Emails to Tribes Requesting Comment on Cultural and Historic Sections of EA for Proposed Groundwater Treatment at Cimarron Site
ML24316A014
Person / Time
Site: 07000925
Issue date: 09/03/2024
From: Christine Pineda
NRC/NMSS/DREFS/EPMB2
To:
References
Download: ML24316A014 (1)


Text

From:

Christine Pineda (She/Her)

To:

ewhitehorn@omtribe.org; jshotton@omtribe.org

Subject:

For Review regarding Cimarron Site: Environmental Assessment Documentation Pertaining to Section 106 of the National Historic Preservation Act Date:

Tuesday, September 3, 2024 11:22:50 AM Attachments:

Draft EA Sections on Cultural and Historic Resources - ML24236A704.pdf image001.png Greetings,

The purpose of this email is to provide an update on U.S. Nuclear Regulatory Commission (NRC) regulatory activities for the site of the former Cimarron nuclear fuel fabrication facility in Logan County, Oklahoma (Cimarron site). The NRC previously sent letters and emails about the Cimarron site, and our most recent update to the Otoe-Missouria Tribe was sent by email on June 9, 2023.

As part of the environmental review for the NRCs review of the proposed groundwater treatment at the site, the NRC staff is preparing an environmental assessment (EA) under the National Environmental Policy Act of 1969, as amended. The NRC staff is soliciting comments on the historic and cultural resources sections of the draft EA and findings under Section 106 of the National Historic Preservation Act. I have attached the information to this email. This information can also be found on the NRCs project web page: https://www.nrc.gov/info-finder/decommissioning/complex/kerr-mcgee-cimarron-corporation-former-fuel-fabrication-facility.html. If you would like to submit a comment on the attached information, please submit it Christine.Pineda@nrc.gov by September 27, 2024. If you have any questions, please reply to this email or call 301-415-6789.

If you no longer wish to receive updates from the NRC about this site, please let me know by replying to this email.

Kind Regards, Christine

Christine Pineda Environmental Project Manager U.S. Nuclear Regulatory Commission Christine.Pineda@nrc.gov 301-415-6789

From:

Christine Pineda (She/Her)

To:

tonya@shawnee-tribe.com

Subject:

For Review regarding Cimarron Site: Environmental Assessment Documentation Pertaining to Section 106 of the National Historic Preservation Act Date:

Tuesday, September 3, 2024 11:20:01 AM Attachments:

Draft EA Sections on Cultural and Historic Resources - ML24236A704.pdf image002.png Greetings,

The purpose of this email is to provide an update on U.S. Nuclear Regulatory Commission (NRC) regulatory activities for the site of the former Cimarron nuclear fuel fabrication facility in Logan County, Oklahoma (Cimarron site). The NRC previously sent letters and emails about the Cimarron site, and our most recent update to the Shawnee Tribe was sent by email on June 9, 2023.

As part of the environmental review for the NRCs review of the proposed groundwater treatment at the site, the NRC staff is preparing an environmental assessment (EA) under the National Environmental Policy Act of 1969, as amended. The NRC staff is soliciting comments on the historic and cultural resources sections of the draft EA and findings under Section 106 of the National Historic Preservation Act. I have attached the information to this email. This information can also be found on the NRCs project web page: https://www.nrc.gov/info-finder/decommissioning/complex/kerr-mcgee-cimarron-corporation-former-fuel-fabrication-facility.html. If you would like to submit a comment on the attached information, please submit it Christine.Pineda@nrc.gov by September 27, 2024. If you have any questions, please reply to this email or call 301-415-6789.

If you no longer wish to receive updates from the NRC about this site, please let me know by replying to this email.

Kind Regards, Christine

Christine Pineda Environmental Project Manager U.S. Nuclear Regulatory Commission Christine.Pineda@nrc.gov 301-415-6789

From:

Christine Pineda (She/Her)

To:

106notifications@ponca-nsn.gov; liana.hesler@ponca-nsn.gov; poncatribeoem@gmail.com; carla.carney@ponca.com

Subject:

For Review regarding Cimarron Site: Environmental Assessment Documentation Pertaining to Section 106 of the National Historic Preservation Act Date:

Tuesday, September 3, 2024 11:17:03 AM Attachments:

image002.png Cimarron Site Location.pdf Greetings,

The purpose of this email is to provide an update on U.S. Nuclear Regulatory Commission (NRC) regulatory activities for the site of the former Cimarron nuclear fuel fabrication facility in Logan County, Oklahoma (Cimarron site). The NRC previously sent letters and emails about the Cimarron site, and our most recent update to the Ponca Tribe was sent by email on June 9, 2023.

As part of the environmental review for the NRCs review of the proposed groundwater treatment at the site, the NRC staff is preparing an environmental assessment (EA) under the National Environmental Policy Act of 1969, as amended. The NRC staff is soliciting comments on the historic and cultural resources sections of the draft EA and findings under Section 106 of the National Historic Preservation Act. I have attached the information to this email. This information can also be found on the NRCs project web page: https://www.nrc.gov/info-finder/decommissioning/complex/kerr-mcgee-cimarron-corporation-former-fuel-fabrication-facility.html. If you would like to submit a comment on the attached information, please submit it Christine.Pineda@nrc.gov by September 27, 2024. If you have any questions, please reply to this email or call 301-415-6789.

If you no longer wish to receive updates from the NRC about this site, please let me know by replying to this email.

Kind Regards, Christine

Christine Pineda Environmental Project Manager U.S. Nuclear Regulatory Commission Christine.Pineda@nrc.gov 301-415-6789

From:

Christine Pineda (She/Her)

To:

jreed@pawneenation.org; cbutler@pawneenation.org

Subject:

For Review regarding Cimarron Site: Environmental Assessment Documentation Pertaining to Section 106 of the National Historic Preservation Act Date:

Tuesday, September 3, 2024 10:57:04 AM Attachments:

image002.png Draft EA Sections on Cultural and Historic Resources - ML24236A704.pdf Greetings,

The purpose of this email is to provide an update on U.S. Nuclear Regulatory Commission (NRC) regulatory activities related to the former Cimarron nuclear fuel fabrication facility in Logan County, Oklahoma (Cimarron Site). The NRC previously sent letters and emails about the Cimarron Site, and our most recent update to the Pawnee Nation was sent by email on June 9, 2023.

As part of the environmental review for the NRCs review of the proposed groundwater treatment at the site, the NRC staff is preparing an environmental assessment (EA) under the National Environmental Policy Act of 1969, as amended. The NRC staff is soliciting comments on the historic and cultural resources sections of the draft EA and findings under Section 106 of the National Historic Preservation Act. I have attached the information to this email. This information can also be found on the NRCs project web page: https://www.nrc.gov/info-finder/decommissioning/complex/kerr-mcgee-cimarron-corporation-former-fuel-fabrication-facility.html. If you would like to submit a comment on the attached information, please submit it Christine.Pineda@nrc.gov by September 27, 2024. If you have any questions, please reply to this email or call 301-415-6789.

If you no longer wish to receive updates from the NRC about this site, please let me know by replying to this email.

Kind Regards, Christine

Christine Pineda Environmental Project Manager U.S. Nuclear Regulatory Commission Christine.Pineda@nrc.gov 301-415-6789

From:

Christine Pineda (She/Her)

To:

gary.mcadams@wichitatribe.com

Subject:

For Review regarding Cimarron Site: Environmental Assessment Documentation Pertaining to Section 106 of the National Historic Preservation Act Date:

Tuesday, September 3, 2024 10:45:22 AM Attachments:

image002.png Draft EA Sections on Cultural and Historic Resources - ML24236A704.pdf Greetings,

The purpose of this email is to provide an update on U.S. Nuclear Regulatory Commission (NRC) regulatory activities related to the former Cimarron nuclear fuel fabrication facility in Logan County, Oklahoma (Cimarron Site). The NRC previously sent letters and emails about the Cimarron Site, and our most recent update to the Wichita and Affiliated Tribes was sent by email on June 9, 2023.

As part of the environmental review for the NRCs review of the proposed groundwater treatment at the site, the NRC staff is preparing an environmental assessment (EA) under the National Environmental Policy Act of 1969, as amended. The NRC staff is soliciting comments on the historic and cultural resources sections of the draft EA and findings under Section 106 of the National Historic Preservation Act. I have attached the information to this email. This information can also be found on the NRCs project web page: https://www.nrc.gov/info-finder/decommissioning/complex/kerr-mcgee-cimarron-corporation-former-fuel-fabrication-facility.html. If you would like to submit a comment on the attached information, please submit it Christine.Pineda@nrc.gov by September 27, 2024. If you have any questions, please reply to this email or call 301-415-6789.

If you no longer wish to receive updates from the NRC about this site, please let me know by replying to this email.

Kind Regards, Christine

Christine Pineda Environmental Project Manager U.S. Nuclear Regulatory Commission Christine.Pineda@nrc.gov 301-415-6789

From:

Christine Pineda (She/Her)

To:

ascott@iowanation.org; jkeyes@iowanation.org

Subject:

For Review regarding Cimarron Site: Environmental Assessment Documentation Pertaining to Section 106 of the National Historic Preservation Act Date:

Tuesday, September 3, 2024 10:21:54 AM Attachments:

Draft EA Sections on Cultural and Historic Resources - ML24236A704.pdf image002.png Greetings,

The purpose of this email is to provide an update on U.S. Nuclear Regulatory Commission (NRC) regulatory activities related to the former Cimarron nuclear fuel fabrication facility in Logan County, Oklahoma (Cimarron Site). The NRC previously sent letters and emails about the Cimarron Site, and our most recent update to the Iowa Tribe of Oklahoma was sent by email on June 9, 2023 (to Mr.

Walkup and Ms. Wiley).

As part of the environmental review for the NRCs review of the proposed groundwater treatment at the site, the NRC staff is preparing an environmental assessment (EA) under the National Environmental Policy Act of 1969, as amended. The NRC staff is soliciting comments on the historic and cultural resources sections of the draft EA and findings under Section 106 of the National Historic Preservation Act. I have attached the information to this email. This information can also be found on the NRCs project web page: https://www.nrc.gov/info-finder/decommissioning/complex/kerr-mcgee-cimarron-corporation-former-fuel-fabrication-facility.html. If you would like to submit a comment on the attached information, please submit it Christine.Pineda@nrc.gov by September 27, 2024. If you have any questions or would like more information, please reply to this email or call me at 301-415-6789.

If you no longer wish to receive updates from the NRC about this site, please let me know by replying to this email.

Kind Regards, Christine

Christine Pineda Environmental Project Manager U.S. Nuclear Regulatory Commission Christine.Pineda@nrc.gov 301-415-6789

From:

Christine Pineda (She/Her)

To:

sclemons@wyandotte-nation.org; kgarcia@wyandotte-nation.org

Subject:

RE: For Review regarding Cimarron Site: Environmental Assessment Documentation Pertaining to Section 106 of the National Historic Preservation Act Date:

Friday, August 30, 2024 11:29:00 AM Attachments:

Draft EA Sections on Cultural and Historic Resources - ML24236A704.pdf image001.png Resending with the attachment.

From: Christine Pineda (She/Her) <Christine.Pineda@nrc.gov>

Sent: Friday, August 30, 2024 11:18 AM To: sclemons@wyandotte-nation.org; kgarcia@wyandotte-nation.org

Subject:

For Review regarding Cimarron Site: Environmental Assessment Documentation Pertaining to Section 106 of the National Historic Preservation Act

Greetings,

The purpose of this email is to provide an update on U.S. Nuclear Regulatory Commission (NRC) regulatory activities related to the former Cimarron nuclear fuel fabrication facility in Logan County, Oklahoma (Cimarron Site). The NRC previously sent letters and emails about the Cimarron Site, and our most recent update to the Wyandotte Nation was sent by email on June 9, 2023.

As part of the environmental review for the NRCs review of the proposed groundwater treatment at the site, the NRC staff is preparing an environmental assessment (EA) under the National Environmental Policy Act of 1969, as amended. The NRC staff is soliciting comments on the historic and cultural resources sections of the draft EA and findings under Section 106 of the National Historic Preservation Act. I have attached the information to this email. This information can also be found on the NRCs project web page: https://www.nrc.gov/info-finder/decommissioning/complex/kerr-mcgee-cimarron-corporation-former-fuel-fabrication-facility.html. If you would like to submit a comment on the attached information, please submit it Christine.Pineda@nrc.gov by September 27, 2024. If you have any questions, please reply to this email or call 301-415-6789.

If you no longer wish to receive updates from the NRC about this site, please let me know by replying to this email.

Kind Regards, Christine

Christine Pineda Environmental Project Manager U.S. Nuclear Regulatory Commission Christine.Pineda@nrc.gov 301-415-6789

From:

Christine Pineda (She/Her)

To:

fsat@fortsillapache-nsn.gov; lori.g.ware@fortsillapache-nsn.gov

Subject:

For Review regarding Cimarron Site: Environmental Assessment Documentation Pertaining to Section 106 of the National Historic Preservation Act Date:

Friday, August 30, 2024 11:28:18 AM Attachments:

Draft EA Sections on Cultural and Historic Resources - ML24236A704.pdf image002.png Greetings,

The purpose of this email is to provide an update on U.S. Nuclear Regulatory Commission (NRC) regulatory activities related to the former Cimarron nuclear fuel fabrication facility in Logan County, Oklahoma (Cimarron Site). The NRC previously sent letters and emails about the Cimarron Site, and our most recent update to the Fort Sill Apache Tribe was sent by email on June 9, 2023.

As part of the environmental review for the NRCs review of the proposed groundwater treatment at the site, the NRC staff is preparing an environmental assessment (EA) under the National Environmental Policy Act of 1969, as amended. The NRC staff is soliciting comments on the historic and cultural resources sections of the draft EA and findings under Section 106 of the National Historic Preservation Act. I have attached the information to this email. This information can also be found on the NRCs project web page: https://www.nrc.gov/info-finder/decommissioning/complex/kerr-mcgee-cimarron-corporation-former-fuel-fabrication-facility.html. If you would like to submit a comment on the attached information, please submit it Christine.Pineda@nrc.gov by September 27, 2024. If you have any questions, please reply to this email or call 301-415-6789.

If you no longer wish to receive updates from the NRC about this site, please let me know by replying to this email.

Kind Regards, Christine

Christine Pineda Environmental Project Manager U.S. Nuclear Regulatory Commission Christine.Pineda@nrc.gov 301-415-6789

From:

Christine Pineda (She/Her)

To:

wtarrant@sctribe.com

Subject:

For Review regarding Cimarron Site: Environmental Assessment Documentation Pertaining to Section 106 of the National Historic Preservation Act Date:

Friday, August 30, 2024 11:14:35 AM Attachments:

image002.png Draft EA Sections on Cultural and Historic Resources - ML24236A704.pdf Greetings,

The purpose of this email is to provide an update on U.S. Nuclear Regulatory Commission (NRC) regulatory activities related to the former Cimarron nuclear fuel fabrication facility in Logan County, Oklahoma (Cimarron Site). The NRC previously sent letters and emails about the Cimarron Site, and our most recent update to the Seneca-Cayuga Nation was sent by email on June 9, 2023.

As part of the environmental review for the NRCs review of the proposed groundwater treatment at the site, the NRC staff is preparing an environmental assessment (EA) under the National Environmental Policy Act of 1969, as amended. The NRC staff is soliciting comments on the historic and cultural resources sections of the draft EA and findings under Section 106 of the National Historic Preservation Act. I have attached the information to this email. This information can also be found on the NRCs project web page: https://www.nrc.gov/info-finder/decommissioning/complex/kerr-mcgee-cimarron-corporation-former-fuel-fabrication-facility.html. If you would like to submit a comment on the attached information, please submit it Christine.Pineda@nrc.gov by September 27, 2024. If you have any questions, please reply to this email or call 301-415-6789.

If you no longer wish to receive updates from the NRC about this site, please let me know by replying to this email.

Kind Regards, Christine

Christine Pineda Environmental Project Manager U.S. Nuclear Regulatory Commission Christine.Pineda@nrc.gov 301-415-6789

From:

Christine Pineda (She/Her)

To:

adawe.oto@gmail.com; rhonda.oto@gmail.com

Subject:

For Review regarding Cimarron Site: Environmental Assessment Documentation Pertaining to Section 106 of the National Historic Preservation Act Date:

Thursday, August 29, 2024 5:57:13 PM Attachments:

image002.png Draft EA Sections on Cultural and Historic Resources - ML24236A704.pdf Greetings,

The purpose of this email is to provide an update on U.S. Nuclear Regulatory Commission (NRC) regulatory activities related to the former Cimarron nuclear fuel fabrication facility in Logan County, Oklahoma (Cimarron Site). The NRC previously sent letters and emails about the Cimarron Site, and our most recent update to the Ottawa Tribe was sent by email on June 8, 2023.

As part of the environmental review for the NRCs review of the proposed groundwater treatment at the site, the NRC staff is preparing an environmental assessment (EA) under the National Environmental Policy Act of 1969, as amended. The NRC staff is soliciting comments on the historic and cultural resources sections of the draft EA and findings under Section 106 of the National Historic Preservation Act. I have attached the information to this email. This information can also be found on the NRCs project web page: https://www.nrc.gov/info-finder/decommissioning/complex/kerr-mcgee-cimarron-corporation-former-fuel-fabrication-facility.html. If you would like to submit a comment on the attached information, please submit it Christine.Pineda@nrc.gov by September 27, 2024. If you have any questions, please reply to this email or call 301-415-6789.

If you no longer wish to receive updates from the NRC about this site, please let me know by replying to this email.

Kind Regards, Christine

Christine Pineda Environmental Project Manager U.S. Nuclear Regulatory Commission Christine.Pineda@nrc.gov 301-415-6789

From:

Christine Pineda (She/Her)

To:

isham.t@sno-nsn.gov; yahola.b@sno-nsn.gov

Subject:

For Review regarding Cimarron Site: Environmental Assessment Documentation Pertaining to Section 106 of the National Historic Preservation Act Date:

Thursday, August 29, 2024 5:45:01 PM Attachments:

image001.png Draft EA Sections on Cultural and Historic Resources - ML24236A704.pdf Greetings,

The purpose of this email is to provide an update on U.S. Nuclear Regulatory Commission (NRC) regulatory activities related to the former Cimarron nuclear fuel fabrication facility in Logan County, Oklahoma (Cimarron Site). The NRC previously sent letters and emails about the Cimarron Site, and our most recent update to the Seminole Nation was sent by email on June 9, 2023.

As part of the environmental review for the NRCs review of the proposed groundwater treatment at the site, the NRC staff is preparing an environmental assessment (EA) under the National Environmental Policy Act of 1969, as amended. The NRC staff is soliciting comments on the historic and cultural resources sections of the draft EA and findings under Section 106 of the National Historic Preservation Act. I have attached the information to this email. This information can also be found on the NRCs project web page: https://www.nrc.gov/info-finder/decommissioning/complex/kerr-mcgee-cimarron-corporation-former-fuel-fabrication-facility.html. If you would like to submit a comment on the attached information, please submit it Christine.Pineda@nrc.gov by September 27, 2024. If you have any questions, please reply to this email or call 301-415-6789.

If you no longer wish to receive updates from the NRC about this site, please let me know by replying to this email.

Kind Regards, Christine

Christine Pineda Environmental Project Manager U.S. Nuclear Regulatory Commission Christine.Pineda@nrc.gov 301-415-6789

From:

Christine Pineda (She/Her)

To:

rcain@ukb-nsn.gov

Subject:

FW: For Review regarding Cimarron Site: Environmental Assessment Documentation Pertaining to Section 106 of the National Historic Preservation Act Date:

Thursday, August 29, 2024 4:20:52 PM Attachments:

image001.png Draft EA Sections on Cultural and Historic Resources - ML24236A704.pdf From: Christine Pineda (She/Her) <Christine.Pineda@nrc.gov>

Sent: Thursday, August 29, 2024 3:52 PM To: awatt@ukb-nsn.gov

Subject:

For Review regarding Cimarron Site: Environmental Assessment Documentation Pertaining to Section 106 of the National Historic Preservation Act

Greetings,

The purpose of this email is to provide an update on U.S. Nuclear Regulatory Commission (NRC) regulatory activities related to the former Cimarron nuclear fuel fabrication facility in Logan County, Oklahoma (Cimarron Site). The NRC previously sent letters and emails about the Cimarron Site, and our most recent update to the United Keetoowah Band was sent by email on June 8, 2023.

As part of the environmental review for the NRCs review of the proposed groundwater treatment at the site, the NRC staff is preparing an environmental assessment (EA) under the National Environmental Policy Act of 1969, as amended. The NRC staff is soliciting comments on the historic and cultural resources sections of the draft EA and findings under Section 106 of the National Historic Preservation Act. I have attached the information to this email. This information can also be found on the NRCs project web page: https://www.nrc.gov/info-finder/decommissioning/complex/kerr-mcgee-cimarron-corporation-former-fuel-fabrication-facility.html. If you would like to submit a comment on the attached information, please submit it Christine.Pineda@nrc.gov by September 27, 2024. If you have any questions, please reply to this email or call 301-415-6789.

If you no longer wish to receive updates from the NRC about this site, please let me know by replying to this email.

Kind Regards, Christine

Christine Pineda Environmental Project Manager U.S. Nuclear Regulatory Commission Christine.Pineda@nrc.gov 301-415-6789

From:

Christine Pineda (She/Her)

To:

dfrazier@astribe.com; 106NAGPRA@astribe.com

Subject:

For Review regarding Cimarron Site: Environmental Assessment Documentation Pertaining to Section 106 of the National Historic Preservation Act Date:

Thursday, August 29, 2024 4:17:54 PM Attachments:

image002.png Draft EA Sections on Cultural and Historic Resources - ML24236A704.pdf Greetings,

The purpose of this email is to provide an update on U.S. Nuclear Regulatory Commission (NRC) regulatory activities related to the former Cimarron nuclear fuel fabrication facility in Logan County, Oklahoma (Cimarron Site). The NRC previously sent letters and emails about the Cimarron Site, and our most recent update to the Absentee Shawnee Tribe was sent by email on June 8, 2023.

As part of the environmental review for the NRCs review of the proposed groundwater treatment at the site, the NRC staff is preparing an environmental assessment (EA) under the National Environmental Policy Act of 1969, as amended. The NRC staff is soliciting comments on the historic and cultural resources sections of the draft EA and findings under Section 106 of the National Historic Preservation Act. I have attached the information to this email. This information can also be found on the NRCs project web page: https://www.nrc.gov/info-finder/decommissioning/complex/kerr-mcgee-cimarron-corporation-former-fuel-fabrication-facility.html. If you would like to submit a comment on the attached information, please submit it Christine.Pineda@nrc.gov by September 27, 2024. If you have any questions, please reply to this email or call 301-415-6789.

If you no longer wish to receive updates from the NRC about this site, please let me know by replying to this email.

Kind Regards, Christine

Christine Pineda Environmental Project Manager U.S. Nuclear Regulatory Commission Christine.Pineda@nrc.gov 301-415-6789

From:

Christine Pineda (She/Her)

To:

awatt@ukb-nsn.gov

Subject:

For Review regarding Cimarron Site: Environmental Assessment Documentation Pertaining to Section 106 of the National Historic Preservation Act Date:

Thursday, August 29, 2024 3:51:37 PM Attachments:

image001.png Draft EA Sections on Cultural and Historic Resources - ML24236A704.pdf Greetings,

The purpose of this email is to provide an update on U.S. Nuclear Regulatory Commission (NRC) regulatory activities related to the former Cimarron nuclear fuel fabrication facility in Logan County, Oklahoma (Cimarron Site). The NRC previously sent letters and emails about the Cimarron Site, and our most recent update to the United Keetoowah Band was sent by email on June 8, 2023.

As part of the environmental review for the NRCs review of the proposed groundwater treatment at the site, the NRC staff is preparing an environmental assessment (EA) under the National Environmental Policy Act of 1969, as amended. The NRC staff is soliciting comments on the historic and cultural resources sections of the draft EA and findings under Section 106 of the National Historic Preservation Act. I have attached the information to this email. This information can also be found on the NRCs project web page: https://www.nrc.gov/info-finder/decommissioning/complex/kerr-mcgee-cimarron-corporation-former-fuel-fabrication-facility.html. If you would like to submit a comment on the attached information, please submit it Christine.Pineda@nrc.gov by September 27, 2024. If you have any questions, please reply to this email or call 301-415-6789.

If you no longer wish to receive updates from the NRC about this site, please let me know by replying to this email.

Kind Regards, Christine

Christine Pineda Environmental Project Manager U.S. Nuclear Regulatory Commission Christine.Pineda@nrc.gov 301-415-6789

From:

Christine Pineda (She/Her)

To:

wwarrior@ukb-nsn.gov; sheila-bird@cherokee.org; sbird@ukb-nsn.gov

Subject:

For Review regarding Cimarron Site: Environmental Assessment Documentation Pertaining to Section 106 of the National Historic Preservation Act Date:

Thursday, August 29, 2024 3:48:59 PM Attachments:

image001.png Draft EA Sections on Cultural and Historic Resources - ML24236A704.pdf Greetings,

The purpose of this email is to provide an update on U.S. Nuclear Regulatory Commission (NRC) regulatory activities related to the former Cimarron nuclear fuel fabrication facility in Logan County, Oklahoma (Cimarron Site). The NRC previously sent letters and emails about the Cimarron Site, and our most recent update to the United Keetoowah Band was sent by email on June 8, 2023.

As part of the environmental review for the NRCs review of the proposed groundwater treatment at the site, the NRC staff is preparing an environmental assessment (EA) under the National Environmental Policy Act of 1969, as amended. The NRC staff is soliciting comments on the historic and cultural resources sections of the draft EA and findings under Section 106 of the National Historic Preservation Act. I have attached the information to this email. This information can also be found on the NRCs project web page: https://www.nrc.gov/info-finder/decommissioning/complex/kerr-mcgee-cimarron-corporation-former-fuel-fabrication-facility.html. If you would like to submit a comment on the attached information, please submit it Christine.Pineda@nrc.gov by September 27, 2024. If you have any questions, please reply to this email or call 301-415-6789.

If you no longer wish to receive updates from the NRC about this site, please let me know by replying to this email.

Kind Regards, Christine

Christine Pineda Environmental Project Manager U.S. Nuclear Regulatory Commission Christine.Pineda@nrc.gov 301-415-6789

From:

Christine Pineda (She/Her)

To:

Brown, Lauren

Subject:

For Review regarding Cimarron Site: Environmental Assessment Documentation Pertaining to Section 106 of the National Historic Preservation Act Date:

Thursday, August 29, 2024 3:07:28 PM Attachments:

Draft EA Sections on Cultural and Historic Resources - ML24236A704.pdf image001.png Hello Ms. Brown,

The purpose of this email is to give you an update on U.S. Nuclear Regulatory Commission (NRC) regulatory activities related to the former Cimarron nuclear fuel fabrication facility in Logan County, Oklahoma (Cimarron Site). As part of the environmental review for the NRCs review of the proposed groundwater treatment at the site, the NRC staff is preparing an environmental assessment (EA) under the National Environmental Policy Act of 1969, as amended. The NRC staff is soliciting comments on the historic and cultural resources sections of the draft EA and findings under Section 106 of the National Historic Preservation Act. I have attached the information to this email. This information can also be found on the NRCs project web page: https://www.nrc.gov/info-finder/decommissioning/complex/kerr-mcgee-cimarron-corporation-former-fuel-fabrication-facility.html. If you would like to submit a comment on the attached information, please submit it Christine.Pineda@nrc.gov by September 27, 2024. If you have any questions, please reply to this email or call 301-415-6789.

Kind Regards, Christine

Christine Pineda Environmental Project Manager U.S. Nuclear Regulatory Commission Christine.Pineda@nrc.gov 301-415-6789

From:

Christine Pineda (She/Her)

To:

Brina Williams

Subject:

For Review regarding Cimarron Site: Environmental Assessment Documentation Pertaining to Section 106 of the National Historic Preservation Act Date:

Thursday, August 29, 2024 1:01:28 PM Attachments:

Draft EA Sections on Cultural and Historic Resources - ML24236A704.pdf image001.png Hello Ms. Williams,

The purpose of this email is to provide an update on NRC activities related to the former Cimarron nuclear fuel fabrication facility in Logan County, Oklahoma (Cimarron Site). As part of the environmental review for the NRCs review of the proposed groundwater treatment at the site, the NRC staff is preparing an environmental assessment (EA) under the National Environmental Policy Act of 1969, as amended. The NRC staff is soliciting comments on the historic and cultural resources sections of the draft EA and findings under Section 106 of the National Historic Preservation Act. I have attached the information to this email. This information can also be found on the NRCs project web page: https://www.nrc.gov/info-finder/decommissioning/complex/kerr-mcgee-cimarron-corporation-former-fuel-fabrication-facility.html. If you would like to submit a comment on the attached information, please submit it to me at Christine.Pineda@nrc.gov by September 27, 2024. If you have any questions, please reply to this email or call me at 301-415-6789.

Kind Regards, Christine

Christine Pineda Environmental Project Manager U.S. Nuclear Regulatory Commission Christine.Pineda@nrc.gov 301-415-6789

From:

Christine Pineda (She/Her)

To:

RaeLynn Butler Cc:

Section106

Subject:

For Review Regarding Cimarron Site: Environmental Assessment Documentation Pertaining to Section 106 of the National Historic Preservation Act Date:

Wednesday, August 28, 2024 5:51:11 PM Attachments:

image001.png Draft EA Sections on Cultural and Historic Resources - ML24236A704.pdf Hello Ms. Butler,

The purpose of this email is to provide an update on NRC activities related to the former Cimarron nuclear fuel fabrication facility in Logan County, Oklahoma (Cimarron Site). As part of the environmental review for the NRCs review of the proposed groundwater treatment at the site, the NRC staff is preparing an environmental assessment (EA) under the National Environmental Policy Act of 1969, as amended. The NRC staff is soliciting comments on the historic and cultural resources sections of the draft EA and findings under Section 106 of the National Historic Preservation Act. I have attached the information to this email. This information can also be found on the NRCs project web page: https://www.nrc.gov/info-finder/decommissioning/complex/kerr-mcgee-cimarron-corporation-former-fuel-fabrication-facility.html. If you would like to submit a comment on the attached information, please submit it to me at Christine.Pineda@nrc.gov by September 27, 2024.

If you have any questions, please reply to this email or call me at 301-415-6789.

Kind Regards, Christine

Christine Pineda Environmental Project Manager U.S. Nuclear Regulatory Commission Christine.Pineda@nrc.gov 301-415-6789