JAFP-24-0051, Reply to Preliminary White Finding and Apparent Violation in NRC Inspection Report 05000333/2024011; EA-24-088

From kanterella
(Redirected from ML24277A088)
Jump to navigation Jump to search
Reply to Preliminary White Finding and Apparent Violation in NRC Inspection Report 05000333/2024011; EA-24-088
ML24277A088
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 10/03/2024
From: Olson G
Constellation Energy Generation
To:
Office of Nuclear Reactor Regulation, NRC Region 1, Document Control Desk
References
JAFP-24-0051, EA-24-088
Download: ML24277A088 (1)


Text

Constellation ~ James A. FitzPatrick NPP P.O. Box 110 Lycoming, NY 13093

Garrick D. Olson Plant Manager - JAF

JAFP-24-0051 October 3, 2024

U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555

James A FitzPatrick Nuclear Power Plant Renewed Facility Operating License No. DPR-59 NRC Docket No. 50-333

Subject:

Reply to Preliminary White Finding and Apparent Violation in NRC Inspection Report 05000333/2024011; EA-24-088

References:

1. NRC letter, James A. FitzPatrick Nuclear Power Plant - Follow-up to Inspection Procedure 71153 report 05000333/2024011 and Preliminary White Finding and Apparent Violation, EA-24-088, dated September 19, 2024 (ML24262A197)

Dear Sir or Madam:

By letter dated September 19, 2024, the NRC documented a preliminary White Finding and Apparent Violation [Reference 1] in inspection report 05000333/2024011, related to a

'B' Emergency Diesel Generator (EOG) Gallery Lube Oil Supply Check Valve Failure on April 24, 2024. Constellation Energy Generation, LLC (CEG) acknowledges the description as discussed in the inspection report.

On September 27, 2024, Garrick Olson, Plant Manager, verbally notified NRC's Erin Carfang of CEG's decision to not contest the violation or significance of the violation.

This letter confirms that CEG is not requesting a regulatory conference on this matter and will not be submitting a written response. It is understood by CEG that by declining to submit a written response or to arrange a regulatory conference, the preliminary assessment of significance will become final.

Should you have any questions regarding this submittal, please contact Mrs. Chelsea Troutman, Regulatory Assurance Manager at (607) 742-9310.

Ver.Y, truly yours, Jasr1. ~re..\\..

~

Garrick D. Olson Plant Manager

GDO:CT:mh cc: next page JAFP-24-0051 Page 2 of 2

cc: Director, Office of Nuclear Reactor Regulation NRG Region I Administrator NRG Resident Inspector NRG Project Manager NYSPSG President NYSERDA