Category:Inspection Manual
MONTHYEARInspection Manual Change Notice 24-034, Table of Contents for Inspection Manual Change Notice 24-0342024-10-31031 October 2024 Table of Contents for Inspection Manual Change Notice 24-034 Inspection Manual Change Notice 24-033, Table of Contents for Inspection Manual Change Notice 24-0332024-10-29029 October 2024 Table of Contents for Inspection Manual Change Notice 24-033 Inspection Manual Change Notice 24-031, Table of Contents for Inspection Manual Change Notice 24-0312024-10-25025 October 2024 Table of Contents for Inspection Manual Change Notice 24-031 Inspection Manual Change Notice 24-032, Table of Contents for Inspection Manual Change Notice 24-0322024-10-25025 October 2024 Table of Contents for Inspection Manual Change Notice 24-032 Inspection Manual Change Notice 24-030, Table of Contents for Inspection Manual Change Notice 24-0302024-10-23023 October 2024 Table of Contents for Inspection Manual Change Notice 24-030 ML24150A2392024-07-29029 July 2024 IMC 2562 Light-Water Reactor Inspection Program for Restart of Reactor Facilities Following Permanent Cessation of Power Operations Inspection Manual Change Notice 24-023, Table of Contents for Inspection Manual Change Notice 24-0232024-07-29029 July 2024 Table of Contents for Inspection Manual Change Notice 24-023 Inspection Manual Change Notice 24-022, Table of Contents for Inspection Manual Change Notice 24-0222024-07-26026 July 2024 Table of Contents for Inspection Manual Change Notice 24-022 Inspection Manual Change Notice 24-021, Table of Contents for Inspection Manual Change Notice 24-0212024-07-24024 July 2024 Table of Contents for Inspection Manual Change Notice 24-021 Inspection Manual Change Notice 24-018, Table of Contents for Inspection Manual Change Notice 24-0182024-07-0101 July 2024 Table of Contents for Inspection Manual Change Notice 24-018 Inspection Manual Change Notice 24-016, Table of Contents for Inspection Manual Change Notice 24-0162024-05-30030 May 2024 Table of Contents for Inspection Manual Change Notice 24-016 Inspection Manual Change Notice 24-015, Table of Contents for Inspection Manual Change Notice 24-0152024-05-16016 May 2024 Table of Contents for Inspection Manual Change Notice 24-015 ML24044A2152024-05-10010 May 2024 IMC 0306 Planning, Scheduling, Tracking, and Reporting of the Reactor Oversight Process (ROP) Inspection Manual Change Notice 24-014, Table of Contents for Inspection Manual Change Notice 24-0142024-05-10010 May 2024 Table of Contents for Inspection Manual Change Notice 24-014 ML24033A2992024-04-23023 April 2024 IMC 2562 Light-Water Reactor Inspection Program for Restart of Reactor Facilities Following Permanent Cessation of Power Operations Inspection Manual Change Notice 24-013, Table of Contents for Inspection Manual Change Notice 24-0132024-04-23023 April 2024 Table of Contents for Inspection Manual Change Notice 24-013 Inspection Manual Change Notice 24-012, Table of Contents for Inspection Manual Change Notice 24-0122024-04-22022 April 2024 Table of Contents for Inspection Manual Change Notice 24-012 Inspection Manual Change Notice 24-010, Table of Contents for Inspection Manual Change Notice 24-0102024-03-14014 March 2024 Table of Contents for Inspection Manual Change Notice 24-010 Inspection Manual Change Notice 24-009, Table of Contents for Inspection Manual Change Notice 24-0092024-03-0808 March 2024 Table of Contents for Inspection Manual Change Notice 24-009 Inspection Manual Change Notice 24-008, Table of Contents for Inspection Manual Change Notice 24-0082024-03-0404 March 2024 Table of Contents for Inspection Manual Change Notice 24-008 Inspection Manual Change Notice 24-007, Table of Contents for Inspection Manual Change Notice 24-0072024-02-12012 February 2024 Table of Contents for Inspection Manual Change Notice 24-007 Inspection Manual Change Notice 24-005, Table of Contents for Inspection Manual Change Notice 24-0052024-02-0707 February 2024 Table of Contents for Inspection Manual Change Notice 24-005 Inspection Manual Change Notice 24-006, Table of Contents for Inspection Manual Change Notice 24-0062024-02-0707 February 2024 Table of Contents for Inspection Manual Change Notice 24-006 ML23318A2002024-01-0909 January 2024 IMC 0307 Appendix D, Resident Inspector Retention and Recruitment Program Monitoring and Assessment Inspection Manual Change Notice 24-002, Table of Contents for Inspection Manual Change Notice 24-0022024-01-0909 January 2024 Table of Contents for Inspection Manual Change Notice 24-002 ML23307A0092024-01-0202 January 2024 IMC 2515 Appendix E, Inspection Program Modifications During Public Health Emergencies or Other Conditions Restricting Inspector Onsite Presence Inspection Manual Change Notice 24-001, Table of Contents for Inspection Manual Change Notice 24-0012024-01-0202 January 2024 Table of Contents for Inspection Manual Change Notice 24-001 Inspection Manual Change Notice 23-039, Table of Contents for Inspection Manual Change Notice 23-0392023-12-21021 December 2023 Table of Contents for Inspection Manual Change Notice 23-039 Inspection Manual Change Notice 23-037, Table of Contents for Inspection Manual Change Notice 23-0372023-12-15015 December 2023 Table of Contents for Inspection Manual Change Notice 23-037 ML23318A4262023-12-15015 December 2023 IP 71111.21N.04 Age-Related Degradation ML23234A1762023-12-14014 December 2023 IMC 0309 Reactive Inspection Decision Basis for Power Reactors Inspection Manual Change Notice 23-035, Table of Contents for Inspection Manual Change Notice 23-0352023-12-0606 December 2023 Table of Contents for Inspection Manual Change Notice 23-035 Inspection Manual Change Notice 23-034, Table of Contents for Inspection Manual Change Notice 23-0342023-11-15015 November 2023 Table of Contents for Inspection Manual Change Notice 23-034 Inspection Manual Change Notice 23-033, Table of Contents for Inspection Manual Change Notice 23-0332023-11-0606 November 2023 Table of Contents for Inspection Manual Change Notice 23-033 ML23214A3822023-10-31031 October 2023 IMC 0308, Attachment 2, Technical Basis for Inspection Program ML23222A1682023-10-31031 October 2023 IMC 0611 Appendix D Guidance for Problem Identification and Resolution Inspection Reports Inspection Manual Change Notice 23-032, Table of Contents for Inspection Manual Change Notice 23-0322023-10-31031 October 2023 Table of Contents for Inspection Manual Change Notice 23-032 ML23226A2232023-10-16016 October 2023 IP 71111.08 Inservice Inspection Activities Inspection Manual Change Notice 23-030, Table of Contents for Inspection Manual Change Notice 23-0302023-10-16016 October 2023 Table of Contents for Inspection Manual Change Notice 23-030 Inspection Manual Change Notice 23-028, Table of Contents for Inspection Manual Change Notice 23-0282023-09-19019 September 2023 Table of Contents for Inspection Manual Change Notice 23-028 Inspection Manual Change Notice 23-026, Table of Contents for Inspection Manual Change Notice 23-0262023-08-28028 August 2023 Table of Contents for Inspection Manual Change Notice 23-026 ML23191A5172023-08-18018 August 2023 IP 71111.07 Heat Exchanger/Sink Performance Inspection Manual Change Notice 23-024, Table of Contents for Inspection Manual Change Notice 23-0242023-08-17017 August 2023 Table of Contents for Inspection Manual Change Notice 23-024 Inspection Manual Change Notice 23-023, Table of Contents for Inspection Manual Change Notice 23-0232023-08-11011 August 2023 Table of Contents for Inspection Manual Change Notice 23-023 Inspection Manual Change Notice 23-021, Table of Contents for Inspection Manual Change Notice 23-0212023-07-27027 July 2023 Table of Contents for Inspection Manual Change Notice 23-021 Inspection Manual Change Notice 23-020, Table of Contents for Inspection Manual Change Notice 23-0202023-07-14014 July 2023 Table of Contents for Inspection Manual Change Notice 23-020 ML23192A8372023-07-12012 July 2023 IP 71111.21N.04 Age-Related Degradation ML23151A5462023-06-26026 June 2023 IMC 2515 Appendix C, Special and Infrequently Performed Inspections Inspection Manual Change Notice 23-018, Table of Contents for Inspection Manual Change Notice 23-0182023-06-26026 June 2023 Table of Contents for Inspection Manual Change Notice 23-018 ML23055B0532023-06-26026 June 2023 IMC 2515 Appendix E, Inspection Program Modifications During Public Health Emergencies or Other Conditions Restricting Inspector Onsite Presence 2024-07-29
[Table view]Some use of "" in your query was not closed by a matching "". |
Text
Attachment 82001.05
PROCEDURE QUALITY
82001.05-01 INSPECTION OBJECTIVES
01.01 To verify the extent of condition of performance problems in response to emergency conditions
01.02 To provide inspection information in support of the determination of whether the licensee EP program can meet the EP Cornerstone Performance Expectation and whether the program can operate in the licensee response band.
820015-02 INSPECTION REQUIREMENTS
02.01 Implement Inspection Procedure 71114, Reactor Safety -
Emergency Preparedness, Attachment 4, Emergency Action Level and Emergency Plan Changes, IP elements designated for emergency action level (EAL) changes. If this inspection element has been recently performed, to the satisfaction of the inspector, it need not be performed again in its entirety. If the EAL procedure in its entirety is in need of verification, review all EALs against the approved guidance.
02.02 Review notification procedures for adequacy.
02.03 Review PAR development procedures for adequacy.
02.04 Review other Emergency Plan Implementing Procedures for adequacy.
02.05 Determine the effectiveness of licensee corrective actions in addressing procedure quality issues.
02.06 Provide inspection information on the results of the procedure review to support the determination of whether ERO Performance supports the Cornerstone Performance Expectation.
02.07 Provide inspection information on the results of the procedure review to support the determination of whether the EP program can operate in the licensee response band.
82001.05-03 INSPECTION GUIDANCE
This section contains both general and specific guidance, and these are not numbered to correspond with inspection requirements in Section 02.
Issue Date: 05/22/00 82001.05 03.01 Requirements for EALs may be found in 10 CFR 50.47(b)(4) and 10 CFR Part 50, Appendix E, Section IV.B. Some licensees will have event-based EALs. Some licensees will have symptom-based EALs that often are based on the status of fission product barriers.
Some licensees will have EALs based on the status of critical safety functions and their relationship to the status of fission product barriers. In all cases it should be possible to compare EAL schemes to the example initiating conditions in Appendix 1 of NUREG-0654 or NUMARC/NESP-007, Revision 2, and this comparison should result in equivalent classifications. The licensee should indicate which methodology has been utilized. Classification procedures, tables and EALs should be essentially identical to those last submitted to the NRC for approval with only minor non-substantive revisions. several of which may relate to different classification levels. The inspector may verify that the licensee's EALs are consistent in range, units, and conversion factors with appropriate control room instrumentation and that the decisional aids used for event classification in the control room, the Technical Support Center (TSC), and the Emergency Operations Facility (EOF) are readily available and consistent. The inspector should be alert for any management directives that would delay classification until management notifications or other actions not immediately necessary for public health and safety are performed.
03.02 The inspector should determine whether the licensee has adequate procedures to direct the user to notify offsite authorities accurately and promptly of emergency conditions. The content of initial and follow-up emergency messages to offsite authorities should be verified as adequate with regard to data and information requirements. The inspector should review the licensee's notification procedures for consistency with the emergency classification and action level scheme. One important aspect of the notification procedures is the existence in the procedures of the expectation to promptly (within 15 minutes) initiate notifications after declaring an emergency (see 10 CFR Part 50, Appendix E, Section IV.D.3). Verify that usable and current procedures exist in the control room and licensee's emergency response facilities. Verify that procedures contain provisions for message verification.
03.03 Initial and follow-up emergency messages should be consistent with the guidance of Part II, Sections E.3 and E.4, of NUREG-0654. As a minimum, messages should contain the following data:
- a. classification of the emergency
- b. emergency action level upon which the emergency declaration is based
- c. a brief description of the plant conditions supporting the classification
- d. the status of any offsite releases of radioactive material
- e. meteorological conditions at the release point
- f. offsite protective action recommendations or whether no such recommendations are required
82001.05 Issue Date: 05/22/00 03.04 The organizational elements, responsibilities, and authorities in the emergency plan implementing procedures (EPIPs) for protective action recommendations should be compared with those in the emergency plan. The emergency plan implementing procedures should clearly specify a methodology that enables the licensee to make protective action recommendations appropriate for the particular plant conditions (see NUREG-0654, Appendix 1, and NUREG-0654, Supplement 3, EPA-400, and IE Information Notice 83-28, dated May 4, 1983). Verify the licensees procedures for making offsite protective action recommendations are able to be used by the on-shift crew with the information available to them in the control room. Verify that the licensees procedures provide for the generation of protective action recommendations on an ad-hoc basis for distances beyond the ten-mile plume exposure emergency planning zone. PARs should not deviate substantially from those contained in Federal guidance (NUREG-0654, Supplement 3 and EPA-400) unless the licensees agreement with the offsite agencies specifies such a deviation. In such cases, review the licensees basis for its PAR policy.
03.05 Determine whether the licensee has adequate procedures to direct the user to develop source term estimates and projections of offsite dose consequences for offsite releases of radioactive material under accident conditions. The licensee should have adequate procedures to estimate the source term from liquid and airborne releases (radioactive inventory available for release and the release pathway), under all anticipated accident conditions; based on reactor systems status, core conditions, and containment integrity.
03.06 Dose assessment procedures should be reviewed to assure that they are consistent with the EPA "Manual of Protective Action Guides and Protective Actions for Nuclear Incidents." Consistent with the guidance in the EPA Manual, the dose assessment procedures and method should account for thyroid dose commitment and the committed effective dose equivalent from inhalation and the external effective dose equivalent from plume exposure and exposure to the ground deposition of radionuclides. Procedures should be available to verify that feedback from field monitoring teams can be incorporated into the dose projection.
03.07 The evaluation of licensee EPIPs should be used to determine whether the identified extent of condition is adequate and provide inspection information to support the determinations listed in the inspection objectives.
82001.05-04 RESOURCE ESTIMATE
It is estimated that conduct of this attachment will take 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br />.
END
Issue Date: 05/22/00 82001.05 82001.05 Issue Date: 05/22/00