Kairos Power, LLC Thermo-Physical Properties Audit Plan
ML24150A408
Person / Time
Site: 99902069
Issue date: 05/29/2024
From: Cuadrado De Jesus S
Office of Nuclear Reactor Regulation
To:
Kairos Power
References
Download: ML24150A408 (1)


Text

KAIROS POWER, LLC - THERMOPHYSICAL PROPERTIES AUDIT PLAN (CAC/EPID NO. 000431/99902069/L-2024-LRM-0072)

APPLICANT INFORMATION Applicant:

Kairos Power LLC Applicant Address:

707 W. Tower Ave, Alameda, CA 94501 Plant Name(s) and Unit(s):

Kairos - Hermes Test Reactor Project No(s).:

99902069

Background:

Kairos Power LLC (Kairos) began pre-application engagement with the U.S. Nuclear Regulatory Commission (NRC) staff on its Kairos Power Fluoride-Salt-Cooled, High-Temperature Reactor (KP-FHR) in October 2018. In December of 2020, Kairos announced that the Hermes test reactor would be used to support future development of its KP-FHR.

By letter dated January 16, 2020, Kairos submitted TR KP-TR-005, Reactor Coolant for the Kairos Power Fluoride Salt-Cooled High Temperature Reactor (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20016A486). This TR provided key thermophysical properties for use in safety analyses. By letter dated July 16, 2020, the NRC staff approved the TR subject to Limitations and Conditions (ML20140A147). Limitation and Condition 4 pertains to performing confirmatory analyses to ensure referenced historical data is adequate and applicable to Kairos reactor designs. Kairos plans to submit an operating license (OL) application for Hermes per Title 10 of the Code of Federal Regulations (10 CFR), which will include the Hermes Final Safety Analysis Report (FSAR). TR KP-TR-005 will be a key reference in the Hermes and KP-FHR FSARs and its use will require that TR Limitations and Conditions are satisfied.

Purpose:

The purpose of this audit is for the NRC staff to gain a better understanding of Kaiross process to determine that referenced historical data is appropriate to use in safety analyses for the Hermes and KP-FHR reactor designs in accordance with TR KP-TR-005 Limitation and Condition 4.

Regulatory Audit The basis for the audit includes the following regulatory requirements: 10 CFR 50.34(a)(1)(ii)(D) and 50.34(a)(4).

Regulatory Audit Scope This audit will focus on information provided by Kairos on an online reference portal.

Information and Other Material Necessary for the Regulatory Audit The NRC staff is requesting access to internal documents associated with confirmation of thermophysical property data and correlations and their associated uncertainties. In addition, the staff is requesting any documents referenced in the evaluation of thermophysical property data that are not already available to the NRC staff. The staff request the following specific documents be made available:

Review of Flibe Surface Tension Legacy Data, Revision 0 Vapor Pressure: Flibe Property Attribute Review (FPAR) of Legacy Data, Revision 1.

Review of Flibe Thermophysical Property Legacy Data: Melting Point, Revision 0.

Review of Flibe Thermophysical Property Legacy Data: Latent Heat, Revision 0.

Review of Flibe Thermophysical Property Legacy Data: Density, Revision 0 Review of Flibe Thermophysical Property Legacy Data: Thermal Conductivity, Revision 0 Review of Flibe Thermophysical Property Legacy Data: Heat Capacity, Revision 0 Review of Flibe Thermophysical Property Legacy Data: Viscosity, Revision 0 Additional documents may be requested as needed.

Team Assignments Alexander Chereskin Materials Engineer, Audit Lead Pravin Sawant Senior Nuclear Engineer Odunayo Ayegbusi Reactor Operations Engineer (Quality Assurance)

Samuel Cuadrado Project Manager Additional audit team members may be added as needed.

Logistics To maximize NRC staff participation and provide Kairos with the time needed to make available all thermophysical properties data documents the audit will be conducted in two phases.0F1 Phase 1 Entrance Meeting May 29, 2024 Exit Meeting June 14, 2024 1 precise dates for Phase 2 are to be determined.

Phase 2 Entrance Meeting September, 2024 Exit Meeting November, 2024, Audit meetings will take place in a virtual format, using Microsoft Teams, or via other, similar platform. Audit meetings will be scheduled on an as needed basis after the entrance meeting and once the NRC staff has had the opportunity to review any documents placed in the online reference portal.

Special Requests The NRC staff requests that Kairos ensure that its technical staff are available to answer questions during the audit.

Deliverables At the completion of the audit, the audit team will issue an audit summary within 90 days after the exit meeting but will strive for a shorter duration. The audit summary will be declared and entered as an official agency record in ADAMS and be made available for viewing through the publicly available records component of ADAMS.

References Title 10 of the Code of Federal Regulations.

If you have questions about this audit, please contact me at 301-415-2946 or by email at samuel.cuadradodejesus@nrc.gov.

Date: May 29, 2024 Samuel Cuadrado, Project Manager Advanced Reactor Licensing Branch 1 Division of Advanced Reactors and Non-Power Production and Utilization Facilities Office of Nuclear Reactor Regulation Samuel Cuadrado de Jesus Digitally signed by Samuel Cuadrado de Jesus Date: 2024.05.29 10:12:37 -04'00'