Text
From: Timothy Sippel To: Subosits, Stephen G; mille1cs@westinghouse.com Cc: Todd Shewmaker; Noah Woodyard (He/Him); Meg Day
Subject:
Document Request for NCS inspection Date: Monday, August 12, 2024 1:05:00 PM Attachments: 2024-003 Westinghouse NCS Document Request.docx
Steve, Chris,
This email is to notify you that the U.S. Nuclear Regulatory Commission (NRC) Region II staff will conduct a nuclear criticality safety (NCS) inspection at your facility during the week of September 16, 2024. The inspection will focus on the core inspection procedures described in Inspection Manual Chapter 2600; and will use Inspection Procedures 88015, Nuclear Criticality Safety. I will be conducting the inspection. While Todd Shewmaker and Noah Woodyard are planned to accompany for inspector qualification purposes. Please let us know if there is anything we need to do to get onsite.
Experience has shown that these inspections are resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to conduct a productive inspection, I have attached a request for documents needed for this inspection. If practical, we would like to have the documents at least a week prior to the inspection to facilitate preparation and be able to conduct a productive inspection.In the attachment, Ive also specified some items that we will need during the on-site portion of the inspection.
If possible, an entrance meeting should be scheduled for 13:00 on Monday, with an exit meeting at 16:00 on Thursday. If there are any questions about this inspection or the material requested, particularly in the you find the request unclear or unduly burdensome, please contact me at 404-997-4525.
Thank you. - Tim.
NUCLEAR CRITICALITY SAFETY INSPECTION DOCUMENT REQUEST
SITE: Westinghouse INSPECTION REPORT NUMBER: 2024- 003
PRE-INSPECTION VISIT: NA
INSPECTION DATES: September 16 - 20, 2024
NRC INSPECTORS: Timothy Sippel, Timothy.Sippel@nrc.gov
ACCOMPANYING PERSONNEL: Todd Shewmaker, Todd.Shewmaker@nrc.gov Noah Woodyard, Noah.Woodyard@nrc.gov
IDENTIFIED LICENSEE CONTACTS:
Steve Subosits, Licensing, Stephen.Subosits@westinghouse.com Chris Miller, NCS Manager, mille1cs@westinghouse.com
ASSOCIATED PROCEDURES:
88015 - Nuclear Criticality Safety
Note: This is a broad list of the documents the NRC inspectors will be interested in obtaining and reviewing during the inspection visit. The current version of these documents is expected unless specified otherwise. The lead inspector can answer questions regarding specific information needs with licensee staff and may request additional documents.
DOCUMENTATION REQUESTED
- 1. Information Requested for NCS Inspection
- a. Any NCS Program procedures (e.g., those related to NCS review of events and establishment of corrective actions, NCS audits and weekly walkdowns, NCS engineer qualification, development of NCSEs, NCS-related emergency response), manuals, and guidance that are newly created or have been revised since the last inspection
- b. The Validation Report (if changed since inspection)
- d. The CSEs, and NCS-related calculation documents, that have been created or revised since the last inspection
- e. A list of NCS and CAAS-related Corrective Action Program entries, Redbook entries, events reports, and any related NCS safety analyses or evaluations since last inspection
- f. Documentation of any CAAS design changes in the last year
- g. Qualification records for any NCS engineers who have completed an NCS qualification since last inspection
- h. Training material related to NCS support for emergency response
- i. NCS inspection reports/facility walkthrough assessments since the last NCS inspection, schedule for walkdowns and inspections in 2024
- 2. Activities Requested for On-Site Inspection
- a. List of planned CAAS tests; NCS walkdowns or audits; NCS related IROFS tests, PMs, or calibrations scheduled for the inspection week; other NCS related activities occurring during the inspection week
PAPERWORK REDUCTION ACT STATEMENT
This letter contains mandatory information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB) approved these information collections (approval number 3150- 0009). The burden to the public for these information collections is estimated to average 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />(s) per response.
Send comments regarding this information collection to the FOIA, Library and Information Collection Branch, Office of the Chief Information Officer, Mail Stop: T6 -A10M, U.S. Nuclear Regulatory Commission, Washington, DC 20555- 0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150- 0009) Office of Management and Budget, Washington, DC 20503.
Public Protection Notification
The NRC may not conduct nor sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid OMB control number.