ML24226A018

From kanterella
Jump to navigation Jump to search
Comment (960) E-mail Regarding Terrapower CP EIS Scoping
ML24226A018
Person / Time
Site: Kemmerer File:TerraPower icon.png
Issue date: 08/13/2024
From: Public Commenter
Public Commenter
To:
NRC/NMSS/DREFS
NRC/NMSS/DREFS
References
89FR49917
Download: ML24226A018 (2)


Text

From: Julie Mansfield-Wells <ja.gibson@att.net>

Sent: Tuesday, August 13, 2024 1:31 AM To: TerraPowerEnvironmental Resource

Subject:

[External_Sender] Docket ID NRC-2024-0078, Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; US SFR Owner, LLC; Kemmerer Power Station Unit 1

Dear NRC:

Program Management Office of Administration,

Dear NRC,

The proposed Natrium nuclear power plant project near Kemmerer, Wyoming is precedent-setting for the future of nuclear power and warrants a careful and thorough review.

The environmental impact statement for the Natrium reactor project must consider the environmental, economic, and public health impacts of severe nuclear accidents. The only other commercial power reactors of Natriums type that have ever operated in the US--the Sodium Reactor Experiment near Los Angeles and the Fermi unit 1 reactor near Detroit--had a number of accidents and failures, including partial meltdowns in 1959 and 1966. The liquid sodium coolant Natrium would use is intensely flammable if the reactor were ever to leak--explosively so, if the sodium coolant were to come in contact with water.

The lack of transparency regarding the costs and financial fitness of the applicant is deeply concerning. It is crucial for the NRC to uphold all regulatory requirements, including public disclosure. The storage of nuclear waste in Wyoming is unacceptable, and no new nuclear plants should be licensed without a permanent waste disposal solution in place. The transportation risks of nuclear materials to and from the site must be comprehensively evaluated. Additionally, all impacts of uranium mining, milling, and the production of HALEU fuel for the proposed plant need to be disclosed.

The total taxpayer cost and any potential impacts on the federal debt from subsidies should be identified. The relationship between Rocky Mountain Power and TerraPower must be clarified, along with any ratepayer impacts such as higher utility bills. Finally, the EIS should consider a full range of alternatives to the proposed nuclear power plant, including lower-cost and readily available renewable energy options.

Nuclear power is not the solution to climate change. It takes up space on the grid that renewables could be using. It is dirty, dangerous, and leaves a multi-generational hazard of the highly radioactive waste it produces for which there is no safe storage. Costs of managing the waste will be borne by future ratepayers and taxpayers long after the last watt of power is produced. Do not license any more nuclear power plants. It is your moral obligation to protect future generations from this deadly legacy.

Sincerely, Julie Mansfield-Wells 509 Mar Vista Dr Los Osos, CA 93402 Federal Register Notice: 89FR49917 Comment Number: 960

Mail Envelope Properties (8cfb3a69-33d7-4be8-900c-d5dba9de6f4e)

Subject:

[External_Sender] Docket ID NRC-2024-0078, Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; US SFR Owner, LLC; Kemmerer Power Station Unit 1 Sent Date: 8/13/2024 1:30:46 AM Received Date: 8/13/2024 1:30:58 AM From: Julie Mansfield-Wells

Created By: ja.gibson@att.net

Recipients:

"TerraPowerEnvironmental Resource" <TerraPowerEnvironmental.Resource@nrc.gov>

Tracking Status: None

Post Office: salsalabs.org

Files Size Date & Time MESSAGE 2451 8/13/2024 1:30:58 AM

Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: