Notification of Age Related Degradation Inspection (05000313/2025011 and 05000368/2025011) and Request for Information
ML24323A236
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 11/19/2024
From: Vincent Gaddy
NRC/RGN-IV/DORS/EB1
To: Pehrson D
Entergy Operations
Gaddy V
References
IR 2025011
Download: ML24323A236 (7)


See also: IR 05000313/2025011

Text

November 19, 2024

Doug Pehrson, Site Vice President

Entergy Operations, Inc.

N-TSB-58

1448 S.R. 333

Russellville, AR 72802-0967

SUBJECT:

ARKANSAS NUCLEAR ONE - NOTIFICATION OF AGE-RELATED

DEGRADATION INSPECTION (05000313/2025011 AND 05000368/2025011)

AND REQUEST FOR INFORMATION

Dear Doug Pehrson:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

staff will conduct the IP 71111.21N.04, Age-Related Degradation baseline inspection at

Arkansas Nuclear One, Units 1 and 2, beginning on March 24, 2025. The inspection team will

be led by Wes Cullum from the NRC Region 4 Office. The team will be composed of three

personnel from the NRC Region 4 Office. The inspection will be conducted in accordance with

IP 71111.21N.04.

The inspection will include an onsite information gathering visit by the team lead and two weeks

of onsite inspection by the team. The schedule for the inspection is as follows:

Onsite Information Gathering Visit: January 21-23, 2025

Offsite Preparation Week: March 17-20, 2025

Onsite Inspection Weeks: March 24-27, 2025, and April 7-10, 2025

The purpose of the information gathering visit is to become familiar with the station

maintenance, surveillance, testing, inspection, and condition monitoring programs, become

familiar with plant layout, support identification of structures, systems, and components (SSCs)

that will be reviewed during the inspection, and, as necessary, obtain plant specific site access

training and badging for unescorted site access. An initial list of documents that the team will

review during the information gathering visit are listed in enclosure 1.

During the information gathering visit, the team will also discuss the following inspection support

administrative details: office space size and location; specific documents requested to be made

available to the team in their office spaces; arrangements for reactor site access (including

radiation protection training, security, safety, and fitness for duty requirements); and the

availability of knowledgeable plant staff and licensing organization personnel to serve as points

of contact during the inspection.

D. Pehrson

2

For SSCs that the inspection will review, an initial list of the documents the team will review -

during the conduct of the inspection are listed in enclosure 2. (Enclosure 3 lists the team

members and their contact information.) The team leader will contact you with identified SSCs.

Also, personnel should be available at the site during the inspection who are knowledgeable

regarding maintenance, surveillance, testing, inspection, and condition monitoring programs.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, under Control Number

3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRC rules and practices, a copy of this letter and its

enclosures will be available electronically for public inspection in the NRC public document

room or from the publicly available records (PARS) component of NRCs document system

(ADAMS). ADAMS is accessible from the NRC Web site.

Your cooperation and support during this inspection will be appreciated. If you have questions

concerning this inspection, or the inspection team's information or logistical needs, please

contact Wes Cullum, the team leader, in the Region 4 Office at 817-200-1563.

Sincerely,

Vincent G. Gaddy, Chief

Engineering Branch 1

Division of Operating Reactor Safety

Docket Nos. 05000313 and 05000368

License Nos. DPR-51 and NPF-6

Enclosures:

1.

Documents Requested Prior to

Information Gathering Visit

2.

Documents Requested Prior to

Inspection Preparation Week

3.

Inspection Team Contact Information

cc w/ encl: Distribution via LISTSERV

Signed by Gaddy, Vincent

on 11/19/24

ML24323A236

X

SUNSI Review

By: WLC

X

Non-Sensitive

Sensitive

X

Publicly Available

Non-Publicly Available

OFFICE

SRI:DORS:EB1

BC:DORS:EB1

NAME

WCullum

VGaddy

SIGNATURE

/RA/

/RA/

DATE

11/18/24

11/19/24

Enclosure 1

Enclosure 1

Documents Requested Prior to Information Gathering Visit

The documents and information requested below should generally be made available to the

inspection team for the team's use both onsite and offsite during the information gathering visit.

Electronic format is the preferred media. If electronic media is made available via an internet

based remote document management system, then the remote document access must allow

inspectors to download, save, and print the documents in the NRC's regional office. Electronic

media on compact disc or paper records (hardcopy) are acceptable. At the end of the

inspection, the documents in the team's possession will not be retained.

This document request is based on typical documents that a generic plant might have. As such,

this document request is not meant to imply that any specific plant is required to have all the

listed documents. In addition, your plant-specific document titles may vary from the document

titles listed below. We also request that the information provided be sorted by the list below.

Documents requested by January 13, 2025:

1.

List of 50.65 (a)(1) SSCs from the past 5 years

2.

Site specific functional failures from the past 5 years

3.

Site specific performance indicators

4.

Site specific corrective actions associated with component failures, or tagged with

aging, age-related, wear, accelerated wear, abnormal wear, accelerated

degradation, abnormal degradation, etc.

5.

Part 21 Reports applicable to the site from the past 5 years

6.

Maintenance, surveillance, testing, inspection, and condition monitoring testing

requirements, acceptance criteria, and periodicities

7.

Bases documents associated with maintenance, surveillance, testing, inspection,

and condition monitoring testing requirements, acceptance criteria, and periodicities

8.

Maintenance rule scoping and performance criteria

9.

For licensees that implement 10 CFR 50.69:

a.

List of RISC-1, RISC-2, and RISC-3 SSCs

b.

Safety significant functions identified during the RISC categorization process,

and alternative treatment requirements

10.

For licensees in the period of extended operation (PEO):

a.

List of risk significant long-lived passive SSCs

b.

Aging management programs (AMPs)

2

11.

Copy of the updated final safety analysis report, technical specifications, and

technical requirements manual, including applicable bases documents.

12.

Sortable list of systems, including identifying designators and corresponding names.

13.

List of individuals who will be supporting the inspection and their contact information.

Enclosure 2

Enclosure 2

Documents Requested Prior to Inspection Preparation Week

For the samples identified by the team lead, the documents and information requested below

should generally be made available to the inspection team for the team's use both onsite and

offsite during the inspection. Electronic format is the preferred media. If electronic media is

made available via an internet based remote document management system, then the remote

document access must allow inspectors to download, save, and print the documents in the

NRC's regional office. Electronic media on compact disc or paper records (hardcopy) are

acceptable. At the end of the inspection, the documents in the team's possession will not be

retained.

This document request is based on typical documents that a generic plant might have. As such,

this document request is not meant to imply that any specific plant is required to have all the

listed documents. In addition, your plant-specific document titles may vary from the document

titles listed below. We also request that the information provided be sorted by the list below for

each sample.

Documents requested by March 10, 2025:

1.

Self-imposed vendor recommendations

2.

Site specific probabilistic risk assessment (PRA) identifying risk-significant functions

3.

Last two years of maintenance, surveillance, testing, inspection, and condition

monitoring testing results. For periodicities greater than two years, the last two test

results

4.

Technical specification operability determinations

5.

Actions taken for issues identified during performance of maintenance, surveillance,

testing, inspection, and condition monitoring

6.

Last evaluation of maintenance effectiveness required per 10 CFR 50.65(a)(3)

7.

For licensees that implement 10 CFR 50.69, last feedback and process adjustment

required per 10 CFR 50.69(e)(1)

8.

For licensees in the PEO, any on-going reviews of both plant-specific and industry

operating experience performed in the last two years that informed or enhanced

AMPs

Enclosure 3

Enclosure 3

Inspection Team Contact Information

Wes Cullum

Senior Reactor Inspector

817-200-1563

Wes.cullum@nrc.gov

Rayo Kumana

Senior Reactor Inspector

817-200-1426

Rayomand.kumana@nrc.gov

Diana Stagner

Reactor Inspector

817-200-1278

Diana.stagner@nrc.gov

Mailing Address:

U.S. NRC, Region IV

Attn: Wes Cullum

1600 East Lamar Blvd.

Arlington, TX 76011-4511