ML24198A162

From kanterella
Jump to navigation Jump to search
Comment (14) of Peter Sipes on Us Sfr Owner, Llc.; Kemmerer Power Station Unit 1; Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement
ML24198A162
Person / Time
Site: Kemmerer File:TerraPower icon.png
Issue date: 06/19/2024
From: Sipes P
- No Known Affiliation
To:
Office of Administration
References
NRC-2024-0078, 89FR49917 00014
Download: ML24198A162 (1)


Text

PUBLIC SUBMISSION As of: 6/20/24, 6:58 AM Received: June 19, 2024 Status: Pending_Post Tracking No. lxm-772u-5ap4 Comments Due: August 12, 2024 Submission Type: API Docket: NRC-2024-0078 US SFR Owner, LLC; Construction Permit Application Comment On: NRC-2024-0078-0006 US SFR Owner, LLC.; Kemmerer Power Station Unit 1; Notice of Intent To Conduct Scoping Process and Prepare Environmental Impact Statement Document: NRC-2024-0078-DRAFT-0014 Comment on FR Doc # 2024-12810 Submitter Information Name: Peter Sipes Address:

Casper, WY, 82601 Email:sipes23@gmail.com Phone:307-277-9010 General Comment I am in favor of this project. While nuclear power has gotten a bad rap in the past, I think it is time to be realistic about energy needs in this country. Yes, Wyoming has traditionally been reliant on coal and gas, but the future demands other energy sources. Nuclear power has, on the whole, been safe when properly maintained. It will provide solid base-load power in a carbon-neutral fashion that solar and wind may not be able to provide.

As for its location, I would be fine with this near my house, though it is not.

6/20/24, 6:59 AM blob:https://www.fdms.gov/16e2f239-ae48-40f5-908b-724d763be2ec blob:https://www.fdms.gov/16e2f239-ae48-40f5-908b-724d763be2ec 1/1 SUNSI Review Complete Template=ADM-013 E-RIDS=ADM-03 ADD: Patricia Vokoun, Josh Borromeo, Deion Atkinson, Stephanie Devlin-Gill, Mallecia Sutton; Roel Brusselmans, Antoinette Walker-Smith, Mary Neely Comment (14)

Publication Date:8/12/2024 Citation: 89 FR 49917