Administrative Topic (Step 1) 20 15 10 20 N/A Emergency Plan Radiation Control PBN P083.006.COT S

N Start U1 Containment Forced Vent 2.3.11 (3.8)

Request Data from the Radiation Monitoring System.

New Minutes Perform a Pressurizer Heater Group Input Test Calculation 2.1.25 (3.9)

Properly calculate and record pressurizer heater inputs per TS-43 1T-1D Unit 1, Pressurizer Heater Group Energy Input Test Last used: ILT NRC 2019 Minutes R

D D

Calculate and Adjust PPCS Forebay and Pump Bay Alarm Setpoints 075 A1.02 (3.1)

Calculate new Forebay and Pump Bay level alarm setpoints by filling out PBF-2124 and then making required level setpoint changes on the PPCS System.

Last used: ILT NRC 2015 Minutes Conduct of Operations PBN JPM P010.004.COT Equipment Control PBN JPM P075.005a.COT S

Perform Shutdown Margin Calculation for an Operating Reactor 003 AK1.07 (3.8)

Required Shutdown Margin calculated within the specified tolerance (+/- 20 pcm).

Last used: ILT NRC 2015 Minutes Conduct of Operations PBN JPM P000.002d.COT R

D Form 3.2-1 Administrative Topics Outline Facility: Point Beach Nuclear Plant Date of Examination: 03/04/24-03/15/24 Exam Level: RO SRO Activity and Associated K/A (Step 2)

Type Code (Step 3)

Operating Test Number: ____________

Administrative Topic (Step 1) 20 20 20 30 15 Formulate Protective Action Recommendations 2.4.44 (4.4) (SRO Only)

Give a PARS recommendation for the given conditions and document on the NARS form within 13 minutes.

Modified. Original last used: ILT NRC 2017 Minutes Emergency Plan PBN JPM P028.002a.EMR (Modified to version b)

R M

Remove RMS Channel from Service 2.3.13 (4.3)

Remove 1RE-215 Condenser Air Ejector Gas Monitor Unit 1 from service per PBF-2068g - 1RE-215.

Last used: ILT NRC 2009 Minutes Radiation Control PBN JPM P119.903.SRO R

D Review a Clearance Order for Accuracy 2.2.13 (4.3)

Clearance is reviewed and the three errors noted in this JPM are identified.

Last used: ILT NRC 2023 Minutes Equipment Control PBN JPM NUCTAG104a.SRO R

D P

Complete a Calculation Review TS-32 Attachment A 2.1.25 (4.2)

Identify discrepancies (two) not properly noted by the Control Operator, and determine that test results for CET based subcooling margin are NOT within acceptance criteria.

Last used on ILT NRC 2017 Minutes Conduct of Operations PBN JPM P119.203d.SRO R

D Verify Shutdown Margin Calculation for an Operating Reactor 003 AK1.07 (3.8)

Required Shutdown Margin calculated within the specified tolerance (+/- 50 pcm).

Last used on: ILT NRC 2017 Minutes Conduct of Operations PBN JPM P001.003e.COT R

D Form 3.2-1 Administrative Topics Outline Facility: Point Beach Nuclear Plant Date of Examination: 03/04/24-03/15/24 Exam Level: RO SRO Operating Test Number: ____________

Activity and Associated K/A (Step 2)

Type Code (Step 3)