Ile Form 3.2-1 Admin JPM Outlines - Final
ML24120A161
Person / Time
Site: Point Beach  
(DPR-024, DPR-027)
Issue date: 03/18/2024
From:
NRC/RGN-III
To:
Point Beach
B. Bergeon
References
Download: ML24120A161


Text

Administrative Topic (Step 1) 20 15 10 20 Form 3.2-1 Administrative Topics Outline Facility: Point Beach Nuclear Plant Date of Examination: 03/04/24-03/15/24 Exam Level: RO SRO Activity and Associated K/A (Step 2)

Type Code (Step 3)

Operating Test Number: ____________

Conduct of Operations PBN JPM P000.002d.COT R

D Perform Shutdown Margin Calculation for an Operating Reactor 003 AK1.07 (3.8)

Required Shutdown Margin calculated within the specified tolerance (+/- 20 pcm).

Last used: ILT NRC 2015 Minutes Conduct of Operations PBN JPM P010.004.COT Equipment Control PBN JPM P075.005a.COT S

D Calculate and Adjust PPCS Forebay and Pump Bay Alarm Setpoints 2.1.14 (3.9/4.3)

Calculate new Forebay and Pump Bay level alarm setpoints by filling out PBF-2124 and then making required level setpoint changes on the PPCS System.

Last used: ILT NRC 2015 Minutes Perform a Pressurizer Heater Group Input Test Calculation 2.1.25 (3.9)

Properly calculate and record pressurizer heater inputs per TS-43 1T-1D Unit 1, Pressurizer Heater Group Energy Input Test Last used: ILT NRC 2019 Minutes R

D Radiation Control PBN JPM P083.006a.COT S

N Source Check 1(2)RE-305 Low Range Noble Gas 2.3.11 (3.8)

Request Data from the Radiation Monitoring System.

New Minutes Emergency Plan N/A

Administrative Topic (Step 1) 20 20 30 30 13 Form 3.2-1 Administrative Topics Outline Facility: Point Beach Nuclear Plant Date of Examination: 03/04/24-03/15/24 Exam Level: RO SRO Operating Test Number: ____________

Activity and Associated K/A (Step 2)

Type Code (Step 3)

Conduct of Operations PBN JPM P001.003e.COT R

D Verify Shutdown Margin Calculation for an Operating Reactor 003 AK1.07 (3.8)

Required Shutdown Margin calculated within the specified tolerance (+/- 50 pcm).

Last used on: ILT NRC 2017 Minutes Conduct of Operations PBN JPM P119.203d.SRO R

D Complete a Calculation Review TS-32 Attachment B 2.1.25 (4.2)

Identify discrepancies (two) not properly noted by the Control Operator, and determine that test results for CET based subcooling margin are NOT within acceptance criteria.

Last used on ILT NRC 2017 Minutes Equipment Control PBN JPM P119.102a.SRO R

N P

Authorize performance of surveillance/test on shift 2.2.13 (4.3)

Surveillance 1-TS-CCW-001 reviewed and valve positions determined Created new from old SRO question with CCW HX alignments Minutes Radiation Control PBN JPM P119.903.SRO R

D Remove RMS Channel from Service 2.3.13 (4.3)

Remove 1RE-215 Condenser Air Ejector Gas Monitor Unit 1 from service per PBF-2068g - 1RE-215.

Last used: ILT NRC 2009 Minutes Emergency Plan PBN JPM P028.002a.EMR (Modified to version b)

R M

Formulate Protective Action Recommendations 2.4.44 (4.4) (SRO Only)

Give a PARS recommendation for the given conditions and document on the NARS form within 13 minutes.

Modified. Original last used: ILT NRC 2017 Minutes