ML24086A469
| ML24086A469 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 03/21/2024 |
| From: | Hilbert L Virginia Electric & Power Co (VEPCO) |
| To: | Office of Nuclear Material Safety and Safeguards, Document Control Desk |
| References | |
| 24-114 | |
| Download: ML24086A469 (1) | |
Text
VIRGINIA ELECTRIC AND POWER COMPAJ'.'N RICHMOND, VIRGINIA 23261 March 211 2024 Attention: Document Control Desk Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards United States Nuclear Regulatory Commission Washington, D. C. 20555-0001 Serial No.24-114 NAPS/RAP Docket Nos. 72-16 72-56 License No. SNM-2507 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION ENERGY VIRGINIA}
NORTH ANNA POWER STATION INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
SUMMARY
OF FACILITY CHANGES, TESTS AND EXPERIMENTS Pursuant to 10 CFR 72.48(d)(2), a report containing a brief description of any changes, tests, and experiments, including a summary of the evaluation of each, must be submitted to the NRC, at intervals not to exceed 24 months. Attachment 1 provides a summary description of Facility Changes, Tests and Experiments identified in 10 CFR 72.48 Evaluations performed for the North Anna Power Station ISFSI during 2023.
If you have any questions, please contact Marcus A Hofmann at (540) 894-2100.
Lisa Hilbert Site Vice President Commitments made in the letter: None Attachments
- 1. 1 O CFR 72.48 Summary Description of Facility Changes( Tests and Experiments cc:
U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555..:0001 United States Nnclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 NRG Senior Resident Inspector North Anna Power Station
ATTACHMENT 1 10 CFR 72.48
SUMMARY
DESCRIPTION OF FACILITY CHANGES, TESTS AND EXPERIMENTS None.
NORTH ANNA POWER STATION ISFSI VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION ENERGY VIRGINIA)