Enclosure 1: SMR, LLC Meeting Public Presentation Materials for May 8, 2024, (Np)
ML24122C701
Person / Time
Site: 99902049
Issue date: 05/08/2024
From:
Holtec, SMR
To:
Office of Nuclear Reactor Regulation
Shared Package
ML24122C699 List:
References
160-USNRC-081
Download: ML24122C701 (1)


Text

www.holtec.com www.smrllc.com SMR-300 Design Overview May 2024 Holtec International Krishna P. Singh Technology Campus One Holtec Boulevard Camden, NJ 08104, USA

[Not Export Controlled]

holtec.com l smrllc.com l Page 2 Agenda Speaker Topic Time J. Hawkins SMR-300 at Palisades 9:30-9:45 Public Comments 9:45-10:00 L. Zaidan, R. Rosas Core Design 10:00-10:25 C. Lietwiler RCS and ESF Systems Design 10:25-10:50 E. Scully, R. Trotta Auxiliary Systems & Balance of Plant Design 10:50-11:00 Staff Q&A 11:00-11:20 Break 11:20-11:30 A. Bommareddi Plant Layout, Structures & Modularity 11:30-11:45 P. Essner I&C and Electrical Design 11:45-12:00 C. Lietwiler, S. McCloskey Safety Analyses 12:00-12:20 A. Brenner Licensing and Timelines 12:20-12:30 Staff Q&A, Closing 12:30-1:00

holtec.com l smrllc.com l Page 3 SMR-300 at Palisades Justin Hawkins

holtec.com l smrllc.com l Page 4 SMR-300 Design Evolution Light water PWR Power output: 1050 MWt, ~300MWe Design lifetime: 80 years Forced circulation (2 RCPs, 2 hot legs, and 2 cold legs)

Once-through steam generator Traditional PWR fuel system

holtec.com l smrllc.com l Page 5 SMR-300 Design Evolution Upgrades:

Increased power output: 160 MWe ~300MWe Removed FOAK forging connecting RPV and SG Natural circulation Forced circulation (Maintain natural circulation for DHR)

Reduced reactor length; reduced steam generator volume Increased integral pressurizer volume for operational control

holtec.com l smrllc.com l Page 6 SMR-300 Design Evolution Benefits:

Maintained all passive safety systems More proven off-the-shelf technology Broader application of PWR fleet operating experience Less FOAK testing (CRDM, CHF)

holtec.com l smrllc.com l Page 7 Why Palisades?

State and Local Support Demand for Energy Existing Palisades Critical Dunes SMR-300s Property Line

holtec.com l smrllc.com l Page 8 SMR-300 Milestones Commence Testing (I/SET) at INL - Early 2025 Construction Permit Application (CPA) submittal - June 2026 Commence Construction - End of 2027 [subject to potential LWA in advance of the CPA]

holtec.com l smrllc.com l Page 9 Public Comments