ML24306A177
| ML24306A177 | |
| Person / Time | |
|---|---|
| Site: | 99902117 |
| Issue date: | 10/31/2024 |
| From: | Dukes O NRC/NRR/DANU/UAL2 |
| To: | John Segala Office of Nuclear Reactor Regulation |
| References | |
| Download: ML24306A177 (1) | |
Text
October 31, 2024 MEMORANDUM TO:
John Segala, Chief Advanced Reactor Licensing Branch 2 Division of Advanced Reactors and Non-Power Production and Utilization Facilities Office of Nuclear Reactor Regulation FROM:
Ondra Dukes, Project Manager /RA/
Advanced Reactor Licensing Branch 2 Division of Advanced Reactors and Non-Power Production and Utilization Facilities Office of Nuclear Reactor Regulation
SUBJECT:
SUMMARY
OF THE AUGUST 1, 2024, CLOSED MEETING WITH X ENERGY, LLC, AND DOW CHEMICAL TO DISCUSS REACTOR CAVITY COOLING SYSTEM (RCCS) DESIGN CRITERIA FOR PROJECT LONG MOTT Meeting Information:
Applicant: X Energy, LLC (X-energy) and Dow Chemical (Dow)
Docket No.: 99902117 Public Meeting Notice Agencywide Documents Access and Management System (ADAMS)
Accession No.: ML24187A100 Meeting Slides Accession No.: ML24201A191 (Proprietary)
Meeting Attendees: See the enclosure for a list of meeting attendees.
CONTACT:
Adrian Muniz, NRR/DANU (301) 415-4093
Meeting Summary:
The U.S. Nuclear Regulatory Commission (NRC) staff conducted the meeting in accordance with NRC Management Directive 3.5, Attendance at NRC Staff-Sponsored Meetings (ADAMS Accession No. ML21180A271). The purpose of the meeting was for X-energy and Dow to discuss the Reactor Cavity Cooling System (RCCS) system-specific design criteria and related performance requirements during design basis accidents (DBAs), as they relate to the Xe-100 design changes in support of the planned Project Long Mott construction permit application. to this memorandum contains proprietary notes documenting discussions between the NRC and X-energy staff during the meeting.
No regulatory decisions were made as a result of this meeting.
Docket No. 99902117
Enclosures:
List of Meeting Attendees (Enclosure 1)
Proprietary notes (Enclosure 2) cc without Enclosure 2: X-Energy Xe-100 via GovDelivery
ML24306A177 NRR-106 OFFICE NRR/DANU/UAL2/PM NRR/DANU/UAL2/PM NRR/DANU/UAL2/BC NRR/DANU/UAL2/PM NAME ODukes AMuniz JSegala ODukes DATE 10/30/2024 10/23/2024 10/31/2024 10/31/2024
LIST OF MEETING ATTENDEES FOR THE AUGUST 1, 2024, CLOSED MEETING WITH X ENERGY, LLC., AND DOW CHEMICAL TO DISCUSS REACTOR CAVITY COOLING SYSTEM (RCCS) DESIGN CRITERIA FOR PROJECT LONG MOTT Name Organization Adrian Muniz U.S. Nuclear Regulatory Commission (NRC)
Ian Jung NRC Greg Oberson NRC Zach Gran NRC Clair Song NRC Matthew Gordon NRC Anthony Konecni NRC Pravin Sawant NRC Stephen Philpott NRC Denise McGovern NRC Meg Audrain NRC Jason Schaperow NRC Dan Beacon NRC Vince Voltaggio NRC Michael Salay NRC Nilesh Chokshi CNWRA (NRC Contractor)
Jessica Maddocks X Energy, LLC. (X-energy)
Jared Wicker X-Energy Wesley Steh X-Energy Matthew Hertel X-Energy Jim Fogarty X-Energy Steve Vaughn X-Energy Harlan Bowers X-Energy Mark Anderson X-Energy Jackson Luo X-Energy Brian Froese X-Energy Mike Melton X-Energy Ian Davis X-Energy Renee Fales X-Energy Olivier Retourne X-Energy Brandon Norris X-Energy Martin van Staden X-Energy Timothy Lucas X-Energy David Bannister X-Energy Mark Paul X-Energy Kyle Metzroth X-Energy Brandon Norris X-Energy Mark Feltner Dow Chemical Company David Yarwood U.S. Department of Energy (DOE)
2 Mark Natale DOE Timothy Stuhldreher DOE Rasheed Auguste DOE Lisa Williams Energy Northwest William Maher FPL