Penfield 3
Letter to Rod Penfield from Matthew Domke dated December 09, 2024.
SUBJECT:
PERRY NUCLEAR POWER PLANT UNIT 1 - REQUEST FOR INFORMATION FOR AN NRC SITE INSPECTION FOR PLANTS WITH A TIMELY RENEWAL APPLICATION INSPECTION REPORT 05000440/2025010 DISTRIBUTION:
Robert Ruiz RidsNrrPMPerry Resource RidsNrrDorlLpl3 RidsNrrDroIrib Resource Jack Giessner Mohammed Shuaibi Diana Betancourt-Roldan Allan Barker David Curtis Jonathan Feibus R3-DORS ADAMS Accession Number: ML24344A115 Publicly Available Non-Publicly Available Sensitive Non-Sensitive OFFICE RIII NAME MDomke:anm DATE 12/09/2024 OFFICIAL RECORD COPY
DOCUMENT REQUEST FOR SITE INSPECTION FOR PLANTS WITH A TIMELY RENEWAL Enclosure Inspection Report: 05000440/2025010 Inspection Dates:
March 17, 2025 - March 28, 2025 Inspection Procedure:
IP 71013 Site Inspection for Plants with a Timely Renewal Application, Revision 06/26/2023 Inspector:
Matthew Domke (630) 829-9562 Matthew.Domke@nrc.gov I.
Information Requested Prior to the On-Site Inspection Week by February 24, 2025 If you have any questions regarding this information, please call the inspector as soon as possible. File names should be descriptive and indexed to facilitate ease of use.
Information lists should contain enough information to be easily understood by someone who has knowledge of light water reactor technology.
1.
Provide a list of your license renewal commitments with an approximate completion status of each.
2.
Provide a list of your Aging Management Programs (AMPs), copies of the program basis document for each, and a listing of the action tracking items for each.
3.
For AMPS that are one-time inspection programs, provide a list of completed work order numbers for inspections that have been completed. This may be incorporated with the previous item and should include identification of the inspected component.
4.
Provide a list of the one-time inspections credited for license renewal that will be completed during your outage. This list should include at least the system, component, work order number, and type of inspection.
5.
Provide a listing of other planned inspections which will be conducted during the outage, that are credited for license renewal. Of particular interest are those that provide observations of areas that are generally inaccessible at power, e.g., tank internal inspections, drywell liner inspections, and containment coating inspections. Include work order numbers where applicable.
6.
Provide an outage schedule, sufficiently detailed as to list the work orders noted in Items 4 and 5.
2 7.
Provide current management and license renewal organizational charts.
8.
Provide electronic copies of Updated Final Safety Analysis Report, Technical Specifications, Technical Specifications Bases, and Technical Requirements Manual.
9.
Provide copies of any internal/external self-assessments and associated corrective action documents generated in preparation for the inspection, as applicable.
II.
Information Requested to be Available for Inspection Preparation Week on March 10, 2025 1.
Copies of the work orders requested prior to inspection preparation week. This will include work orders of inspections to be observed and completed work orders to be reviewed by the inspector.
2.
Updated documentation demonstrating completion of license renewal commitment which are completed until the inspection preparation week.
For example, this may be in the form of a binder for each commitment which includes the implementing documentation and references.
III.
Information Requested to be Provided Throughout the Inspection 1.
Copies of any corrective action documents generated because of the inspectors questions or queries during this inspection.
2.
Copies of the list of questions submitted by the inspector and the status/resolution of the information requested (please provide daily through the inspection period).
If you have questions regarding the information requested, please contact the inspector.