ML24324A050

From kanterella
Jump to navigation Jump to search
Comment (23) E-mail Regarding Diablo Canyon Lr Draft EIS
ML24324A050
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 11/18/2024
From: Public Commenter
Public Commenter
To:
NRC/NMSS/DREFS
NRC/NMSS/DREFS
References
89FR87433
Download: ML24324A050 (2)


Text

From:

bonesjazz0@gmail.com Sent:

Monday, November 18, 2024 6:57 PM To:

DiabloCanyonEnvironmental.Resource

Subject:

[External_Sender] CLOSE DIABLO NOW!!!

SEISMIC PG&Es seismic update is deficient. The Independent Peer Review Panel (IPRP) of the CA Public Utilities Commission refused to endorse PG&Es latest seismic assessment, stating that PG&E had not done a thorough job. The NRC should demand rigorous, peer-reviewed seismic analysis from PG&E, approved by the IPRP.

The SEIS does not consider the findings of Dr. Peter Bird, Professor Emeritus Department of Earth, Planetary, and Space Sciences, University of California Los Angeles, who has estimated that the chances of an earthquake causing core damage at Diablo Canyon is 47 times higher than PG&Es estimate. The NRC should examine and evaluate Dr. Birds findings.

New seismic evidence shows that the earthquake faults that run directly under the plant are vertical thrust faults, meaning they could cause much more ground motion than formerly thought possible. PG&E significantly underestimates the likelihood of a severe earthquake at Diablo Canyon.

EMBRITTLEMENT Unit 1s reactor vessel was built with faulty material, so its vulnerable to embrittlement. An embrittled reactor vessel can shatter like glass and cause a catastrophic meltdown. Despite this, PG&E has not test for embrittlement for over 20 years - and the NRC has approved the exemptions.

EVACUATION The SEIS estimates that in a radioactive release from Diablo Canyon, evacuation will take place within 101 minutes for the first cohort and 176 minutes for the second cohort, assuming a 5.6 mph speed for the first cohort and 4.0 mph for the second cohort. These estimates are fatuous, and the NRC should reject them. The NRC should demand updated traffic studies, and the traffic studies should be conducted in a real time situation.

AGRICULTURE and ECONOMIC DATA Site-specific agricultural and economic data were used by PG&E from 2012. These data are outdated, and the NRC should demand updated analysis.

ENDANGERED SPECIES Numerous federally-listed species under the U.S. Fish and Wildlife Service have been found at the Diablo Canyon site. Continued operation of the plant for an additional 20 years would place undue burden on these endangered species. The NRC should choose the no-action alternative to preserve the biodiversity of the Diablo Canyon site.

MARINE ENVIRONMENT Diablos Once-Through Cooling Water System is out of compliance with the Clean Water Act. The facility circulates 2.5 billion gallons of seawater each day, releasing it back into the ocean 20º warmer and killing more than one billion fish in their early life stages.

RADIOACTIVE WASTE Extended operation of Diablo Canyon means the generation and onsite storage of even more high-level radioactive waste in an active earthquake area.

COSTLY AND UNNECESSARY Mothers for Peace experts have demonstrated that Diablo is not needed to "keep the lights on" due to recently added battery storage. PG&E estimates that California utility customers will pay about $7.6 billion to extend Diablo Canyon's operations through 2030, and state and federal programs are subsidizing an additional $1.2 billion

Federal Register Notice:

89FR87433 Comment Number:

23 Mail Envelope Properties (01b901db3a15$929a94d0$b7cfbe70$)

Subject:

[External_Sender] CLOSE DIABLO NOW!!!

Sent Date:

11/18/2024 6:57:05 PM Received Date:

11/18/2024 6:57:15 PM From:

bonesjazz0@gmail.com Created By:

bonesjazz0@gmail.com Recipients:

"DiabloCanyonEnvironmental.Resource" <DiabloCanyonEnvironmental.Resource@nrc.gov>

Tracking Status: None Post Office:

gmail.com Files Size Date & Time MESSAGE 3106 11/18/2024 6:57:15 PM Options Priority:

Normal Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date: