ML24340A024

From kanterella
Jump to navigation Jump to search
Updated Safety Analysis Report Rev.28, Chapter 16, Technical Specification
ML24340A024
Person / Time
Site: River Bend Entergy icon.png
Issue date: 07/30/2023
From: James Drake
NRC/NRR/DORL/LPL4
To:
Entergy Nuclear Operations
References
Download: ML24340A024 (1)


Text

RBS USAR Revision 27 16.1-1 CHAPTER 16 TECHNICAL SPECIFICATIONS The technical specifications are provided under separate cover.

Section 16.1 - TSTF based Commitments Section 16.2 - System Mission Times

RBS USAR Revision 27 16.1-2 16.1 - TSTF based Commitments The following are commitments required by amendments based upon standards TSTFs.

TSTF Number Commitment Notes As discussed in the notice of availability published in the Federal Register for these TS improvements, plant-specific regulatory commitments are made.

423 As approved by the NRC in Amendment 185.

(Entergy will follow the guidance of)

NUMARC 93-01 Section 11, which provides guidance and details on the assessment and management of risk during maintenance.

Entergy has previously committed to this guidance as included in the application for TSTF-427 and approved by the NRC in Amendment 173, therefore, no new commitment is required.

Entergy will follow the guidance established in TSTF-IG-05-02 Implementation Guidance for TSTF-423, Revision 2, Technical Specification End States, NEDC-32988-A.

16.2 - System Mission Times System mission times are contained in Design Criteria 245.600, Operability Time for Class 1E Equipment.

RBS USAR Revision 27 16A-1 APPENDIX 16A TECHNICAL REQUIREMENTS MANUAL The technical requirements are provided under separate cover in the Technical Requirements Manual of the RBS Operating Licensing Manual.