ML24074A419

From kanterella
Jump to navigation Jump to search
Region 2 RFI - 2024 Program Inspections
ML24074A419
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 10/12/2023
From: Jacqwan Walker
Division of Reactor Safety II
To:
Shared Package
ML24074A416 List:
References
Download: ML24074A419 (1)


Text

EMERGENCY PREPAREDNESS PROGRAM INSPECTION REQUEST FOR INFORMATION The U.S. Nuclear Regulatory Commission (NRC) will perform a baseline Emergency Preparedness program inspection at your facility during the period listed in Attachment 1. The inspection will evaluate activities in the Emergency Preparedness cornerstone using NRC Inspection Procedures (IPs) 71114.02, Alert and Notification System Testing; 71114.03, Emergency Response Organization Staffing and Augmentation System; 71114.04, Emergency Action Level and Emergency Plan Changes; 71114.05, Maintenance of Emergency Preparedness; and Emergency Preparedness sections of 71151 Performance Indicator Verification.

Experience has shown that this inspection is resource-intensive for both the NRC inspectors and your staff. To minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection (Attachment 2). It is important that these documents are up-to-date and complete, to minimize the number of additional documents requested during the preparation, and/or the onsite portions of the inspection.

If there is a need to revise your scheduled dates, or questions about this inspection or the material requested, please contact the lead inspector, Jacqwan Walker at 404-997-4618 (Jacqwan.Walker@nrc.gov), or the Operations Branch 2 Branch Chief, Matthew Endress at 404-997-4718 (Matthew.Endress@nrc.gov).

This letter and its enclosure will be made available for public inspection and copying at https://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, and Requests for Withholding.

PAPERWORK REDUCTION ACT STATEMENT This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011.

PUBLIC PROTECTION NOTIFICATION The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.

2024 Region II Emergency Preparedness Program Inspection Schedule Program Inspections Site Dates of Inspection License Number(s)

Docket Number(s)

Dominion Summer March 4 - 8 NPF-12 50-395 Surry September 23 - 27 DPR-32, DPR-37 50-280, 50-281 Duke Harris March 18 - 22 NPF-63 50-400 McGuire November 4 - 8 NPF-9, NPF-17 50-369, 50-370 Robinson June 3 - 7 DPR-23 50-261 FPL Turkey Point January 22 - 26 DPR-31, DPR-41 50-250, 50-251 Southern Hatch December 2 - 6 DPR-57, NPF-5 50-321, 50-366 TVA Browns Ferry April 8 - 12 DPR-33, DPR-52, DPR-68 50-259, 50-260, 50-296 Watts Bar December 9 - 13 NPF-90, NPF-96 50-390, 50-391 EMERGENCY PREPAREDNESS PROGRAM INSPECTION DOCUMENTS Inspection Procedures (IPs):

71114.02 Alert and Notification System Testing 71114.03 Emergency Response Organization Staffing and Augmentation System 71114.04 Emergency Action Level and Emergency Plan Changes 71114.05 Maintenance of Emergency Preparedness 71151 Performance Indicator Verification Note: About 3 weeks prior to the inspection, provide as a minimum, an electronic version of the Emergency Plan (E-Plan), 10 CFR 50.54(q) evaluation/screening packages of changed Emergency Action Level (EAL), E-Plan, and risk-significant EP implementing procedures, and Corrective Action Program (CAP) entries relating to each section below, since the last inspection (including those written by Corporate). The preferred file format is Word or searchable.pdf files on CERTREC. [Note that the inspectors cannot accept data provided on USB or flash drives due to NRC IT security policies.] Please organize the information as it is arranged below (e.g., a folder labeled 71114.02 ANS, or Miscellaneous, etc.). It is not the intent that large or burdensome data be scanned for this purpose (e.g.,

Performance Indicator documents). This data will be inspected using original documentation.

The current version of these documents is expected unless specified otherwise. If there are questions regarding the documents requested, please do not hesitate to contact the lead inspector.

71114.02 Alert and Notification System Evaluation Federal Emergency Management Agency (FEMA) approved Alert and Notification System (ANS) design report and any current associated correspondence ANS testing procedure(s)

ANS equipment technical manual(s)

ANS equipment testing results (raw data) since the last EP program inspection ANS equipment maintenance records since the last EP program inspection Changes to the ANS system, implementing procedures, testing procedures, and the maintenance program including any supporting FEMA approval letters since the last EP program inspection Information provided to the public inside the 10-mile plume exposure pathway 71114.03 Emergency Response Organization Staffing and Augmentation System Current Emergency Response Organization (ERO) roster ERO Duty Roster in-effect during the week of the inspection (can be provided upon arrival)

ERO and augmentation implementing procedures and changes since the last EP program inspection NUREG 0654 Table B1 site equivalent and On-shift Staffing Analysis report ERO training program procedure Emergency Preparedness (EP) staff training program and qualification records ERO augmentation testing results since the last EP program inspection 71114.04 Emergency Action Level and Emergency Plan Changes Governing document for 10 CFR 50.54(q) evaluation process 10 CFR 50.54(q) evaluator training program and qualification records Signed and dated 10 CFR 50.54(q) screening/evaluation packages for:

All EAL changes since the last NRC Emergency Preparedness (EP) inspection All E-Plan changes since the last NRC EP inspection Changes to the Risk Significant EP implementing procedures (including corporate/fleet procedures) since the last NRC EP program inspection Current and immediately previous revisions of EAL, E-Plan, and EP implementing procedures CAP entries specific to EAL, E-Plan, and EP procedure changes since the last NRC EP inspection (including those written by Corporate) 71114.05 Maintenance of Emergency Preparedness Governing documents for the assessment process CAP governing procedures All EP program assessments, not including INPO performed assessments, since the last EP program inspection Drill and exercise critiques since the last EP program inspection Critiques of actual events resulting in implementation of the E-Plan since the last EP program inspection Governing documents for 10 CFR 50.54(q) evaluation process 10 CFR 50.54(t) audits, audit checklists, and subsequent State/local correspondence since the last EP program inspection Current Letters of Agreement with offsite agencies Completed maintenance records and availability-tracking information for equipment important to EP (e.g., Heating and Ventilation system in ERFs and Radiation Monitors called out in EALs, etc.) since the last EP program inspection Last Evacuation Time Estimates Analysis and annual review documentation Emergency Response Facility (ERF) activation procedures, including backup and alternate facilities 71151 Performance Indicator Verification Governing document for the performance indicator (PI) process Drill and Exercise Performance (DEP), ERO, and ANS PI data submitted since the last NRC EP inspection as documented in the associated inspection report (hard copies can be provided upon arrival)

DEP documentation and evaluations since the last NRC EP inspection CAP entries specific to the three EP PIs, since the last NRC EP inspection (including those written by Corporate)

Miscellaneous Procedures and Records Safety Evaluation Report approved E-Plan and EALs Corporate and Departmental processes or procedures for EP staff Matrix of Drill Types performed and accounted for during the 8-year cycle Lead Inspector Contact Information:

Jacqwan Walker Sr. Emergency Preparedness Inspector Operations Branch 2 Division of Reactor Safety 404-997-4618 Jacqwan.Walker@nrc.gov Mailing Address:

US NRC Region II Attn: Jacqwan Walker 245 Peachtree Center Avenue, Suite 1200 Atlanta, GA 30303