ML24128A082

From kanterella
Jump to navigation Jump to search
March 19, 2024 Summary of Public Meeting with X Energy Xe-100 Core Design Methods and Analysis
ML24128A082
Person / Time
Site: 99902071
Issue date: 05/09/2024
From: Dukes O
NRC/NRR/DANU/UAL2
To: Michael Wentzel
NRC/NRR/DANU
References
Download: ML24128A082 (1)


Text

5/09/2024 MEMORANDUM TO:

Michael Wentzel, Chief Advanced Reactor Licensing Branch 2 Division of Advanced Reactors and Non-power Production and Utilization Facilities Office of Nuclear Reactor Regulation FROM:

Ondra Dukes, Project Manager /RA/

Advanced Reactor Licensing Branch 2 Division of Advanced Reactors and Non-power Production and Utilization Facilities Office of Nuclear Reactor Regulation

SUBJECT:

SUMMARY

OF THE MARCH 19, 2024, OBSERVATION MEETING WITH X ENERGY, LLC., REGARDING THE XE-100 REACTOR CORE DESIGN METHODS AND ANALYSIS TOPICAL REPORT SUBMITTAL Meeting Information:

Applicant: X Energy, LLC. (X-energy)

Project No.: 99902071 Public Meeting Notice Agencywide Documents Access and Management System (ADAMS)

Accession No.: ML24066A174 Meeting Attendees: See the enclosure for a list of meeting attendees.

CONTACT:

Ondra Dukes, NRR/DANU 301-415-0537

Meeting Summary:

The U.S. Nuclear Regulatory Commission (NRC) staff conducted the meeting in accordance with NRC Management Directive 3.5, Attendance at NRC Staff-Sponsored Meetings (ADAMS Accession No. ML21180A271). The meetings objective was for X-energy to discuss its planned Xe-100 reactor core design analysis and methods topical report (TR) submittal. The main points of discussion during the meeting included:

The NRC staff noted the need to further understand the energy group structures associated with cross-section libraries and calculational methods during the review of the TR.

The NRC staff also inquired whether graphite reflector density changes would be reflected in the model, and X-energy stated that they are not currently accounted for but can be modeled.

The NRC staff discussed the need to understand what method is used to calculate resonance integrals and why it is appropriate for the application. X-energy stated that these details would be defined in the TR.

The NRC staff inquired regarding the meshes used in the calculational methods.

X-energy discussed that the neutronic and thermal-hydraulic meshes within the VSOP model are the same, and that further information requested by NRC staff is detailed in the TR.

The NRC staff discussed the need for X-energy to submit a complete validation and verification for review and approval. X-energy expressed its understanding that the TR would be subject to limitations until the V&V is complete.

A member of the public, representing the Union of Concerned Scientists, discussed concerns with the timing of the upcoming construction permit application considering the current stage of code validation and requested detail regarding the type of information that will be required regarding transient calculations and how uncertainties for functional containment will be addressed. The NRC staff noted the difference in the level of detail required for the construction permit application versus the operating license application.

The NRC staff also indicated that the transient analysis topic will be covered in a future TR submittal pertaining to transient and safety analyses.

No regulatory decisions were made during this meeting.

Project No.: 99902071

Enclosure:

List of Meeting Attendees cc: X-energy Xe-100 via GovDelivery

SUBJECT:

SUMMARY

OF THE MARCH 19, 2024, OBSERVATION MEETING WITH X ENERGY, LLC., PERTAINING TO THE XE-100 REACTOR CORE DESIGN METHODS AND ANALYSIS TOPICAL REPORT SUBMITTAL DATED: MAY 09, 2024 DISTRIBUTION:

PUBLIC RidsNrrDanuUal1 Resource RidsNrrDanuUal2 Resource RidsNrrDanu Resource RidsAcrs_MailCTR Resource DBeacon, NRR BParks, NRR GOberson, NRR KArmstrong, RES IJung, NRR LKingsbury, NRR IBaek, NRR ABielen, RES TZaki, RES SBajorek, RES NHudson, RES NTehrani, RES AMuniz, NRR ODukes, NRR JHernandez, NRR ADAMS Accession Number: ML24128A082 OFFICE NRR/DANU/UAL2:PM NRR/DANU/UAL2:LA NRR/DANU/UAL2:BC NRR/DANU/UAL2:PM NAME ODukes CSmith MWentzel ODukes DATE 05/08/2024 05/08/2024 05/09/2024 05/09/2024 OFFICIAL RECORD COPY

Enclosure LIST OF MEETING ATTENDEES OBSERVATION MEETING WITH X ENERGY, LLC., REGARDING THE XE-100 REACTOR CORE DESIGN METHODS AND ANALYSIS TOPICAL REPORT SUBMITTAL March 19, 2024 Name Organization Ondra Dukes U.S. Nuclear Regulatory Commission (NRC)

Adrian Muniz NRC Dan Beacon NRC Benjamin Parks NRC Inseok Baek NRC Lance Kingsbury NRC Greg Oberson NRC Kenneth Armstrong NRC Andrew Bielen NRC Derek Widmayer NRC Tarek Zaki NRC Ian Jung NRC Lisa L. Williams NRC Steve Bajorek NRC Jorge Hernandez Munoz NRC Nathanael Hudson NRC Nazila Tehrani NRC Maggie Staiger X Energy, LLC. (X-energy)

Jessica Maddocks X-energy Sonat Sen X-energy Wian Van Der Merwe X-energy Doug Kalinousky X-energy Herman van Antwerpen X-energy Patrick Robinson X-energy Steve Vaughn X-energy Mike Melton X-energy Jim Fogarty X-energy Feltner, Mark X-energy Eben Mulder X-energy Michael Pearce NextEra Leigh Lloveras The Breakthrough Institute Lisa Bruedigan TX Department of State Health Services Edwin Lyman Union of Concerned Scientists Kaz Core Solutions Christian Borchert

Yan Gao Mark Paul Jana Bergman Barry Lee Myers Ruben Rodriguez Jose Garcia Dominik Muszynski Blake Cole William Maher Matthew Harris Sohaib Malik Tu Le Michael Howard Brian E Jelke Atilla Kurt