ML24157A185

From kanterella
Jump to navigation Jump to search
Comment (6) E-mail Regarding Kairos Hermes 2 Draft EA
ML24157A185
Person / Time
Site: Hermes File:Kairos Power icon.png
Issue date: 05/23/2024
From: Public Commenter
Public Commenter
To:
NRC/NMSS/DREFS
NRC/NMSS/DREFS
References
89FR32462
Download: ML24157A185 (3)


Text

From: Melodie McDonald <Melodie@eteconline.org>

Sent: Thursday, May 23, 2024 2:22 PM To: Kairos-Hermes2Environmental Resource

Subject:

[External_Sender] Docket ID NRC-2023-0138

To Whom It May Concern:

I am writing in support of the Hermes2 project. The deployment of the Hermes reactor series in East Tennessee represents a balanced and forward-thinking approach to energy production. It combines the benefits of advanced nuclear technology with local economic growth, energy security, and environmental stewardship. By supporting the Hermes project, we can ensure a sustainable and prosperous future for East Tennessee, while also contributing to broader national and global energy goals. The introduction of the Hermes reactor series in East Tennessee represents a significant advancement in nuclear technology with numerous local and regional benefits, such as:

  • Advanced Safety Features: The Hermes reactors are designed with state-of-the-art safety mechanisms. Innovations in reactor technology mean enhanced protection against accidents, with features that automatically shut down the reactor in emergency situations, thus protecting the community and the environment.
  • Economic Growth and Job Creation: The development and operation of the Hermes reactors will bring substantial economic benefits to East Tennessee. From the construction phase through to ongoing operations, these reactors will create high-skilled jobs and foster economic growth in the region.
  • Energy Security: By contributing to a diversified energy mix, the Hermes reactors will enhance energy security for East Tennessee. This diversification reduces dependence on any single energy source, thereby increasing resilience against supply disruptions.
  • Environmental Stewardship: Utilizing the latest advancements in nuclear technology, the Hermes reactors are designed to minimize environmental impact.

This includes advanced waste management techniques that reduce the volume and toxicity of nuclear waste, ensuring that the local environment is protected for future generations.

  • Support for Renewable Energy Integration : The stable base load power provided by the Hermes reactors can complement intermittent renewable energy sources such as wind and solar. By ensuring a reliable power supply, these reactors can facilitate greater integration of renewables into the grid, supporting overall sustainability goals.
  • Research and Development Hub : East Tennessee has the potential to become a hub for nuclear research and development. The presence of the Hermes reactors will attract top-tier talent and foster partnerships with local universities and research institutions. This can lead to technological innovations and further advancements in the nuclear field.

Nuclear energy, when managed with the latest safety and efficiency innovations, remains a critical component of our energy strategy. The Hermes reactor would exemplify the potential of nuclear technology to meet our energy needs in a safe, reliable, and environmentally responsible manner.

Warm Regards,

Melodie Melodie McDonald Director of Operations East Tennessee Economic Council (ETEC) 1201 Oak Ridge Turnpike, Suite 100 Oak Ridge, TN 37830 Office: 865-946-3246 Mobile: 865-851-6104 melodie@eteconline.org www.eteconline.org

Federal Register Notice: 89FR32462 Comment Number: 6

Mail Envelope Properties (BN8PR10MB35062565049F0331AA404113D5F42)

Subject:

[External_Sender] Docket ID NRC-2023-0138 Sent Date: 5/23/2024 2:22:09 PM Received Date: 5/23/2024 2:22:20 PM From: Melodie McDonald

Created By: Melodie@eteconline.org

Recipients:

"Kairos-Hermes2Environmental Resource" <Kairos-Hermes2Environmental.Resource@nrc.gov>

Tracking Status: None

Post Office: BN8PR10MB3506.namprd10.prod.outlook.com

Files Size Date & Time MESSAGE 3220 5/23/2024 2:22:20 PM

Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: