August 1, 2024 Mr. George Wilson Vice President, Regulatory Affairs TerraPower, LLC 15800 Northup Way Bellevue, WA 98008
SUBJECT:
TERRAPOWER, LLC - FINAL SAFETY EVALUATION OF TOPICAL REPORT NATD-LIC-RPRT-0002, PRINCIPAL DESIGN CRITERIA FOR THE NATRIUM ADVANCED REACTOR, REVISION 1 (EPID L-2021-TOP-0020)
Dear Mr. Wilson:
By letter dated January 24, 2023 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML23024A280), TerraPower, LLC (TerraPower) submitted a Topical Report (TR) entitled, Principal Design Criteria for the Natrium Advanced Reactor, Revision 0, for the U.S.
Nuclear Regulatory Commission (NRC) staffs review. By letter dated April 10, 2024, TerraPower submitted Revision 1 of the TR (ML24101A362). The TR describes the result of TerraPowers process to develop Principal Design Criteria (PDC) for the Natrium advanced reactor and specifically addresses compliance with the construction permit application requirement under Title 10 of the Code of Federal Regulations (10 CFR) 50.34(a)(3)(i).
By email dated March 17, 2023, the NRC staff informed TerraPower that the TR provided sufficient information for the NRC staff to conduct a detailed technical review (ML23074A349). On August 22, 2023, the NRC staff transmitted an audit plan to TerraPower (ML23201A247), and subsequently conducted an audit of materials related to the TR from September 7, 2023, to October 5, 2023. The audit summary was issued on January 30, 2024 (ML24051A029). On April 12, 2024, the NRC staff issued the draft safety evaluation (SE) to TerraPower (ML24103A201).
The enclosed final SE is being provided to TerraPower, because the NRC staff has found NATD-LIC-RPRT-0002, Revision 1, acceptable for referencing in licensing actions to the extent specified and under the limitations and conditions delineated in the TR. The final SE defines the basis for the NRC staffs acceptance of the TR.
The NRC staff requests that TerraPower publish an approved version of this TR within 3 months of receipt of this letter. The approved version should incorporate this letter and the enclosed SE after the title page. The approved version should include a -A (designating approved) following the TR identification symbol.
If you have any questions, please contact Stephanie Devlin-Gill at (301) 415-5301 or via email at Stephanie.Devlin-Gill@nrc.gov.
Sincerely,
/RA/
Joshua Borromeo, Chief Advanced Reactor Licensing Branch 1 Division of Advanced Reactors and Non-Power Production and Utilization Facilities Office of Nuclear Reactor Regulation Project No.: 99902100
Enclosure:
As stated cc: TerraPower Natrium via GovDelivery
Package: ML24197A226 Letter: ML24197A232
Enclosure:
ML24197A231 OFFICE NRR/DANU/UAL1:PM NRR/DANU/UTB2 NRR/DANU/UAL1:LA NAME SDevlin-Gill RAnzalone DGreene DATE 07/15/2024 07/23/2024 07/16/2024 OFFICE OGC NLO NRR/DANU/UTB2:BC NRR/DANU/UAL1:BC NAME MASpencer CdeMessieres JBorromeo DATE 07/25/2024 07/29/2024 08/01/2024