Enclosure 1: SMR, LLC Public Meeting Presentation Materials for July 19, 2024 (Np)
ML24190A064
Person / Time
Site: 99902049
Issue date: 07/19/2024
From: Shurtleff C
Holtec, SMR
To:
Office of Nuclear Reactor Regulation
Shared Package
ML24190A062 List:
References
300-USNRC-087
Download: ML24190A064 (1)


Text

www.holtec.com www.smrllc.com SMR-300 Licensing Plans July 19, 2024 Presented by: Clark Shurtleff SMR, LLC, A Holtec International Company Krishna P. Singh Technology Campus One Holtec Boulevard Camden, NJ 08104, USA

[Not Export Controlled]

holtec.com l smrllc.com l Page 2 SMR-300 at Palisades Light water PWR Power output:

1050 MWth

~300 MWe Two SMR-300 units onsite Traditional PWR fuel system Traditional PWR power cycle

holtec.com l smrllc.com l Page 3 SMR-300 at Palisades Part 50 application process construction permit application (CPA) operating license application (OLA) 10 CFR 2.101(a)(9) defines two-part CPA process LWA is part one of the CPA CPA Part Two follows by <18 months Environmental review required before construction begins Existing Palisades SMR-300s Property Line

holtec.com l smrllc.com l Page 4 Meeting Agenda Overall Licensing Timeline Environmental Review Process Planned LWA Scope Planned LWA PSAR Content

holtec.com l smrllc.com l Page 5 Public Comments

holtec.com l smrllc.com l Page 6 Transition to Closed Meeting