ML24222A765
| ML24222A765 | |
| Person / Time | |
|---|---|
| Site: | Kemmerer File:TerraPower icon.png |
| Issue date: | 08/08/2024 |
| From: | Public Commenter Public Commenter |
| To: | NRC/NMSS/DREFS |
| NRC/NMSS/DREFS | |
| References | |
| 89FR49917 | |
| Download: ML24222A765 (2) | |
Text
From:
Abigail Johnson <saged183@gmail.com>
Sent:
Thursday, August 8, 2024 9:33 PM To:
TerraPowerEnvironmental Resource
Subject:
[External_Sender] Docket ID NRC-2024-0078, Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; US SFR Owner, LLC; Kemmerer Power Station Unit 1
Dear NRC:
Program Management Office of Administration,
Dear NRC,
The proposed Natrium nuclear power plant project near Kemmerer, Wyoming is precedent-setting for the future of nuclear power and warrants a careful and thorough review.
The environmental impact statement for the Natrium reactor project must consider the environmental, economic, and public health impacts of severe nuclear accidents. The only other commercial power reactors of Natriums type that have ever operated in the US--the Sodium Reactor Experiment near Los Angeles and the Fermi unit 1 reactor near Detroit--had a number of accidents and failures, including partial meltdowns in 1959 and 1966. The liquid sodium coolant Natrium would use is intensely flammable if the reactor were ever to leak--explosively so, if the sodium coolant were to come in contact with water.
The lack of transparency regarding the costs and financial fitness of the applicant is deeply concerning. It is crucial for the NRC to uphold all regulatory requirements, including public disclosure. The storage of nuclear waste in Wyoming is unacceptable, and no new nuclear plants should be licensed without a permanent waste disposal solution in place. The transportation risks of nuclear materials to and from the site must be comprehensively evaluated. Additionally, all impacts of uranium mining, milling, and the production of HALEU fuel for the proposed plant need to be disclosed.
The total taxpayer cost and any potential impacts on the federal debt from subsidies should be identified. The relationship between Rocky Mountain Power and TerraPower must be clarified, along with any ratepayer impacts such as higher utility bills. Finally, the EIS should consider a full range of alternatives to the proposed nuclear power plant, including lower-cost and readily available renewable energy options.
As a Nevadan, I'm familiar with the boondoggle of Yucca Mountain to be a radioactive waste repository.
It doesn't make sense to approve this speculative project and burden local residents with the nuclear waste. As we say in Nevada, "What about the waste?" whenever some new idea comes along that does not recognize the challenges and realities of nuclear waste production and storage. Thank you for your consideration.
Sincerely, Abigail Johnson 1983 MAISON WAY CARSON CITY, NV 89703
Federal Register Notice:
89FR49917 Comment Number:
654 Mail Envelope Properties (5e80972b-f3f5-4579-a56f-90820955dea1)
Subject:
[External_Sender] Docket ID NRC-2024-0078, Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; US SFR Owner, LLC; Kemmerer Power Station Unit 1 Sent Date:
8/8/2024 9:33:00 PM Received Date:
8/8/2024 9:33:08 PM From:
Abigail Johnson Created By:
saged183@gmail.com Recipients:
"TerraPowerEnvironmental Resource" <TerraPowerEnvironmental.Resource@nrc.gov>
Tracking Status: None Post Office:
salsalabs.org Files Size Date & Time MESSAGE 2356 8/8/2024 9:33:08 PM Options Priority:
Normal Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date: