Westinghouse Columbia Fuel Fabrication Facility January 2024 Semiannual Groundwater Monitoring Report and July 2024 Groundwater Monitoring Data Summary Table Report
ML24263A298
Person / Time
Site: Westinghouse
Issue date: 09/19/2024
From: Subosits S
Westinghouse
To:
Office of Nuclear Material Safety and Safeguards, Document Control Desk
Shared Package
ML24263A297 List:
References
LTR-RAC-24-34
Download: ML24263A298 (1)


Text

WESTINGHOUSE NON-PROPRIETARY CLASS 3

© 2024 Westinghouse Electric Company LLC All Rights Reserved Director, Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Document Control Desk 11555 Rockville Pike Rockville, Maryland 20852-2738 Direct tel: 803-647-3193 e-mail: wct4679@westinghouse.com Your ref:

Our ref: LTR-RAC-24-34 September 19, 2024

SUBJECT:

Westinghouse Columbia Fuel Fabrication Facility January 2024 Semiannual Groundwater Monitoring Report and July 2024 Groundwater Monitoring Data Summary Table Report In accordance with Section 10.1.6 of the SNM-1107 License Application, Westinghouse Electric Company LLC (Westinghouse) is submitting Semiannual Groundwater Monitoring Report documentation to the NRC. In September 2023 the South Carolina Department of Environmental Services (SC-DES) renewed National Pollutant Discharge Elimination System (NPDES) permit (No. SC0001848) for the Columbia Fuel Fabrication Facilitys (CFFF). In accordance with the renewed NPDES permit, Groundwater Monitoring Reports are now submitted semiannually to SC-DES instead of annually. Westinghouse is providing the Semiannual Groundwater Monitoring Report and supporting appendices for the October 2023 sampling period as Enclosure 1. The report for the October 2023 sampling period was submitted in January 2024 to the SC-DES as required by the CFFF NPDES permit.

In addition, Westinghouse is submitting the Semiannual Groundwater Monitoring Data Summary Table correspondence and supporting analytical data for the April 2024 sampling period as Enclosure 2. As required by Part III Section C.1.j. of the CFFF NPDES permit, a Monitoring Data Summary Table was prepared and submitted in July 2024 to the SC-DES in lieu of a comprehensive Semiannual Groundwater Report while Feasibility Study (FS) evaluations continue under Westinghouses Consent Agreement HW-19-02 with the SC-DES. The Monitoring Data Summary Table includes discussion of select trend data, sample methods used for the collection of groundwater, and supporting laboratory analytical information.

If you have any questions regarding the enclosed documentation, please contact Nancy Parr, Manager, Environmental Project, at (803) 647-3338.

Stephen G. Subosits Manager, Regulatory Affairs Westinghouse Columbia Fuel Fabrication Facility Docket 07001151, License SNM-1107

2023 CFFF Semiannual Groundwater Monitoring Report, dated January 2024. : CFFF April 2024 Groundwater Sampling Results/Groundwater Monitoring Data Summary Table, dated July 25, 2024 Westinghouse Electric Company LLC Columbia Fuel Fabrication Facility 5801 Bluff Road Hopkins, South Carolina 29061-9121 USA Stephen G Subosits (Sep 19, 2024 21:55 EDT)

Stephen G Subosits

WESTINGHOUSE NON-PROPRIETARY CLASS 3 LTR-RAC-24-34 Page 2 of 2 cc (w/o enclosures):

NRC, Mr. Yawar Faraz NRC, Mr. Thomas Vukovinsky