From:
Todd Shewmaker To:
stephen.subosits@westinghouse.com Cc:
Cynthia Taylor; Justin Raudabaugh
Subject:
Westinghouse PMT inspection Document Request Date:
Monday, July 8, 2024 5:48:00 AM Attachments:
Documentation Request - West PMT.docx
- Stephen, The NRC will conduct a routine inspection at the Westinghouse facility the week of August 19-23, 2024. The inspection will implement NRC inspection procedure (IP) 88072, Plant Modifications (Triennial). The inspectors for the inspection are Cynthia Taylor (lead), Justin Raudabaugh and myself. The inspection results will be documented in integrated Inspection Report 70-1151/2024-003. We are requesting that an entrance meeting be scheduled for 1500 on August 19th with an exit meeting scheduled for 1600 on August 23rd. We can discuss debriefs logistics and site tours once we arrive on site. I will need a security badge and any training needed to access your site. I will be out of the office from 7/29 to 8/16 and will need to complete any access tasks prior to 7/26. Please ensure that there are no needs for Cynthia and Justin as far as security, training, etc. Please ensure all three inspectors have access to your electronic document room. Please provide instructions or POC to facilitate this request.
Please find attached the document request to support the Plant Modifications (Triennial) inspection activities. If you have any difficulties or questions concerning the document request, please contact Cynthia Taylor by email or phone at 404-997-4480, or myself via email or 404-997-4673. We will schedule a meeting with you and your staff the week of 7/15 to discuss any questions you may have regarding the document request.
Thank you, Todd Shewmaker Nuclear Regulatory Commission Fuel Facility Inspector
INSPECTION DOCUMENTATION REQUEST Document Request Date:
Monday, July 8, 2024 Licensee: Westinghouse Facility: Hopkins, SC Docket Number: 70-1151 License Number: SNM-1107 Pre-Inspection Visit: N/A Inspection Report Number: 2024-003 Enterprise Number: EPID: I-2024-003-0050 Inspection Dates: August 19 - August 22, 2024 Inspection Procedure(s):
IP 88072 - Plant Modifications (Triennial)
Inspector(s): Cynthia Taylor (Team Leader)
P: 404-997-4480 Sr. Fuel Facility Inspector E: Cynthia.Taylor@nrc.gov U.S. Nuclear Regulatory Commission (NRC)
Region-II Office Justin Raudabaugh P: 404-997-4726 Fuel Facility Inspector E: Justin.Raudabaugh@nrc.gov U.S. NRC Region-II Office Todd Shewmaker P: 404-997-4673 Fuel Facility Inspector E: Todd.Shewmaker@nrc.gov U.S. NRC Region-II Office Accompanying Personnel: None Identified Licensee Contacts:
Licensing Engineer: Steve Subosits, Stephen.subosits@westinghouse.com INSPECTION PROCEDURE 88072 - PLANT MODIFICATIONS (Triennial)
- 1. Information Requested for In-Office Preparation A. Engineering/Configuration Management organization chart B. List of system engineers and assigned systems for the Calciner and Calciner Off-Gas Scrubber Systems C. A list of Plant modifications (PM) program-related procedures including any for development and implementation of post modification testing D. The focus of the inspection will be on mods completed in the Calciner and Calciner Off-Gas Scrubber Systems since their installation until current date. Please provide a list of mods in the area that covers this time frame.
E. List of current outstanding design issues (including open/deferred or canceled engineering action items), temporary modifications, and operator workarounds for the Calciner and Calciner Off-Gas Scrubber Systems F. List of active corrective maintenance work requests/orders for the Calciner and Calciner Off-Gas Scrubber Systems
- 2. Information Requested for On-site Review A. Provide the following documents for the Calciner and Calciner Off-Gas Scrubber Systems:
- a. Piping and Instrument diagrams
- b. Electrical single line diagrams
- c. Process Hazards Analysis (PHA)
- d. System descriptions
- e. Operations procedures
- f. ISA Summary (various revisions upon request)
- g. All modifications/changes related to the Calciner and Calciner Off-Gas Scrubber Systems B. List of condition reports for last 12 months pertaining to Calciner and Calciner Off-Gas Scrubber Systems PM/engineering program activities C. List of open condition reports associated with the Calciner and Calciner Off-Gas Scrubber Systems
- 3. Onsite Coordination A. Please schedule a general plant tour, with focus on the Calciner and Calciner Off-Gas Scrubber Systems, after the entrance meeting PAPERWORK REDUCTION ACT STATEMENT
This letter contains mandatory information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB) approved these information collections (approval number 3150-0009). The burden to the public for these information collections is estimated to average 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />(s) per response. Send comments regarding this information collection to the FOIA, Library and Information Collection Branch, Office of the Chief Information Officer, Mail Stop: T6-A10M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0009) Office of Management and Budget, Washington, DC 20503.
Public Protection Notification The NRC may not conduct nor sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid OMB control number.