Category:Legal-Affidavit
MONTHYEARML24253A2202024-09-0606 September 2024 Transmittal of Responses to NRC Audit Questions on Kemmerer Power Station Unit 1 Preliminary Safety Analysis Report 2024-09-06
[Table view] Category:Letter
MONTHYEARML24275A0722024-10-0808 October 2024 DOE Oced KU1 Preconstruction Initiation Response ML24253A0232024-09-0909 September 2024 Terrapower, LLC - Exemption Request Associated with Construction of the Natrium Energy Island ML24198A0922024-09-0606 September 2024 Letter - Terrapower, LLC - Final Safety Evaluation of Topical Report NAT-3226, an Analysis of the Potential Volcanic Hazards at the Proposed Natrium Site Near Kemmerer, Wyoming ML24253A2202024-09-0606 September 2024 Transmittal of Responses to NRC Audit Questions on Kemmerer Power Station Unit 1 Preliminary Safety Analysis Report ML24215A3102024-06-30030 June 2024 Terrapower Section 106 Initiation - Achp Response ML24165A1632024-06-14014 June 2024 Terrapower Tribal Scoping and Initiation Letter-Cooper, Durrell-Apache Tribe of Oklahoma ML24165A1802024-06-14014 June 2024 Terrapower Tribal Scoping and Initiation Letter-Sheridan, Jason-Omaha Tribe of Nebraska ML24165A1812024-06-14014 June 2024 Terrapower Tribal Scoping and Initiation Letter-St. Clair, John-Eastern Shoshone Tribe ML24165A1782024-06-14014 June 2024 Terrapower Tribal Scoping and Initiation Letter-Renville, J. Garret-Sisseton Wahpeton Oyate ML24165A1612024-06-14014 June 2024 Terrapower Tribal Scoping and Initiation Letter-Alkire, Janet-Standing Rock Sioux Tribe ML24165A1772024-06-14014 June 2024 Terrapower Tribal Scoping and Initiation Letter-Murray, Julius-Ute Indian Tribe ML24165A1702024-06-14014 June 2024 Terrapower Tribal Scoping and Initiation Letter-Jackson-Street, Lonna-Spirit Lake Tribe ML24165A1642024-06-14014 June 2024 Terrapower Tribal Scoping and Initiation Letter-Estes, Clyde J.R.-Lower Brule Sioux Tribe ML24165A1662024-06-14014 June 2024 Terrapower Tribal Scoping and Initiation Letter-Fox, Maek-Three Affiliated Tribes ML24165A1752024-06-14014 June 2024 Terrapower Tribal Scoping and Initiation Letter-Moon, Daniel-Skull Valley Band of Goshute Indians ML24165A1712024-06-14014 June 2024 Terrapower Tribal Scoping and Initiation Letter-Kipp, Scott-Blackfeet Nation ML24165A1842024-06-14014 June 2024 Terrapower Tribal Scoping and Initiation Letter-Tyler, Lee-Shoshone-Bannock ML24165A1852024-06-14014 June 2024 Terrapower Tribal Scoping and Initiation Letter-Wassana, Reggie-Cheyebnne and Arapaho Tribes ML24165A1832024-06-14014 June 2024 Terrapower Tribal Scoping and Initiation Letter-Stiffarm, Jeffrey-Fort Belknap Indian Community ML24165A1882024-06-14014 June 2024 Terrapower Tribal Scoping and Initiation Letter-White Clay, Frank-Crow Tribe ML24165A1872024-06-14014 June 2024 Terrapower Tribal Scoping and Initiation Letter-Wheeler, Shannon F-Nez Perce Tribe ML24165A1892024-06-14014 June 2024 Terrapower Tribal Scoping and Initiation Letter-Woommavovah, Mark-Comanche Nation ML24165A1762024-06-14014 June 2024 Terrapower Tribal Scoping and Initiation Letter-Murphy, Amos-Confederated Tribes of the Goshute Reservation ML24165A1862024-06-14014 June 2024 Terrapower Tribal Scoping and Initiation Letter-Wetherelt, Serena-Northern Cheyenne Tribe ML24165A1742024-06-14014 June 2024 Terrapower Tribal Scoping and Initiation Letter-Lengkeek, Peter-Crow Creek Sioux Tribe ML24165A1682024-06-14014 June 2024 Terrapower Tribal Scoping and Initiation Letter-Gray Hawk, Sr., Justin-Fort Peck Assiniboine and Sioux Tribes ML24165A1692024-06-14014 June 2024 Terrapower Tribal Scoping and Initiation Letter-Herman, Scott O-Rosebud Sioux Tribe ML24165A1672024-06-14014 June 2024 Terrapower Tribal Scoping and Initiation Letter-Goggles, Lloyd-Northern Arapaho Tribe ML24165A1602024-06-14014 June 2024 Terrapower Tribal Scoping and Initiation Letter-Alex, Dennis-Northwestern Band of the Shoshone Nation ML24165A1732024-06-14014 June 2024 Terrapower Tribal Scoping and Initiation Letter-LeBeau, Ryman-Cheyenne River Sioux Tribe ML24165A1722024-06-14014 June 2024 Terrapower Tribal Scoping and Initiation Letter-Kitcheyan, Victoria-Winnebago Tribe of Nebraska ML24165A1822024-06-14014 June 2024 Terrapower Tribal Scoping and Initiation Letter-Star Comes Out, Frank-Oglala Sioux Tribe ML24165A1652024-06-14014 June 2024 Terrapower Tribal Scoping and Initiation Letter-Flying Hawk, Robert-Yankton Sioux Tribe ML24165A1792024-06-14014 June 2024 Terrapower Tribal Scoping and Initiation Letter-Schmidt, Candace-Ponca Tribe of Nebraska ML24165A1622024-06-14014 June 2024 Terrapower Tribal Scoping and Initiation Letter-Baker, Harlan-Chippewa Cree Tribe ML24162A0632024-06-12012 June 2024 Terrapower Kemmerer 1 Scheduling and Resource Letter ML24114A0902024-06-12012 June 2024 Request to Initiate Section 106 Consultation and Scoping Process for Terrapower Kemmerer Power Station Unit 1 Construction Permit Review in Lincoln County, Wyoming ML24114A0892024-06-12012 June 2024 Achp Scoping-Initiation Terrapower Kemmerer ML24109A2752024-06-12012 June 2024 Kemmerer Power Station Unit 1 CP Review - Notice of Intent to Conduct Scoping Process and Prepare an Environmental Impact Statement ML24157A0442024-06-0303 June 2024 Fee Exemption Request for Review and Evaluation of the Safety and Security Portions of the Uso Construction Permit Application ML24155A2422024-06-0303 June 2024 Terrapower, LLC, Fee Exemption Request for Review and Evaluation of the Safety and Security Portions of the Uso Construction Permit Application 2024-09-09
[Table view] |
Text
Terr a Power.
September 6, 2024 TP - LIC-LET-0346 Docket Number 50-613
U.S. Nuclear Regulatory Commission Washington, DC 20555 - 0001 ATTN: Document Control Desk
Subject:
Transmittal of Responses to NRC Audit Questions on Kemmerer Power Station Unit 1 Preliminary Safety Analysis Report
TerraPower, LLC (TerraPower) on behalf of US SFR Owner, LLC (USO), submits this letter to provide responses to NRC audit questions on Kemmerer Power Station Unit 1 Preliminary Safety Analysis Report. The responses to audit questions 2 - 8, 2 - 9, 2-19, 2-20, 2-22, 2-24, 2-29 and 9 - 3 include data files that are provided on the enclosed CD-ROM.
The data on the enclosed CD-ROM is considered propr ietary, and TerraPower requests that the data be withheld from public disclosure in its entirety in accordance with the provisions of 10 CFR 2.390. An affidavit supporting the withholding request is provided in Enclosure 1.
Enclosure 2 prov ides the CD - ROM containing proprietary data.
This letter and enclosures make no new or revised regulatory commitments.
If you have any questions regard ing this submittal, please contact Ryan Sprengel at rsprengel@terrapower.com or (425) 324 - 2888.
Sincerely,
Ryan Sprengel Director of Licensing, Natrium Terra Power, LLC
15800 Northup Way, Bellevue, WA 98008 www.TerraPower.com P. + 1 (425) 324-2888 F. + 1 (425) 324-2889
September 6, 2024 Page 2 of 2
Enclosures:
- 1. TerraPower, LLC Affidavit and Request for Withholding from Public Disclosure (10 CFR 2.390(a)(4))
- 2. CD-ROM with Data Referenced in Responses (Proprietary)
cc: Mallecia Sutton, NRC Josh Borromeo, NRC Nathan Howard, DOE Jeff Ciocca, DOE ENCLOSURE 1
TerraPower, LLC Affidavit and Request for Withholding from Public Disclosure
(10 CFR 2.390(a)(4))
Enclosure 1 TerraPower, LLC Affidavit and Request for Withholding from Public Disclosure (10 CFR 2.390(a)(4))
I, George Wilson, hereby state:
- 1. I am the Vice President, Regulatory Affairs and I have been authorized by Terra Power, LLC (TerraPower) to review information sought to be withheld from public disclosure in connection with the development, testing, licensing, and deployment of the Natrium TM reactor and its associated fuel, structures, systems, and components, and to apply for its withholding from public disclosure on behalf of TerraPower.
- 2. The information sought to be withheld, in its entirety, is contained in Enclosure 2, which accompanies this Affidavit.
- 3. I am making this request for withholding, and executing this Affidavit as required by 10 CFR 2.390(b )(1 ).
- 4. I have personal knowledge of the criteria and procedures utilized by Terra Power in designating information as a trade secret, privileged, or as confidential commercial or financial information that would be protected from public disclosure under 10 CFR 2.390(a)(4).
- 5. The information contained in Enclosure 2 accompanying this Affidavit contains non-public details of the TerraPower regulatory and developmental strategies intended to support NRC staff review.
- 6. Pursuant to 10 CFR 2.390(b)(4), the following is furnished for consideration by the Commission in determining whether the information in Enclosure 2 should be withheld:
- a. The information has been held in confidence by TerraPower.
- b. The information is of a type customarily held in confidence by TerraPower and not customarily disclosed to the public. TerraPower has a rational basis for determining the types of information that it customarily holds in confidence and, in that connection, utilizes a system to determine when and whether to hold certain types of information in confidence.
The application and substance of that system constitute Terra Power policy and provide the rational basis required.
- c. The information is being transmitted to the Commission in confidence and, under the provisions of 10 CFR 2.390, it is received in confidence by the Commission.
- d. This information is not available in public sources.
- e. Terra Power asserts that public disclosure of this non-public information is likely to cause substantial harm to the competitive position of Terra Power, because it would enhance the ability of competitors to provide similar products and services by reducing their expenditure of resources using similar project methods, equipment, testing approach, contractors, or licensing approaches.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on: September 6, 2024 *
- ?-(!Ar w~Jt, George Wilson Vice President, Regulatory Affairs TerraPower, LLC Proprietary-TerraPower Confidential Information Submitted Under 10 CFR 2.390(a)(4)
ENCLOSURE 2