Summary of Changes and Analysis for Revision 21 of Plant Procedures Manual 13.2.2, Determining Protective Action Recommendations
ML24337A175
Person / Time
Site: Columbia 
Issue date: 11/25/2024
From: Dunham Z
Energy Northwest
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
GO2-24-123
Download: ML24337A175 (1)


Text

November 25, 2024 ENERGY NORTHWEST GO2-24-123 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 205551 Zachary K. Dunham Columbia Generating Station P.O. Box 968, PE20 Richland, WA 99352-0968 Ph. 509.377.4735 zkdunham@energy-northwest.com 10 CFR 50.54(q)

Subject:

COLUMBIA GENERATING STATION, DOCKET NO. 50-397

SUMMARY

OF CHANGES AND ANALYSIS FOR REVISION 21 OF PLANT PROCEDURES MANUAL 13.2.2, DETERMINING PROTECTIVE ACTION RECOMMENDATIONS

Dear Sir or Madam:

Enclosed is the summary of changes and analysis for Revision 21 of Plant Procedures Manual (PPM) 13.2.2, Determining Protective Action Recommendations, issued on November 21, 2024. The changes to the PPM have been evaluated in accordance with 10 CFR 50.54(q) and 10 CFR 72.44(f). The PPM, as revised, continues to meet the standards of 10 CFR 50.47(b) and the requirements of 10 CFR 50 Appendix E.

The Enclosure contains a summary of changes and evaluations performed. Each change was evaluated in accordance with the station's 10 CFR 50.54(q) evaluation process. These changes do not create a reduction in effectiveness of the approved emergency plan.

This submittal contains no new or revised regulatory commitments. Should you have any questions or desire additional information regarding these matters, please contact Ms. Jennifer Kuklinski at (509) 377-4133.

Executed on the 2S-day of

/Je>\lf..Ml'!/E/'2

, 2024.

Respectfully,

~A'~

Zachary K. Dunham Manager, Regulatory Affairs

Enclosure:

Summary of Changes and Analysis cc:

NRC Region IV Administrator NRC NRR Project Manager NRC Sr. Resident Inspector/ 988C Director - Spent Fuel Storage & Transportation, NMSS CD Sonoda, BPA

G02-24-123 Enclosure Page 1 of 1 Summary of Changes and Analysis Revision 21 to Plant Procedure Manual (PPM) 13.2.1, Determining Protective Action Recommendations, was made to remove a Discrepancy between PPM 13.2.2 and 13.1.1A. Changes made as follows:

Page Description of change 15 Note 1 step 3 a. replaced "and" with "or" to align with PPM 13.1.1 "Classifying the Emergency" and PPM 13.1.1 a "Classifying the Emergency-Technical Basis".

These changes do not reduce the effectiveness of the Emergency Plan and the plan continues to meet the requirements in appendix §50 Appendix E and the planning standards of§ 50.47(b)(9) and RG 1.219.

These changes do not represent a negative impact to either timeliness or capability, therefore there is no reduction in effectiveness to implement the Emergency Plan.