November 19, 2024
Doug Pehrson, Site Vice President
Entergy Operations, Inc.
N-TSB-58
1448 S.R. 333
Russellville, AR 72802-0967
SUBJECT:
ARKANSAS NUCLEAR ONE - NOTIFICATION OF AGE-RELATED
DEGRADATION INSPECTION (05000313/2025011 AND 05000368/2025011)
AND REQUEST FOR INFORMATION
Dear Doug Pehrson:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
staff will conduct the IP 71111.21N.04, Age-Related Degradation baseline inspection at
Arkansas Nuclear One, Units 1 and 2, beginning on March 24, 2025. The inspection team will
be led by Wes Cullum from the NRC Region 4 Office. The team will be composed of three
personnel from the NRC Region 4 Office. The inspection will be conducted in accordance with
The inspection will include an onsite information gathering visit by the team lead and two weeks
of onsite inspection by the team. The schedule for the inspection is as follows:
Onsite Information Gathering Visit: January 21-23, 2025
Offsite Preparation Week: March 17-20, 2025
Onsite Inspection Weeks: March 24-27, 2025, and April 7-10, 2025
The purpose of the information gathering visit is to become familiar with the station
maintenance, surveillance, testing, inspection, and condition monitoring programs, become
familiar with plant layout, support identification of structures, systems, and components (SSCs)
that will be reviewed during the inspection, and, as necessary, obtain plant specific site access
training and badging for unescorted site access. An initial list of documents that the team will
review during the information gathering visit are listed in enclosure 1.
During the information gathering visit, the team will also discuss the following inspection support
administrative details: office space size and location; specific documents requested to be made
available to the team in their office spaces; arrangements for reactor site access (including
radiation protection training, security, safety, and fitness for duty requirements); and the
availability of knowledgeable plant staff and licensing organization personnel to serve as points
of contact during the inspection.
D. Pehrson
2
For SSCs that the inspection will review, an initial list of the documents the team will review -
during the conduct of the inspection are listed in enclosure 2. (Enclosure 3 lists the team
members and their contact information.) The team leader will contact you with identified SSCs.
Also, personnel should be available at the site during the inspection who are knowledgeable
regarding maintenance, surveillance, testing, inspection, and condition monitoring programs.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, under Control Number
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a
request for information or an information collection requirement unless the requesting document
displays a currently valid Office of Management and Budget control number.
In accordance with 10 CFR 2.390 of the NRC rules and practices, a copy of this letter and its
enclosures will be available electronically for public inspection in the NRC public document
room or from the publicly available records (PARS) component of NRCs document system
(ADAMS). ADAMS is accessible from the NRC Web site.
Your cooperation and support during this inspection will be appreciated. If you have questions
concerning this inspection, or the inspection team's information or logistical needs, please
contact Wes Cullum, the team leader, in the Region 4 Office at 817-200-1563.
Sincerely,
Vincent G. Gaddy, Chief
Engineering Branch 1
Division of Operating Reactor Safety
Docket Nos. 05000313 and 05000368
Enclosures:
1.
Documents Requested Prior to
Information Gathering Visit
2.
Documents Requested Prior to
Inspection Preparation Week
3.
Inspection Team Contact Information
cc w/ encl: Distribution via LISTSERV
Signed by Gaddy, Vincent
on 11/19/24
X
SUNSI Review
By: WLC
X
Non-Sensitive
Sensitive
X
Publicly Available
Non-Publicly Available
OFFICE
SRI:DORS:EB1
BC:DORS:EB1
NAME
WCullum
VGaddy
SIGNATURE
/RA/
/RA/
DATE
11/18/24
11/19/24
Enclosure 1
Enclosure 1
Documents Requested Prior to Information Gathering Visit
The documents and information requested below should generally be made available to the
inspection team for the team's use both onsite and offsite during the information gathering visit.
Electronic format is the preferred media. If electronic media is made available via an internet
based remote document management system, then the remote document access must allow
inspectors to download, save, and print the documents in the NRC's regional office. Electronic
media on compact disc or paper records (hardcopy) are acceptable. At the end of the
inspection, the documents in the team's possession will not be retained.
This document request is based on typical documents that a generic plant might have. As such,
this document request is not meant to imply that any specific plant is required to have all the
listed documents. In addition, your plant-specific document titles may vary from the document
titles listed below. We also request that the information provided be sorted by the list below.
Documents requested by January 13, 2025:
1.
List of 50.65 (a)(1) SSCs from the past 5 years
2.
Site specific functional failures from the past 5 years
3.
Site specific performance indicators
4.
Site specific corrective actions associated with component failures, or tagged with
aging, age-related, wear, accelerated wear, abnormal wear, accelerated
degradation, abnormal degradation, etc.
5.
Part 21 Reports applicable to the site from the past 5 years
6.
Maintenance, surveillance, testing, inspection, and condition monitoring testing
requirements, acceptance criteria, and periodicities
7.
Bases documents associated with maintenance, surveillance, testing, inspection,
and condition monitoring testing requirements, acceptance criteria, and periodicities
8.
Maintenance rule scoping and performance criteria
9.
For licensees that implement 10 CFR 50.69:
a.
List of RISC-1, RISC-2, and RISC-3 SSCs
b.
Safety significant functions identified during the RISC categorization process,
and alternative treatment requirements
10.
For licensees in the period of extended operation (PEO):
a.
List of risk significant long-lived passive SSCs
b.
Aging management programs (AMPs)
2
11.
Copy of the updated final safety analysis report, technical specifications, and
technical requirements manual, including applicable bases documents.
12.
Sortable list of systems, including identifying designators and corresponding names.
13.
List of individuals who will be supporting the inspection and their contact information.
Enclosure 2
Enclosure 2
Documents Requested Prior to Inspection Preparation Week
For the samples identified by the team lead, the documents and information requested below
should generally be made available to the inspection team for the team's use both onsite and
offsite during the inspection. Electronic format is the preferred media. If electronic media is
made available via an internet based remote document management system, then the remote
document access must allow inspectors to download, save, and print the documents in the
NRC's regional office. Electronic media on compact disc or paper records (hardcopy) are
acceptable. At the end of the inspection, the documents in the team's possession will not be
retained.
This document request is based on typical documents that a generic plant might have. As such,
this document request is not meant to imply that any specific plant is required to have all the
listed documents. In addition, your plant-specific document titles may vary from the document
titles listed below. We also request that the information provided be sorted by the list below for
each sample.
Documents requested by March 10, 2025:
1.
Self-imposed vendor recommendations
2.
Site specific probabilistic risk assessment (PRA) identifying risk-significant functions
3.
Last two years of maintenance, surveillance, testing, inspection, and condition
monitoring testing results. For periodicities greater than two years, the last two test
results
4.
Technical specification operability determinations
5.
Actions taken for issues identified during performance of maintenance, surveillance,
testing, inspection, and condition monitoring
6.
Last evaluation of maintenance effectiveness required per 10 CFR 50.65(a)(3)
7.
For licensees that implement 10 CFR 50.69, last feedback and process adjustment
required per 10 CFR 50.69(e)(1)
8.
For licensees in the PEO, any on-going reviews of both plant-specific and industry
operating experience performed in the last two years that informed or enhanced
Enclosure 3
Enclosure 3
Inspection Team Contact Information
Senior Reactor Inspector
817-200-1563
Wes.cullum@nrc.gov
Senior Reactor Inspector
817-200-1426
Rayomand.kumana@nrc.gov
Diana Stagner
Reactor Inspector
817-200-1278
Diana.stagner@nrc.gov
Mailing Address:
U.S. NRC, Region IV
Attn: Wes Cullum
1600 East Lamar Blvd.
Arlington, TX 76011-4511