ML24092A122
From kanterella
Jump to navigation
Jump to search
ML24092A122 | |
Person / Time | |
---|---|
Issue date: | 03/29/2024 |
From: | Westinghouse, Westinghouse |
To: | Office of Nuclear Regulatory Research |
Christopher Cook 3014156397 | |
Shared Package | |
ML24092A120 | List: |
References | |
Download: ML24092A122 (6) | |
Similar Documents from Westinghouse | |
---|---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24261B9482024-09-17017 September 2024
[Table view]Some use of "" in your query was not closed by a matching "".ACRS 9-20 PWROG Presentation Slides PWROG-18068 ML24197A1742024-07-18018 July 2024 Public Workshop on Risk Metrics for Advanced Reactors - Presentation from Westinghouse - Challenges and Lessons Learned in Applying NEI 18-04 During Active Design ML24178A0302024-06-26026 June 2024 Presentation Supporting Meeting with U. S. Nuclear Regulatory Commission and NEI Concerning Power Uprates Westinghouse – PA-SEE-2067 DVR Applications Nuclear Industry Power Uprating Workshop – May 29, 2024 ML24092A1222024-03-29029 March 2024 Westinghouse, Kravec Slides ML24093A0182024-03-29029 March 2024 Kravec_Revised-Slides ML24053A2062024-01-31031 January 2024 Westinghouse - NRC Hf Remote Operations Workshop - 1-31-2024 ML23324A2432023-10-24024 October 2023 S1P11 - Huegel 2 Additive Manufacturing at Westinghouse - NRC October 2023 Workshop ML23271A1612023-09-28028 September 2023 PSEG Non-Proprietary Presentation for Pre-submittal Meeting on September 28, 2023 ML23251A1212023-09-12012 September 2023 RHR Flow Rate Reduction During Mode 6 Operation at 23 Ft. Refueling Water Level Technical Specification Change NON-PROPRIETARY Slides ML23174A0562023-06-26026 June 2023 Slides for TSTF-505 Pre-Submittal Public Teleconference 6-26-2023 ML23160A1512023-06-15015 June 2023 25 - Industry - Industry Perspectives on ASME III and XI Pre-Service Inspection ML22319A0012022-11-14014 November 2022 Constellation Energy Generation, LLCs Presentation for November 10, 2022 Public Meeting with NRC ML22164A8082022-06-13013 June 2022 Westinghouse, Presentation GLIMM-RPS-PM-L1-000008, Revision 0 ML22080A1522022-03-21021 March 2022 Non-Proprietary Presentation for March 31, 2022 Pre-Submittal Meeting with Constellation Energy Generation, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 ML21327A0762021-11-23023 November 2021 Sc Solutions Presentation on Efficient Licensing Pathway for Nonlinear Seismic Analysis ML21278A5452021-10-20020 October 2021 Digital Modernization Project LAR Pre-submittal Meeting Presentation Slides October 20, 2021 ML21183A0632021-06-24024 June 2021 Encl 2: Publicly Available Presentation, Request for Amendment of USA/9380/B(U)F-96 for Model No. Traveller Std and Xl Packages ML21060B2112021-02-26026 February 2021 Westinghouse Electric Company Pre-Submittal of Presentation for Meeting to Discuss Design Certification Extension for AP1000 ML21026A0212021-02-0404 February 2021 February 4, 2021 Columbia Risk Reduction & Environmental Update ML20211L0772020-07-28028 July 2020 Presentations for July 30, 2020 Higher Burnup Workshop - EPRI Presentation ML20143A0422020-05-22022 May 2020 Presentation Slides - Technical Justification for the Ghent Version 2 Probe Qualification and Probability of Detection - May 26, 2020 (Non-Proprietary Version) ND-19-0962, AP1000 Structural Reconciliation - Westinghouse Electric Company & Southern Nuclear Company Technical Exchange Meeting: August 13, 20192019-08-0202 August 2019 AP1000 Structural Reconciliation - Westinghouse Electric Company & Southern Nuclear Company Technical Exchange Meeting: August 13, 2019 ML18311A1822018-11-0707 November 2018 November 13, 2018, Joseph M. Farley Nuclear Power Plant, Public Meeting Slides Regarding Spent Fuel Pool Criticality Analyses and Measurement Uncertainty Recovery (Mur) Pre-Application Meeting ML18299A0492018-10-30030 October 2018 Accident Analyses Methodology Transition LAR Public Meeting ML17296A2032017-10-0303 October 2017 Accident Tolerant Fuel Lead Test Assembly Deployment ML15209A8922015-07-23023 July 2015 Westinghouse Electric Co., - WCAP-10325-P-A Methodology Material Properties as Applied in the Watts Bar Containment Analysis. TSTF-14-09, TSTF Handout from 02/05/2015 Meeting - Draft TSTF Letter TSTF-425 Requirements Clarification2015-02-0505 February 2015 TSTF Handout from 02/05/2015 Meeting - Draft TSTF Letter TSTF-425 Requirements Clarification ML12355A1612012-12-18018 December 2012 PG&E Handouts from the December 18, 2012, Meeting with the NRC Related to Emergency Core Cooling System Evaluations (TAC Nos. MF0313 and MF0315) ML12236A3322012-08-23023 August 2012 Non-proprietary - Presentation for September 13, 2012, Proposed License Amendment Request for Spend Fuel Pool Criticality Analysis ML12228A6292012-08-16016 August 2012 Report ITAAC Presentation ML1202500792012-01-18018 January 2012 Project Plan for Diablo Canyon Digital Upgrade of Process Protection System LAR Review ML1202500572012-01-18018 January 2012 Meeting Slides Process Protection System Replacement LAR Acceptance Review Meeting Presentation ML11242A0502011-08-30030 August 2011 Slides - Licensee Perspective on ITAAC Completion Process NRC Commission Briefing ML0803706102008-01-11011 January 2008 Westinghouse Electric Company LLC, LTR-CDME-08-2, Rev. 1 NP-Attachment, Meeting Handouts from the December 13, 2007 Meeting with Wolf Creek and NRR on H*/B*. ML0734800872007-12-12012 December 2007 D.C. Cook Meeting Handout on Ice Condenser Ice Fusion ML0715901212007-05-30030 May 2007 Mrp/Prwog Mitigation Briefing, Industry Update PWROG Farley Zinc Program. ML0602303832006-01-18018 January 2006 NA2 #54 Destructive Exam Results (MRP) ML0529208222005-09-15015 September 2005 Presentation for 09/15/2005 Meeting with R. E. Ginna SBLOCA EPU Results Summary ML0520900382005-07-20020 July 2005 Attachment for the Summary of July 20, 2005 Meeting Between NRC and NEI, Cipims/Itaac Verification Demonstration Program, Phase I Report, Revision 0 ML0323700182003-08-14014 August 2003 & 08/21/03, Slides Presentation from Westinghouse Discussion on Increased Steam Generator Tube Plugging & Reload Methodology at St. Lucie Unit 2 ML0310806392003-04-17017 April 2003 FPL Presentation Slides Regarding Changes Needed to Support Increased Steam Generator Tube Plugging ML0227603992002-09-25025 September 2002 Firstenergy Nuclear Operating Co., & Bnfl Westinghouse Electric Co., LLC, Meeting on Risk-Informed In-service Inspection(Is) Augmented High Energy Line Break (HELB) 2024-09-17 Category:Slides and Viewgraphs MONTHYEARML24261B9482024-09-17017 September 2024
[Table view]Some use of "" in your query was not closed by a matching "".ACRS 9-20 PWROG Presentation Slides PWROG-18068 ML24197A1742024-07-18018 July 2024 Public Workshop on Risk Metrics for Advanced Reactors - Presentation from Westinghouse - Challenges and Lessons Learned in Applying NEI 18-04 During Active Design ML24178A0302024-06-26026 June 2024 Presentation Supporting Meeting with U. S. Nuclear Regulatory Commission and NEI Concerning Power Uprates Westinghouse – PA-SEE-2067 DVR Applications Nuclear Industry Power Uprating Workshop – May 29, 2024 ML24134A2762024-05-13013 May 2024 Enclosure 2: Westinghouse Open Session Slide Package for the May 16, 2024, Pre-Application Meeting on Leu+ Expansion at the Columbia Fuel Fabrication Facility ML24092A1222024-03-29029 March 2024 Westinghouse, Kravec Slides ML24093A0182024-03-29029 March 2024 Kravec_Revised-Slides ML24053A2062024-01-31031 January 2024 Westinghouse - NRC Hf Remote Operations Workshop - 1-31-2024 ML23324A2432023-10-24024 October 2023 S1P11 - Huegel 2 Additive Manufacturing at Westinghouse - NRC October 2023 Workshop ML23271A1612023-09-28028 September 2023 PSEG Non-Proprietary Presentation for Pre-submittal Meeting on September 28, 2023 ML23261C3792023-09-27027 September 2023 NEI 22-04 Pre-Submittal Meeting with NRC - September 27, 2023 ML23251A1212023-09-12012 September 2023 RHR Flow Rate Reduction During Mode 6 Operation at 23 Ft. Refueling Water Level Technical Specification Change NON-PROPRIETARY Slides ML23174A0562023-06-26026 June 2023 Slides for TSTF-505 Pre-Submittal Public Teleconference 6-26-2023 ML23160A1512023-06-15015 June 2023 25 - Industry - Industry Perspectives on ASME III and XI Pre-Service Inspection ML23053A3332023-03-16016 March 2023 NRC RIC Presentation Tegeler TH23 a ML23067A3242023-03-0707 March 2023 Presentation - Code Case N-894 Alternative Rules for Repair of Classes 1, 2, and 3 Austenitic Stainless Steel Piping with Thermal Fatigue Cracking ML22319A0012022-11-14014 November 2022 Constellation Energy Generation, LLCs Presentation for November 10, 2022 Public Meeting with NRC ML22164A8082022-06-13013 June 2022 Westinghouse, Presentation GLIMM-RPS-PM-L1-000008, Revision 0 ML22143A8322022-05-25025 May 2022 13b: EPRI-MRP - PWROG Irrad SS Fracture Toughness Update ML22080A1522022-03-21021 March 2022 Non-Proprietary Presentation for March 31, 2022 Pre-Submittal Meeting with Constellation Energy Generation, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 ML22061A1132022-02-17017 February 2022 3A-6_of_6-Randelovic_EPRI_External_Flooding_PRA_Guidance-Poster-SLIDES ML21327A0762021-11-23023 November 2021 Sc Solutions Presentation on Efficient Licensing Pathway for Nonlinear Seismic Analysis ML21278A5452021-10-20020 October 2021 Digital Modernization Project LAR Pre-submittal Meeting Presentation Slides October 20, 2021 ML21183A0632021-06-24024 June 2021 Encl 2: Publicly Available Presentation, Request for Amendment of USA/9380/B(U)F-96 for Model No. Traveller Std and Xl Packages ML21060B2112021-02-26026 February 2021 Westinghouse Electric Company Pre-Submittal of Presentation for Meeting to Discuss Design Certification Extension for AP1000 ML21026A0212021-02-0404 February 2021 February 4, 2021 Columbia Risk Reduction & Environmental Update ML20211L0772020-07-28028 July 2020 Presentations for July 30, 2020 Higher Burnup Workshop - EPRI Presentation ML20143A0422020-05-22022 May 2020 Presentation Slides - Technical Justification for the Ghent Version 2 Probe Qualification and Probability of Detection - May 26, 2020 (Non-Proprietary Version) ND-19-0962, AP1000 Structural Reconciliation - Westinghouse Electric Company & Southern Nuclear Company Technical Exchange Meeting: August 13, 20192019-08-0202 August 2019 AP1000 Structural Reconciliation - Westinghouse Electric Company & Southern Nuclear Company Technical Exchange Meeting: August 13, 2019 ML17291B0282017-10-17017 October 2017 Submittal of Slide Package Westinghouse Encore Lead Test Rod Program Byron Unit 2 (Proprietary/Non-Proprietary) ML17296A2032017-10-0303 October 2017 Accident Tolerant Fuel Lead Test Assembly Deployment ML16188A3682016-07-0606 July 2016 Audit Presentation - Westinghouse Methodology for South Texas Unit 1 LAR: Operation with 56 Control Rods ML15209A8922015-07-23023 July 2015 Westinghouse Electric Co., - WCAP-10325-P-A Methodology Material Properties as Applied in the Watts Bar Containment Analysis. ML12355A1612012-12-18018 December 2012 PG&E Handouts from the December 18, 2012, Meeting with the NRC Related to Emergency Core Cooling System Evaluations (TAC Nos. MF0313 and MF0315) ML12236A3322012-08-23023 August 2012 Non-proprietary - Presentation for September 13, 2012, Proposed License Amendment Request for Spend Fuel Pool Criticality Analysis ML12228A6292012-08-16016 August 2012 Report ITAAC Presentation ML1202500792012-01-18018 January 2012 Project Plan for Diablo Canyon Digital Upgrade of Process Protection System LAR Review ML1202500572012-01-18018 January 2012 Meeting Slides Process Protection System Replacement LAR Acceptance Review Meeting Presentation ML11242A0502011-08-30030 August 2011 Slides - Licensee Perspective on ITAAC Completion Process NRC Commission Briefing ML1004709472010-01-21021 January 2010 Simplified Equation for Gas Transport to Pumps ML0715901212007-05-30030 May 2007 Mrp/Prwog Mitigation Briefing, Industry Update PWROG Farley Zinc Program. ML0627703242006-10-19019 October 2006 Draft Slide Presentation for Nrc/Entergy/Westinghouse Pre-Submittal Meeting (Non-Proprietary) ML0602303832006-01-18018 January 2006 NA2 #54 Destructive Exam Results (MRP) ML0527101642005-09-22022 September 2005 Westinghouse - Meeting Slides 9/22/05 ML0529208222005-09-15015 September 2005 Presentation for 09/15/2005 Meeting with R. E. Ginna SBLOCA EPU Results Summary ML0323700182003-08-14014 August 2003 & 08/21/03, Slides Presentation from Westinghouse Discussion on Increased Steam Generator Tube Plugging & Reload Methodology at St. Lucie Unit 2 ML0310806392003-04-17017 April 2003 FPL Presentation Slides Regarding Changes Needed to Support Increased Steam Generator Tube Plugging ML0215503982002-04-23023 April 2002 Application of Master Curve Facture Toughness for Reactor Pressure Vessel Integrity Evaluation of BVPS-1 2024-09-17 |
Retrieved from "https://kanterella.com/w/index.php?title=ML24092A122&oldid=3686029"