ML24278A118

From kanterella
Jump to navigation Jump to search
NAC - Submittal of a Request to Revise the NAC-LWT Certificate of Compliance (CoC) Incorporating Fabrication Improvements to the Triga Fuel Basket
ML24278A118
Person / Time
Site: 07109225
Issue date: 10/04/2024
From: Baldner H
NAC International
To:
Office of Nuclear Material Safety and Safeguards, Document Control Desk
Shared Package
ML24278A117 List:
References
Download: ML24278A118 (1)


Text

Atlanta Corporate Headquarters 2 Sun Court, Suite 220 Peachtree Corners, GA 30092 Phone 770-447-1144 www.nacintl.com October 4, 2024 U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852-2738 Attention:

Document Control Desk

Subject:

Submission of a Request to Revise the NAC-LWT Certificate of Compliance (CoC) Incorporating Fabrication Improvements to the TRIGA Fuel Basket.

Docket 71-9225

References:

1.

USNRC CoC No. 9225, Revision 75, Model No. NAC-LWT Package, Dated September 6, 2024

2.

ED202400096, Submission of NAC-LWT Safety Analysis Report (SAR), Revision 48 Incorporating Iron Clad Fuel and LANL MOX Fuel as Approved Contents for Transport, August 16, 2024 NAC International (NAC) hereby submits a request to revise the NAC-LWT Certificate of Compliance (CoC) No. 9225, Revision 75 (Reference 1) to revise drawings40-070, 40-071,40-072. The changes to the license drawings are to incorporate fabrication related improvements of the TRIGA Fuel basket for the LWT system.

The changes requested herein are common to the proprietary and non-proprietary SAR. LWT-SAR Rev. 48 (Reference 2) has been used as the base document to which the requested change has been made. Enclosure 1 contains the proposed CoC changes. Enclosures 2 and 3 contain a list of drawing and SAR changes, respectively. Consistent with NAC administrative practice, this proposed SAR revision is numbered to uniquely identify the applicable changed pages. Revision bars mark the SAR text changes on the Revision LWT-24E pages (Enclosure 4). In accordance with NACs administrative practices, upon final acceptance of this application, the LWT-24E changed pages will be reformatted and incorporated into the next revision of the NAC-LWT SAR.

Atlanta Corporate Headquarters 2 Sun Court, Suite 220 Peachtree Corners, GA 30092 Phone 770-447-1144 www.nacintl.com Nuclear Regulatory Commission October 4, 2024 Page 2 of 2 If you have any questions regarding this letter, please feel free to contact me on my direct number at 678-328-1252.

Sincerely, Heath Baldner Director, Licensing Engineering

Enclosures:

- Proposed Changes for Certificate of Compliance Revision 76 - List of Drawing Changes, NAC-LWT SAR, Revision 24E - List of SAR Changes, NAC-LWT SAR, Revision 24E - NAC-LWT, LOEP and SAR Pages Revision 24E Heath M. Baldner Digitally signed by Heath M.

Baldner Date: 2024.10.04 10:06:22 -04'00'